Permit Application Status
SPRNR231281
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Date Returned | Name |
---|---|
01/12/2024 | Landscape Plan (Received) (Stamped) |
01/12/2024 | Site Plan 11_17_23 (Received) (Stamped) |
01/12/2024 | Structural Calcs 10-26-23 REV1 (Stamped) |
01/12/2024 | CIVIL SET 11-17-23 (Received) (Stamped) |
01/12/2024 | Utility Plans (Received) (Stamped) |
01/12/2024 | CSMP (Received) (Stamped) |
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Utilities Review - Mt. Werner | Failed | 07/24/2024 | 07/24/2024 |
Beau Cahill
|
|||
Miscellaneous
Outstanding
07/17/2024
Additional plant investment fee due to Mt. Werner resulting from added fixtures in additional guest rooms (pool removed from calculations). Updated PIF calculations sent to applicant on 7/22/24.
|
|||
7.16.24: ASI 1, 2 & 3 | |||
Electrical Review | Approved | 07/24/2024 | 07/24/2024 |
Tom Cook
|
|||
7.16.24: ASI 2, 3 & 4 | |||
Planning Review | Failed | 07/24/2024 | 07/23/2024 |
Toby Stauffer, AICP
|
|||
Miscellaneous
Outstanding
07/17/2024
The two additional rooms require 2 additional parking spaces. The change is in substantial conformance with the approved plan. Amend the site plan and final plat to allocate the correct amount of parking spaces to Hotel A and Hotel B, currently Hotel B has more spaces than needed. The overage for spaces for Hotel B is also in substantial conformance.
|
|||
7.16.24: ASI 2, 3 & 4 | |||
Building Code Review | Approved | 07/24/2024 | 07/17/2024 |
Ted Allen
|
|||
7.16.24: ASI 1, 2 & 3 | |||
Utilities Review - Mt. Werner | Failed | 04/04/2024 | 04/05/2024 |
Beau Cahill
|
|||
Miscellaneous
Carried Forward
07/17/2024
Additional plant investment fee due to Mt. Werner resulting from added fixtures in additional guest rooms (pool removed from calculations). Updated PIF calculations sent to applicant
|
|||
Addendum ASI-1 | |||
Electrical Review | Approved | 04/04/2024 | 04/04/2024 |
Tom Cook
|
|||
Addendum ASI-1 | |||
Fire Code Review | Approved | 04/04/2024 | 04/04/2024 |
Matt Workman
|
|||
Addendum ASI-1 Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Matt Workman @ 04/04/2024 3:22 PM] | |||
Building Code Review | Approved | 04/04/2024 | 04/02/2024 |
Ted Allen
|
|||
Addendum ASI-1 | |||
Planning Review | Failed | 04/04/2024 | 03/28/2024 |
Toby Stauffer, AICP
|
|||
Miscellaneous
Carried Forward
07/17/2024
The two additional rooms require 2 additional parking spaces. The change is in substantial conformance with the approved plan. Consider amending the site plan and final plat to allocate the correct amount of parking spaces to Hotel A and Hotel B, currently Hotel B has more spaces than needed. The overage for spaces for Hotel B is also in substantial conformance.
|
|||
Addendum ASI-1 | |||
Planning Review | Approved | 01/12/2024 | 01/11/2024 |
Toby Stauffer, AICP
|
|||
Planning Review | Failed | 12/22/2023 | 12/29/2023 |
Malea Michael-Ferrier
|
|||
Miscellaneous
Outstanding
01/11/2024
Compliance with PL20230055, and PL20230056 conditions of approval required.
|
|||
Engineering Review | Approved | 12/22/2023 | 12/27/2023 |
Emrick Soltis, P.E., CFM
|
|||
Miscellaneous
Outstanding
12/15/2023
See outstanding conditions approved with PL20230056. Conditions are required to be satisfied prior to Engineering signoff.
