Summary

B-21-625
New Commercial Building
Closed
GONDOLA SQUARE CONDOS
New
B - Business
The Work of Project is defined by the Contract Documents and consists of new construction and renovation of the Steamboat Base Village. The work for the Goldwalk project includes a new entry walk, referred to as the Goldwalk.
05/27/2021
07/22/2021
07/22/2024
01/06/2023

Locations

Property
211077001

Address
2305 MT WERNER CIR

Permits

Permit Number: B-21-625

Building
Finaled

Reviews

Review Type Outcome Est. Completion Date Completed
COO Review - Engineering Approved 01/05/2023 01/05/2023
COO Review - Planning Approved 12/28/2022 01/03/2023
COO Review - Building Code Approved 12/28/2022 12/28/2022
Planning Review TCO Approved 12/06/2021 12/09/2021
Engineering Review TCO Approved 12/06/2021 12/07/2021
Finance Department Review TCO Approved 12/06/2021 12/06/2021
Building Code Review TCO Approved 12/06/2021 12/06/2021
Utilities Review - Mt. Werner TCO Approved 12/06/2021 11/30/2021
Fire Code Review TCO Approved 12/06/2021 11/29/2021
GIS Land Development Review Approved 12/06/2021 11/29/2021
Building Code Review Approved 10/21/2021 10/25/2021
Building Code Review Approved 08/30/2021 08/16/2021
Planning Review Approved 08/09/2021
Engineering Review Approved 07/15/2021
Legacy Permitting Review Approved w/ Conditions 07/14/2021
Fire Code Review Approved 07/14/2021
External Agencies Review Approved 07/06/2021
External Agencies Review Approved w/ Conditions 07/06/2021
Legacy Permitting Review Approved 07/06/2021
Legacy Permitting Review Approved 06/22/2021
GIS Land Development Review Approved 06/17/2021
Utilities Review - City Complete 06/15/2021
Finance Department Review Approved 06/15/2021

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection Failed 07/27/2021
SysAdmin
Foundation Inspection Complete 07/28/2021
SysAdmin
Legacy Permitting Inspection Complete 07/30/2021
SysAdmin
Foundation Inspection Complete 08/09/2021
SysAdmin
Legacy Permitting Inspection Complete 08/11/2021
SysAdmin
Foundation Inspection Partial Pass 8/24/2021 8/24/2021 08/24/2021
Don Marchbanks
Structural Inspection Failed 9/2/2021 9/2/2021 09/02/2021
Don Marchbanks
Foundation Inspection Partial Pass 9/14/2021 9/14/2021 09/14/2021
Don Marchbanks
Structural Inspection Partial Pass 10/7/2021 10/7/2021 10/07/2021
Don Marchbanks
Foundation Inspection Partial Pass 10/22/2021 10/22/2021 10/22/2021
Ted Allen
Structural Inspection Partial Pass 10/28/2021 10/28/2021 10/28/2021
Todd Carr
Framing Inspection Partial Pass 10/28/2021 10/28/2021 10/28/2021
Todd Carr
Framing Inspection Partial Pass 10/29/2021 10/29/2021 10/29/2021
Todd Carr
Framing Inspection Partial Pass 11/3/2021 11/3/2021 11/03/2021
Todd Carr
Framing Inspection Partial Pass 11/5/2021 11/5/2021 11/05/2021
Todd Carr
Framing Inspection Partial Pass 11/5/2021 11/5/2021 11/05/2021
Todd Carr
Drywall Inspection Not Ready 11/5/2021 11/5/2021 11/05/2021
Todd Carr
Drywall Inspection Not Ready 11/5/2021 11/5/2021 11/05/2021
Todd Carr
Framing Inspection Partial Pass 11/12/2021 11/12/2021 11/12/2021
Todd Carr
Framing Inspection Partial Pass 11/16/2021
Todd Carr
Building Final Inspection Failed 11/24/2021 11/24/2021 11/24/2021
Todd Carr
Corrections:


Miscellaneous
Carried Forward
11/24/2021
Prior to a TCO being approved on the escalator and stairs the below work should be completed. 1. Install handrails on the new stairs that meet clearance per the IBC Chapter 10 allowing a free 1 1/2" space between the finished wall (stone) and the handrail the whole way up the stairs on both sides, currently this is not met and in some cases touching the stone. 2. Caulk all penetration into the wall on the north side of the escalator where wires or other penetrations enter the wall to keep moisture and water out for the winter season. 3. Enclose the bottom of the plywood constructed cap that extends beyond the north foundation wall to keep this weather tight for the winter season. 4. To approve the TCO on use of the escalator I will need the Final Inspection approval letter from NWCOGG, also please provide me documentation as to when the escalator sensor is replaced that is broken, and also when final cleaning is completed as well.

