Planning Application Status
PL20240103
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Title | Location | Date | Time |
---|---|---|---|
Planning Commission, 2024-11-14, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 11/14/2024 | 5:00 PM |
Recommendation
Approved with Conditions
|
|||
City Council, 2024-12-03, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 12/03/2024 | 5:00 PM |
Resolution
Approved with Conditions
|
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Mineral Rights Notification Affidavit | Resolved | |
Planning Department
Mineral Rights Notification: Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
_
Initial Notice 04/24/24 [Kelly Douglas @ 04/25/2024 10:53 AM]
Hearing Notice 10/31/24 [Kelly Douglas @ 11/05/2024 2:41 PM]
|
||
Civils Required at BP | Open | Prior to Issuance of Construction Permit |
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/Grading Permit application for review and approval prior to the start of any construction. If an Improvements agreement is considered, Civil Construction Plans shall be submitted for review and approval through the DRT process.
|
||
Civils Required | Open | Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat |
Engineering
Civil Construction Plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to DRT for review and approval prior to approval of any Improvements Agreement, Building Permit, Grading Permit, or Final Plat and prior to the start of any construction.
Reminder to address signage and pavers at Torian Plum with IA [Kelly Douglas @ 11/07/2024 9:25 AM]
|
||
Final Drainage Study prior to BP | Open | Prior to Issuance of Construction Permit |
Engineering
Prior to any construction permit issuance, the final signed and sealed drainage study shall be submitted.
|
||
Completion Letter (Private Improv.) | Open | Prior to Engineering Final Approval Inspection |
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be uploaded to the applicable building permit condition.
|
||
Miscellaneous Condition | Resolved | |
Fire Prevention
Fire Department Review (Reviewed By: Doug Shaffer)
1. The access along the west/burgess creek side is a multipurpose access that up to now has had a
30-foot-wide easement and 20- to 24-foot-wide paved surface. With its multipurpose use (Fire,
deliveries to multiple businesses, trash, and pedestrian) the Fire Department access standards
require this access to be 24 feet wide. The access standards do allow a reduction to 20’ wide if
all structures accessed are fire sprinklered. Above was copied from DRT comments dated 7-25-204 page 8&9 [Mike Middleton @ 08/23/2024 2:37 PM]
|
||
Critical Improvements - Sidewalk | Open | Prior to Issuance of TCO/CO/CC |
Planning Department
The West Promenade Extension as shown on Sheet C.100 and C.110 is considered a critical improvement and shall be constructed and approved and/or accepted, or surety provided, prior to recording of a Final Plat. This critical subdivision improvement shall be complete prior to issuance of a Construction Permit TCO/CO for PL20240125 development.
|
||
Critical Improvements - Drainage | Open | Prior to Recording of Final Plat |
Planning Department
Drainage improvements on Lot 1 and Parcel B Ski Hill Subd as shown on Sheet C.100 are considered critical improvements and shall be constructed and approved and/or accepted, or surety provided, prior to recording of a Final Plat. These critical subdivision improvements shall be complete prior to issuance of a Construction Permit for PL20240125 development.
|
||
Miscellaneous Condition | Open | |
Planning Department
Emergency access shall be maintained throughout construction.
|
||
Critical Improvements - Water and Sewer | Open | Prior to Recording of Final Plat |
Mount Werner Water & Sanitation
Upsizing of sanitary sewer main is considered a critical improvement and must be constructed and approved or accepted, or surety provided, prior to issuance of a Certificate of Occupancy/Completion or approval of a Final Plat, whichever occurs first.
|
||
Miscellaneous Condition | Open | Prior to Recording of Final Plat |
Mount Werner Water & Sanitation
Easements must cover all MWW concerns, be finalized, reviewed, accepted and executed by all parties prior to recording of final plat.
1) The sanitary sewer easement is to be dedicated and accepted via separate instrument, record/instrument number to be written onto easement area reference on plat. Work with MWW staff directly to finalize language
2) Public Improvements Easement Agreement must be modified to include utilities, access and include Torian as signatories.
3) Off Site promenade, access, and utility easement legal description must specifically state access and utility (Torain PH1)
|
||
Outstanding Fees | Resolved | |
Planning Department
Outstanding fees are required to be paid.
_
Paid 11/05/24 [Kelly Douglas @ 11/05/2024 2:43 PM]
|
||
Mailing Affidavit | Resolved | |
Planning Department
Mailing Affidavit: Submit a signed affidavit no later than eight days prior to the required public hearing or final decision date confirming the required mailed notice has been completed in accordance with Section 703.C.2.
_
Complete 10/31/24 [Kelly Douglas @ 11/05/2024 2:42 PM]
|
There are no related items for this planning application.