|
|||
Utilities Review - Mt. Werner | Approved | 12/11/2023 | 12/11/2023 |
Beau Cahill
|
|||
Miscellaneous
Outstanding
12/11/2023
1) Plant Investment Fees due prior to approval
|
|||
PIF Fee's paid and plumbing revisions submitted | |||
Planning Review | Failed | 11/29/2023 | 11/29/2023 |
Toby Stauffer, AICP
|
|||
Miscellaneous
Carried Forward
12/15/2023
Compliance with PL20230055, and PL20230056 conditions of approval required.
|
|||
Engineering Review | Failed | 11/29/2023 | 11/29/2023 |
Emrick Soltis, P.E., CFM
|
|||
Miscellaneous
Carried Forward
12/15/2023
See outstanding conditions approved with PL20230056. Conditions are required to be satisfied prior to Engineering signoff.
|
|||
Utilities Review - Mt. Werner | Failed | 11/29/2023 | 11/29/2023 |
Beau Cahill
|
|||
Miscellaneous
Carried Forward
12/11/2023
1) Plant Investment Fees due prior to approval
|
|||
1) Plant Investment Fees due prior to approval | |||
Building Code Review | Approved | 11/29/2023 | 11/28/2023 |
Ted Allen
|
|||
Construction Stormwater Review | Approved | 11/29/2023 | 11/28/2023 |
Scott Slamal
|
|||
Construction Site Management Review | Approved | 11/29/2023 | 11/28/2023 |
Scott Slamal
|
|||
Engineering Review | Failed | 10/06/2023 | 10/12/2023 |
Emrick Soltis, P.E., CFM
|
|||
Miscellaneous
Outstanding
10/12/2023
See outstanding conditions approved with PL20230056. Conditions are required to be satisfied prior to Engineering signoff.
|
|||
GIS Land Development Review | Approved | 10/06/2023 | 10/09/2023 |
Colten Yoast
|
|||
Is this for the east, west or both buildings? Address needs added to the permit. | |||
Utilities Review - Mt. Werner | Failed | 10/06/2023 | 10/06/2023 |
Beau Cahill
|
|||
External Agencies Review | Approved | 10/06/2023 | 10/06/2023 |
Malea Michael-Ferrier
|
|||
Electrical Review | Approved | 10/06/2023 | 10/06/2023 |
Tom Cook
|
|||
final approval subject to field inspection | |||
Building Code Review | Failed | 10/06/2023 | 10/05/2023 |
Ted Allen
|
|||
Miscellaneous
Outstanding
10/05/2023
Details of accessible routes to include location of sign with International symbol of accessibility and “van accessible” parking as applicable, curb ramps installed outside level access aisle, and all sidewalks bordering the hotel shall be referenced on Sheet C11. Slopes away from and sidewalks out of the building entrances require slopes not less than one unit vertical in 20 units horizontal (5-percent slope). Other accessible routes with similar slopes less than one unit vertical in 20 units horizontal (5-percent slope) do not require ramps and the slope measured perpendicular to the direction of travel of a route shall not be steeper than one unit vertical in 48 units horizontal (2-percent slope). Please show accessible routes with slopes and elevations on the plans.
|
|||
Miscellaneous
Outstanding
10/05/2023
For those accessible sidewalks and pavement areas that appear heated on Sheet C11, provide location and details of snowmelt boiler with size, efficiency and controls per IECC C403.12.2 as applicable.
|
|||
Miscellaneous
Outstanding
10/05/2023
The Porte Cochere along with all structural steel used in a Type VA building requires intumescent coating. Provide notes on the plans such that this is not missed, provide manufacturer’s specifications for application of primer, with tables indicating average applied thickness of coating(s) to be applied in accordance with instructions and coating thickness based on the size of steel structure elements. If secondary casing is applied to the surface of steel elements, it should not prevent the expansion of intumescent coating during fire. Special inspection shall include all three items above and submit final report prior to scheduling final inspection.
|
|||
Miscellaneous
Outstanding
10/05/2023
The mechanical canopies shown with on Sheet S1.1 are required to be designed with timbers of dimensions in accordance with IBC Table 2304.11 (requires C1 columns to be revised to minimum column dimensions utilizing timber, otherwise submit code modification for review under IBC Section 104.10.