Final Site Inspection Failed 12/07/2021
Emrick Soltis, P.E., CFM
Building Final Inspection Partial Pass 12/10/2021 12/10/2021 12/10/2021
Todd Carr
Corrections:


Miscellaneous
Outstanding
12/10/2021
This permit is not closing, but rather construction work will pause for the winter season until April of CY2022 when work will resume after the ski season. All work will require new final inspections next summer during CY2022 when work is completed.

Miscellaneous
Outstanding
12/10/2021
The exterior exit door that leads to the exterior from underneath the escalator will required plywood to be installed on the exterior side so it can be maintained over winter to lead to a temporary construction exit door that leads to the promenade area, the temp door must be freely open from inside the barricaded area to allow free exit, it may be locked on promenade side so the public does not enter the construction area. Please complete this work as soon as possible

Final Site Inspection Partial Pass 12/21/2021
Emrick Soltis, P.E., CFM
Framing Inspection Partial Pass 5/11/2022 5/11/2022 05/11/2022
Todd Carr
Corrections:


Miscellaneous
Outstanding
05/11/2022
The steel stud framing on the north side of the escalator has been conditionally approved today, pending a Stamped Addendum to be received from the Architect of Record on the changes to the location of the exterior wall, and exterior wall finished over the steel studs. The wall has been moved outward now due to a change in exterior finished to the sheeting and exterior finish materials, the steel bottom plate is now projection over the concrete footer by about an 1", the wall was moved outward to accommodate the change in not installing stone on this wall per the framing contractor. Please have the Architect provide us with a full addendum on the changes to this wall and all exterior finishes and water proofing details.

Framing Inspection Partial Pass 8/11/2022 8/11/2022 08/11/2022
Ron Norton
Framing Inspection Partial Pass 8/15/2022 8/15/2022 08/15/2022
Ron Norton
Framing Inspection Partial Pass 8/16/2022 8/16/2022 08/16/2022
Ron Norton
Building Final Inspection Partial Pass 9/23/2022 9/23/2022 09/23/2022
Todd Carr
Corrections:


Building Department Corrections to be Completed
Carried Forward
09/23/2022
TCO approved: 1. Complete exterior wall on north side, and the pavers that lead you from the exit door to ski time square. 2. Complete the south side exterior wall along the escalator, or at minimum an addendum on how it will be finished per code for exterior finishes. 3. Fire Caulk penetration in electrical room under escalator. 4. Install stairs in ski corp facility tool room that lead up to the concrete floor that leads towards the electrical room and required exit door. 4. Complete all work per the plans, and provide RCRBD with any As-Built conditions that were altered from the original plans under this permit, and provide final copies of all special inspection reports.

Framing Inspection Partial Pass 9/23/2022 9/23/2022 09/23/2022
Todd Carr
Framing Inspection Partial Pass 9/27/2022 9/27/2022 09/27/2022
Ron Norton
Framing Inspection Partial Pass 9/29/2022 9/29/2022 09/29/2022
Ron Norton
Framing Inspection Partial Pass 10/4/2022 10/4/2022 10/04/2022
Jeff Yeiser
Building Final Inspection Passed 12/21/2022 12/21/2022 12/21/2022
Ron Norton
Corrections:


Miscellaneous
Resolved
12/21/2022
Prior to a TCO being approved on the escalator and stairs the below work should be completed. 1. Install handrails on the new stairs that meet clearance per the IBC Chapter 10 allowing a free 1 1/2" space between the finished wall (stone) and the handrail the whole way up the stairs on both sides, currently this is not met and in some cases touching the stone. 2. Caulk all penetration into the wall on the north side of the escalator where wires or other penetrations enter the wall to keep moisture and water out for the winter season. 3. Enclose the bottom of the plywood constructed cap that extends beyond the north foundation wall to keep this weather tight for the winter season. 4. To approve the TCO on use of the escalator I will need the Final Inspection approval letter from NWCOGG, also please provide me documentation as to when the escalator sensor is replaced that is broken, and also when final cleaning is completed as well.

Conditions

Condition Status Category
Miscellaneous Conditions Resolved Prior to Certificate of Occupancy/Completion
Building Department
05/01/2022
TCO approved: 1. Complete exterior wall on north side, and the pavers that lead you from the exit door to ski time square. 2. Complete the south side exterior wall along the escalator, or at minimum an addendum on how it will be finished per code for exterior finishes. 3. Fire Caulk penetration in electrical room under escalator. 4. Install stairs in ski corp facility tool room that lead up to the concrete floor that leads towards the electrical room and required exit door. 4. Complete all work per the plans, and provide RCRBD with any As-Built conditions that were altered from the original plans under this permit, and provide final copies of all special inspection reports.
Use Tax Reconciliation Resolved Prior to Issuance of CO/CC
Finance
Use Tax Reconciliation -------------------------------------- The City of Steamboat Springs Finance department has approved a TEMPORARY CERTIFICATE on this project. A construction use tax reconciliation must be completed within 90 days to be compliant with the City of Steamboat Springs Municipal Code AND prior to signoff for the FINAL certificate of occupancy/completion with the Routt County Building Department. Please do one reconciliation for the entire project, accounting for all permits and city use tax deposits associated with this project.
Miscellaneous Conditions Resolved Prior to Issuance of CO/CC
Planning Department
The applicant shall complete the entirety of the project prior to final CO. TCO shall expire January 31, 2022.

