Planning Application Status
PL20240125
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Title | Location | Date | Time |
---|---|---|---|
Planning Commission, 2024-11-14, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 11/14/2024 | 5:00 PM |
Recommendation
Approved with Conditions
|
|||
City Council, 2024-12-03, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 12/03/2024 | 5:00 PM |
Resolution
Tabled with Date
|
|||
City Council, 2024-12-17, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 12/17/2024 | 5:00 PM |
Resolution
Approved with Conditions
|
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
___
Complete with Preliminary Plat PL20240103. [Kelly Douglas @ 05/06/2024 9:38 AM]
|
||
Mineral Rights Notification Affidavit | Resolved | |
Planning Department
Mineral Rights Notification: Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
|
||
Building Dept Informational Comments | Resolved | Prior to Issuance of Construction Permit |
Building Department
At this time the Building Department has reviewed the parking plans for ADA compliance, and we agree and understand the total number of ADA spots provided are added on all parking spaces that are not valet spaces. We have not done full ADA review on total number of Type A Vs Type B for the Units, as we assume these are R-2 but are not sure if they will be used as nightly like hotel units or owned by private owners, this review is TBD. At this point due to the plans being seim conceptual with no Building Code Study's prepare, nor any Life Safety Plans, we have no additional comments. We look forward to working with you as the design work progresses, and would be happy to have meetings as design work moves forward in advance of actual permit applciation submittal as questions arise.
|
||
Third Party Certification (Base Area) | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
CDC Section 440 (Base Area Design Standards) requires all buildings in the Base Area to comply with third-party certification of building materials and construction techniques that are consistent with a nationally recognized sustainable building program or alternative approved by the Director of Planning and Community Development. Prior to issuance of a Building Permit, the owner shall provide documentation to the City about the proposed program the project will comply with. Prior to Certificate of Occupancy/Completion, the owner shall provide the City with proof of completion of the chosen sustainable building program.
|
||
Civils Required | Open | Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat |
Engineering
Civil Construction Plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to DRT for review and approval prior to approval of any Improvements Agreement, Building Permit, Grading Permit, or Final Plat and prior to the start of any construction.
|
||
Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
Engineering
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion: • Drainage improvements • Permanent storm water quality treatment facilities • Ski Time Square Frontage improvements • South Promenade Extension
|
||
Record Drawings/CAD Files | Open | Prior to Issuance of CO/CC |
Engineering
Record Drawings/CAD Files including drainage, PWQTF(s), and sidewalks shall be submitted prior to Final Engineering Site Inspection.
|
||
PWQ O&M prior to CO/CAC | Open | Prior to Issuance of CO/CC |
Engineering
Prior to Certificate of Occupancy/Completion, an executed Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
|
||
Traffic Contribution prior to BP | Open | Prior to Issuance of Construction Permit |
Engineering
Prior to Building Permit issuance, the developer shall pay their proportionate share of potential future roadway and/or intersection improvements at Mt. Werner Rd. @ Mt. Werner Cir. intersection, calculated at 4.1% of current cost basis $4,169,033 (indexed to CDOT CCI) or $170,930.
|
||
Traffic Contribution prior to BP | Open | Prior to Issuance of Construction Permit |
Engineering
Prior to Building Permit issuance, the developer shall pay their proportionate share of potential future roadway and/or intersection improvements at Mt. Werner Rd. @ Pine Grove Rd. intersection, calculated at 2.9% of current cost basis $1,563,387 (indexed to CDOT CCI) or $45,338.
|
||
Mailing Affidavit | Resolved | |
Planning Department
Mailing Affidavit: Submit a signed affidavit no later than eight days prior to the required public hearing or final decision date confirming the required mailed notice has been completed in accordance with Section 703.C.2.
|
There are no related items for this planning application.