|
|||
Miscellaneous
Outstanding
10/05/2023
All rated gypsum assembly details on Sheet A0.2 utilizing proprietary Type(s) of Gypsum Board and may not be modified. For example Wall F, F1 utilizing GA FILE NO. WP 7053 FOR 2 HR RATING utilizes PROPRIETARY GYPSUM BOARD United States Gypsum Company - 3/4" SHEETROCK® Brand ULTRACODE®Core Gypsum Panels - 1" SHEETROCK® Brand Gypsum
Liner Panels. A substitution for using generic other gypsum board requires justification as many of the UL listed assemblies are “Proprietary,” meaning that very specific brand name products must be used in the construction of the assemblies. Use of these assemblies with substitute materials raises the question of whether the alternates exhibitor exceed the properties of the listed product. Substitutions shall be submitted the Architect and approved prior to submittal to the Building Official for review and approval.
|
|||
Miscellaneous
Outstanding
10/05/2023
All rated gypsum assembly details on Sheet A0.2 utilizing proprietary Type(s) of Gypsum Board and may not be modified. For example Wall F, F1 utilizing GA FILE NO. WP 7053 FOR 2 HR RATING utilizes PROPRIETARY GYPSUM BOARD United States Gypsum Company - 3/4" SHEETROCK® Brand ULTRACODE®Core Gypsum Panels - 1" SHEETROCK® Brand Gypsum
Liner Panels. A substitution for using generic other gypsum board requires justification as many of the UL listed assemblies are “Proprietary,” meaning that very specific brand name products must be used in the construction of the assemblies. Use of these assemblies with substitute materials raises the question of whether the alternates exhibitor exceed the properties of the listed product. Substitutions shall be submitted the Architect and approved prior to submittal to the Building Official for review and approval.
|
|||
Miscellaneous
Outstanding
10/05/2023
Mineral fiber or glass fiber shall not be arbitrarily added to floor-ceiling or roof-ceiling systems to increase R-values. This practice has been shown to reduce the fire-resistance rating. The addition of up to 16 3/4 inches of 0.5 pcf glass fiber insulation (R-40), either batt or loose-fill, to any 1- or 2-hour fire resistance rated floor-ceiling or roof-ceiling system having a cavity deep enough to accept the insulation is permitted provided that one additional layer of either 1/2 inch or 5/8 inch type X gypsum board is applied to the ceiling. The additional layer of gypsum board shall be applied as described for the face layer of the tested system except that the fastener length shall be increased by not less than the thickness of the additional layer of gypsum board.
|
|||
Miscellaneous
Outstanding
10/05/2023
Where resilient channels are included in systems, the resilient channels are shown by a dashed line to distinguish them from rigid furring channels. Modifications are not recommended for sound control may be reduced. Provide copies of fire-resistive assemblies to include testing of the desired STC rating between dwellings and public areas such as 2, 2A/A0.2 2x Joist Floor/Ceiling.
|
|||
Miscellaneous
Outstanding
10/05/2023
Detail 12/A0.3 Duct Penetration shall be revised to reflect the General Notes on Sheet M2.0 referencing FD/FSD requirements in both floor/roof ceilings and walls.
Fire Extinguisher Cabinets depicted in Section 4/A0.3 requires relocation from 2-HR Rated extensions of Stair Enclosures indicated on Sheet A0.1A as penetrations into enclosures for exit access stairways and ramps, interior exit stairways and ramps, and exit passageways shall be allowed only where permitted by Sections 1023.5 and 1024.6, respectively.
|
|||
Miscellaneous
Outstanding
10/05/2023
While the Architectural and Structural Building Plans include a full structural design of all vertical and lateral loads including a roof structure that meets our local Ground Snow Load values, the Structural Schedules for Roof Truss Profile 1/S0.4 Load Combinations notes the Live Load incorrectly.