Related Permit & Planning Applications

Reference Number Status Type
SPRMH210082 Expired Mechanical
SPRPL210192 Closed Plumbing
SPRMH210774 Closed Mechanical

Documents & Images

Date Uploaded File Type Name
Other CERTIFICATE OF OCCUPANCY.PDF
Letter CERTIFICATE OF TEMPORARY OCCUPANCY.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
05/27/2021 Legacy Permit Document Saunders COI 1461564876.pdf
05/27/2021 Legacy Permit Document CSMP_SBV_GoldWalk.pdf
05/27/2021 Legacy Permit Document CSMP_SBV_GoldWalkc.pdf
05/27/2021 Legacy Permit Document 01 - GENERAL - GOLDWALK - SSc.pdf
05/27/2021 Legacy Permit Document 02 - CIVIL - GOLDWALK - SSc.pdf
05/27/2021 Legacy Permit Document 04 - STRUCTURAL - GOLDWALK -SSc.pdf
05/27/2021 Legacy Permit Document 05-ARCH-COMPOSITES-GOLDWALK-SSc.pdf
05/27/2021 Legacy Permit Document 06-ARCH-GOLDWALK-SSc.pdf
05/27/2021 Legacy Permit Document 07 -MECHANICAL-GOLDWALK-SSc.pdf
05/27/2021 Legacy Permit Document 08-PLUMBING-GOLDWALK-SSc.pdf
05/27/2021 Legacy Permit Document 09-ELECTRICAL-GOLDWALK-SSc.pdf
05/27/2021 Legacy Permit Document 16-TECHNOLOGY-GOLDWALK-c.pdf
05/28/2021 Legacy Permit Document RE Permit Application TB-21-625.msg
05/28/2021 Legacy Permit Document Permit Application TB-21-625.msg
07/08/2021 Legacy Permit Document LT20210701-Arch Letter to RCRBD- TB-21-625-BP3 Gold Walk -permit response_SS.pdf
07/08/2021 Legacy Permit Document SBT Community Engagement and Outreach Planv2.pdf
07/08/2021 Legacy Permit Document 20210701_BP3 Gold Walk Bulletin 03 - Arch Drawings_SS.pdf
07/08/2021 Legacy Permit Document 20210701_BP3 Gold Walk Bulletin 03 - Electrical Drawings.pdf
07/08/2021 Legacy Permit Document 20210701_BP3 Gold Walk Bulletin 03 - Landscape Drawings.pdf
07/08/2021 Legacy Permit Document 20210701_BP3 Gold Walk Bulletin 03 - Photometrics (Reference Only).pdf
07/19/2021 Legacy Permit Document B-21-625 RECORD SET_ARCH.pdf
07/19/2021 Legacy Permit Document B-21-625 RECORD SET_CIVIL.pdf
07/19/2021 Legacy Permit Document B-21-625 RECORD SET_DOCS.pdf
07/19/2021 Legacy Permit Document B-21-625 RECORD SET_GENERAL.pdf
07/19/2021 Legacy Permit Document B-21-625 RECORD SET_MEP.pdf
07/19/2021 Legacy Permit Document B-21-625 RECORD SET_STRUCTURAL.pdf
07/19/2021 Legacy Permit Document CSMP_SBV_GoldWalkc.pdf
08/03/2021 Legacy Permit Document BP3_210618_PromGW_Bull1_SiteElec_Landsca.pdf
08/03/2021 Legacy Permit Document BP3_210629_GW_Bull2_BoilerRoom_Artwall.pdf
08/03/2021 Legacy Permit Document BP3_210715_GW_Bull4_Micopiles_Fdnt.pdf
08/03/2021 Legacy Permit Document BP3_RFI_025_GW_Bearing_Conditions_RESP.pdf
08/03/2021 Legacy Permit Document BP3_MicroPiles_210714.pdf
08/06/2021 Legacy Permit Document BP3_210804_GW_Bull5_Trnsfmr_Location.pdf
09/23/2021 Plans BP3_RFI_032_Sewer_Encase_Conf_RESP
09/27/2021 BP3_RFI_081R1_Fut_BldB_HW_CH_Acc_RESP (Stamped)
09/27/2021 Plans BP3_RFI_014_Boiler_Plant_UG_Plumb_Conf_R (Stamped)
10/25/2021 BP3_RFI_097_Art_Brand_Wall_Supple_RESP (Stamped)
12/10/2021 Report Inspection Report (Building Final Inspection)