|
|||
Miscellaneous
Outstanding
10/05/2023
The roof members also appear to have been designed with a duration factor of 1.15. Tabulated design values shall be multiplied by all appropriate adjustment factors to determine allowable design values. The applicability of adjustment factors in accordance with the method prescribed establishes the allowable load for normal duration, as defined by the American Forest & Paper Association (AF&PA) National Design Specification (NDS) for Wood Construction. For our area use a duration factor of 1.0 (not reduced). Please resubmit structural plans displaying the correct Risk Category with duration factor of 1.0
|
|||
Miscellaneous
Outstanding
10/05/2023
Porte Cochere along with all structural construction of buildings and structures shall result in a system that provides a complete load path capable of transferring all loads from their point of origin through the load-resisting elements to the foundation. Plans, calculations and details shall identify a load path distribution of required lateral load resisting components with R-factor matching method used for moment resisting frame requirements on the approved plans as applicable. Submit complete calculations for Porte Cochere and storage building as the roof joists appear overstressed and include details of empirically designed masonry requirements for exception to special inspection.
|
|||
Miscellaneous
Outstanding
10/05/2023
Submit geotechnical report referenced in General Notes on Sheet S0.1to RCRBD for review or submit design of permanent supports of building as reported in NWCC soils report number 22-12552.
|
|||
Construction Stormwater Review | Failed | 10/06/2023 | 10/03/2023 |
Scott Slamal
|
|||
Miscellaneous
Outstanding
10/03/2023
A complete and compliant SWMP required.
|
|||
Construction Site Management Review | Failed | 10/06/2023 | 10/02/2023 |
Scott Slamal
|
|||
Miscellaneous
Outstanding
10/02/2023
CSMP site plan needs to meet SWMP site plan requirements.
|
|||
Planning Review | Failed | 10/06/2023 | 09/28/2023 |
Toby Stauffer, AICP
|
|||
Miscellaneous
Resolved
12/01/2023
A storage building is shown on the architectural plans that was not included on the approved development plans. Provide material and color information for the storage building, it needs to comply with design and development standards. The building appears to impact landscaping and snow storage and is not shown on civil and landscaping plans. It may impact lighting, drainage, or other approved plans. Review, update, and coordinate all plans and submit substantial conformance application for any differences between the approved development plan and the proposed building permit plans. see document mark ups.
|
|||
Miscellaneous
Resolved
12/01/2023
A storage building or dumpster enclosure for Hotel B is shown on the architectural plans that was not included on the approved development plans. The building needs to comply with design and development standards. The building is not shown on civil and landscaping plans and it may impact landscaping, snow storage, parking, bike parking, lighting, drainage, or other approved plans. Review, update, and coordinate all plans and submit substantial conformance application for any differences between the approved development plan and the proposed building permit plans. See document markups
|
|||
Miscellaneous
Resolved
12/01/2023
Building Height is different from approved development plans. Review, update, and coordinate all plans and submit substantial conformance application for any differences between the approved development plan and the proposed building permit plans.
|
|||
See Document Markups
Resolved
12/01/2023
Storage building not shown on approved plans, see planning comments.
|
|||
See Document Markups
Resolved
12/01/2023
Storage building/dumpster enclosure not shown on approved plans, see planning comments.
|
|||
Fire Code Review | Approved | 10/06/2023 | 09/19/2023 |
Mike Middleton
|
|||
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms | |||
Finance Department Review | Approved | 10/06/2023 | 09/18/2023 |
Sondra Spratta
|
|||
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Water Service Inspection | Pending | |||
Amber Gregory | ||||
Sewer Service Inspection | Pending | |||
Amber Gregory | ||||
Interim Construction Site Management | Pending | |||
Scott Slamal | ||||
Final Planning Department Site Improvement | Pending | |||
Final Construction Site Management | Pending | |||
Scott Slamal | ||||
Building Final Inspection | Pending | |||
Final Engineering Site Inspection | Pending | |||
Emrick Soltis, P.E., CFM | ||||
Foundation Water Proofing | Pending | |||
Footing Inspection | Pending | |||
Foundation/Under Slab Insulation | Pending | |||
Foundation Inspection | Pending | |||
Structural Inspection | Pending | |||
Roofing Inspection | Pending | |||
Framing Inspection | Pending | |||
Insulation Inspection | Pending | |||
Insulation Inspection | Pending | |||
Drywall Inspection | Pending | |||
Lath/Veneer Inspection | Pending | |||
Drywall Inspection | Pending | |||
Footing Inspection | Partial Pass | 4/5/2024 (Afternoon) | 4/5/2024 | 04/05/2024 |
Jeff Yeiser | ||||
Footing Inspection | Partial Pass | 4/9/2024 | 4/9/2024 | 04/09/2024 |
Jeff Yeiser | ||||
Footing Inspection | Stop Work | 4/10/2024 | 4/10/2024 | 04/10/2024 |
Todd Carr | ||||
Footing Inspection | Partial Pass | 4/12/2024 | 4/12/2024 | 04/12/2024 |
Todd Carr | ||||
Footing Inspection | Partial Pass | 4/15/2024 | 04/15/2024 | |
Jeff Yeiser | ||||
Foundation Inspection | Partial Pass | 4/22/2024 | 4/22/2024 | 04/22/2024 |
Jeff Yeiser | ||||
Foundation/Under Slab Insulation | Partial Pass | 5/1/2024 | 5/1/2024 | 05/01/2024 |
Jeff Yeiser | ||||
Foundation Drain Inspection | Passed | 5/8/2024 | 5/8/2024 | 05/08/2024 |
Jeff Yeiser | ||||
Foundation Inspection | Partial Pass | 5/10/2024 | 5/10/2024 | 05/10/2024 |
Jeff Yeiser | ||||
Footing Inspection | Partial Pass | 5/13/2024 | 5/13/2024 | 05/13/2024 |
Jeff Yeiser | ||||
Foundation Inspection | Partial Pass | 5/15/2024 | 5/15/2024 | 05/15/2024 |
Jeff Yeiser | ||||
Footing Inspection | Partial Pass | 6/11/2024 | 6/11/2024 | 06/11/2024 |
Jeff Yeiser | ||||
Foundation/Under Slab Insulation | Partial Pass | 6/18/2024 | 6/18/2024 | 06/18/2024 |
Jeff Yeiser | ||||
Foundation Inspection | Partial Pass | 6/18/2024 | 06/18/2024 | |
Jeff Yeiser | ||||
Foundation Inspection | Not Ready | 7/26/2024 | 7/26/2024 | 07/26/2024 |
Ron Norton | ||||
Wall/Roof Sheeting | Partial Pass | 9/20/2024 | 9/20/2024 | 09/20/2024 |
Ron Norton | ||||
Structural Inspection | Partial Pass | 9/30/2024 | 9/30/2024 | 09/30/2024 |
Jeff Yeiser | ||||
Wall/Roof Sheeting | Passed | 10/15/2024 | 10/15/2024 | 10/15/2024 |
Todd Carr | ||||
Roofing Inspection | Partial Pass | 10/25/2024 | 10/25/2024 | 10/25/2024 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 11/13/2024 | 11/13/2024 | 11/13/2024 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 11/20/2024 | 11/20/2024 | 11/20/2024 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 11/25/2024 | 11/26/2024 | 11/26/2024 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 12/9/2024 | 12/09/2024 | |
Jeff Yeiser | ||||
Insulation Inspection | Partial Pass | 12/9/2024 | 12/9/2024 | 12/09/2024 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 12/13/2024 | 12/13/2024 | 12/13/2024 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 12/13/2024 | 12/13/2024 | 12/13/2024 |
Jeff Yeiser | ||||
Insulation Inspection | Partial Pass | 12/13/2024 | 12/13/2024 | 12/13/2024 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 12/23/2024 | 12/23/2024 | 12/27/2024 |
Jeff Yeiser | ||||
Framing Inspection | Not Ready | 12/27/2024 | 12/27/2024 | 12/27/2024 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 12/27/2024 | 12/27/2024 | |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 1/13/2025 | 1/13/2025 | 01/13/2025 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 1/10/2025 | 1/14/2025 | 01/14/2025 |
Jeff Yeiser | ||||
Insulation Inspection | Partial Pass | 1/14/2025 | 1/14/2025 | 01/14/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Not Ready | 1/14/2025 | 1/14/2025 | 01/14/2025 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 1/16/2025 | 1/16/2025 | 01/16/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 1/31/2025 | 1/31/2025 | 01/31/2025 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 1/31/2025 | 1/31/2025 | 01/31/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 2/4/2025 | 2/4/2025 | 02/04/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 2/6/2025 | 2/6/2025 | 02/06/2025 |
Jeff Yeiser | ||||
Framing Inspection | Failed | 2/6/2025 | 2/6/2025 | 02/06/2025 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 2/11/2025 | 2/11/2025 | 02/11/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 2/20/2025 | 2/20/2025 | 02/20/2025 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 3/4/2025 | 3/4/2025 | 03/04/2025 |
Todd Carr | ||||
Drywall Inspection | Partial Pass | 3/4/2025 | 3/4/2025 | 03/04/2025 |
Todd Carr | ||||
Drywall Inspection | Partial Pass | 3/13/2025 | 3/13/2025 | 03/13/2025 |
Jeff Yeiser | ||||
Insulation Inspection | Partial Pass | 3/13/2025 | 03/14/2025 | |
Jeff Yeiser | ||||
Lath/Veneer Inspection | Partial Pass | 3/14/2025 | 3/14/2025 | 03/14/2025 |
Jeff Yeiser | ||||
Lath/Veneer Inspection | Partial Pass | 03/14/2025 | ||
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 3/17/2025 | 3/17/2025 | 03/17/2025 |
Silas Ebbert | ||||
Drywall Inspection | Partial Pass | 3/17/2025 | 3/17/2025 | 03/17/2025 |
Silas Ebbert | ||||
Drywall Inspection | Partial Pass | 4/1/2025 | 4/1/2025 | 04/01/2025 |
Todd Carr | ||||
Insulation Inspection | Partial Pass | 4/1/2025 | 4/1/2025 | 04/01/2025 |
Todd Carr | ||||
Drywall Inspection | Partial Pass | 4/8/2025 | 4/8/2025 | 04/08/2025 |
Jeff Yeiser | ||||
Lath/Veneer Inspection | Partial Pass | 4/8/2025 | 4/8/2025 | 04/08/2025 |
Jeff Yeiser | ||||
Lath/Veneer Inspection | Partial Pass | 4/11/2025 | 4/11/2025 | 04/11/2025 |
Jeff Yeiser | ||||
Insulation Inspection | Partial Pass | 4/22/2025 | 4/22/2025 | 04/22/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 4/30/2025 | 4/30/2025 | 04/30/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 5/5/2025 | 5/5/2025 | 05/05/2025 |
Jeff Yeiser | ||||
Lath/Veneer Inspection | Partial Pass | 5/12/2025 | 5/12/2025 | 05/12/2025 |
Jeff Yeiser | ||||
Lath/Veneer Inspection | Partial Pass | 5/14/2025 | 5/14/2025 | 05/14/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 5/14/2025 | 5/14/2025 | 05/14/2025 |
Jeff Yeiser |
Condition | Status | Category |
---|---|---|
Use Tax Reconciliation | Open | Prior to Issuance of CO/CC |
Finance
Use Tax Reconciliation
|
||
MF/Com/I Planning CO Review | Open | Prior to Issuance of CO/CC |
Planning Department
At the time of project completion, request certificate of occupancy inspections from the Department of Planning and Community Development to ensure the project has been built in accordance with the approved plans and the Community Development Code. The inspection may include but is not limited to general site planning and grading, landscaping and revegetation, outdoor lighting, parking and parking lot striping, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
|
||
Miscellaneous Conditions | Resolved | Prior to Rough Building Wall Inspections |
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms
|
||
Final Fire Inspection Required | Open | Prior to Issuance of TCO/CO/CC |
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required
|
||
Vested Approval Conditions | Resolved | Prior to Full Building Permit Issuance |
Planning Department
Compliance with PL20230055, and PL20230056 conditions of approval required.
|
||
Vested Approval Conditions | Open | Prior to Issuance of CO/CC |
Planning Department
Compliance with PL20230055, and PL20230056 conditions of approval required.
|
||
Miscellaneous Conditions | Resolved | Prior to Full Building Permit Issuance |
Planning Department
See corrections required before permit issuance.
|
||
Miscellaneous Conditions | Resolved | Prior to Full Building Permit Issuance |
Mount Werner Water & Sanitation
Miscellaneous Conditions
Plant Investment Fees are due to MWW prior to Building Permit Issuance.
|
||
Pre-Construction Mtg Reqd | Open | Within 30 days of Building Permit Issuance |
Engineering
Pre-construction meeting shall be to be scheduled prior to start of construction.
|
||
Miscellaneous Conditions | Resolved | Prior to Footing/Foundation Inspection |
Building Department
NWCC to observe the foundation excavations when they are near completion to identify bearing soils, as well as test the structural backfill materials for compaction. [Ted Allen @ 11/22/2024 2:26 PM]
|
||
Truss Drawings Deferred Submittal | Resolved | Prior to Drywall Inspections Scheduled |
Building Department
Truss drawings shall be submitted, trusses shall be built with FRTW meeting the specification on the approved plans,.reviewed and approved prior to installation and inspections. [Ted Allen @ 07/12/2024 7:26 AM] drawings will be returned for resubmittal if other than Approved is submitted to RCRBD. [Ted Allen @ 11/22/2024 2:27 PM] Resolved/Approved [Ted Allen @ 12/09/2024 1:40 PM]
|
||
PWQ O&M prior to CO/CC | Open | Prior to Issuance of CO/CC |
Engineering
An executed Ownership and Maintenance Agreement for the Permanent Water Quality Treatment Facility shall be recorded prior to Certificate of Occupancy/Completion. The agreement will be processed via a new Permanent Water Quality Treatment Facility Registration License application. For more information on that process, refer to the link provided. https://www.steamboatsprings.net/1336/CityView-FAQ
|
||
Miscellaneous Conditions | Open | Prior to Issuance of CO/CC |
Planning Department
The applicant shall provide a complete “finished construction” FEMA Elevation Certificate in compliance with the “construction drawings” FEMA Elevation Certificate prior to issuance of a Certificate of Occupancy/Completion for any building that was required to obtain a “construction drawings” FEMA Elevation Certificate.
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Planning Department
Prior to TCO or CO, the applicant shall execute and record an updated agreement to add two additional staff units to the original agreement that restricts the occupancy of the Workforce Units to Qualified Residents as defined by the Community Development Code. [Toby Stauffer @ 07/23/2024 12:38 PM]
|
||
Engineering Com/Ind/MF CO Review | Open | Prior to Issuance of TCO/CO/CC |
Engineering
At the time of project completion, a Completion Letter signed and sealed by the Engineer of Record shall be uploaded to the associated building permit in CityView Portal against the applicable condition. Upon receipt of the letter, Engineering will review and perform a Final Site Inspection for the TCO/CO request.
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Mount Werner Water & Sanitation
All water and sewer infrastructure must be installed, observed, and tested per MWW Rules, Regs, Specifications and additional plant investment fee from July 2024 addendum must be paid in full prior to any issuance of occupancy.
|
Reference Number | Status | Type |
---|---|---|
SPREL240229 | Permit(s) Issued | Electrical |
SPRPL240603 | Permit(s) Issued | Plumbing |
SPRPO241044 | Permit(s) Issued | Pool/Hot Tub |
SPRMH241666 | Permit(s) Issued | Mechanical |
SPRMH250510 | Permit(s) Issued | Mechanical |