Permit Application Status
SPRMH241666
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
There are no reviews for this permit application, or you are not authorized to view them.
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Mechanical Rough-in Inspection | Pending | |||
| Mechanical Rough-in Inspection | Not Ready | 12/11/2024 | 12/11/2024 | 12/11/2024 |
| Jeff Yeiser | ||||
| Mechanical Rough-in Inspection | Partial Pass | 1/24/2025 | 1/24/2025 | 01/24/2025 |
| Jeff Yeiser | ||||
| Mechanical Rough-in Inspection | Partial Pass | 3/7/2025 | 3/7/2025 | 03/07/2025 |
| Jeff Yeiser | ||||
| Mechanical Rough-in Inspection | Failed | 3/21/2025 | 3/21/2025 | 03/21/2025 |
| Ron Norton | ||||
| Mechanical Rough-in Inspection | Partial Pass | 3/24/2025 | 3/24/2025 | 03/24/2025 |
| Ron Norton | ||||
| Mechanical Rough-in Inspection | Partial Pass | 3/25/2025 | 3/25/2025 | 03/25/2025 |
| Jeff Yeiser | ||||
| Mechanical Rough-in Inspection | Partial Pass | 4/7/2025 | 4/7/2025 | 04/07/2025 |
| Jeff Yeiser | ||||
| Mechanical Rough-in Inspection | Partial Pass | 4/21/2025 | 4/21/2025 | 04/21/2025 |
| Jeff Yeiser | ||||
| Mechanical Rough-in Inspection | Partial Pass | 5/2/2025 | 5/2/2025 | 05/02/2025 |
| Jeff Yeiser | ||||
| Mechanical Rough-in Inspection | Partial Pass | 6/26/2025 | 6/26/2025 | 06/26/2025 |
| Jeff Yeiser | ||||
| Mechanical Final Inspection | Failed | 7/29/2025 | 7/29/2025 | 07/29/2025 |
| Todd Carr | ||||
|
Corrections:
Building Department Corrections to be Completed
Carried Forward
07/29/2025
1. 2nd Floor out in front of unit 212 roughly, main return air hard duct connection in corridors to termination is not completed to main trunk line yet, need to reinspect but can do so by lifting ceiling tiles.
2. All dryer exhaust lines must be labled on main floor for total lenght of dryer duct to termination on exterior wall. Please label the dryer boxes.
3. Main Floor main return air hard duct connections to terminations in ceiling not completed at panty room, and two locations in main lobby entrance.
4. Commercial Laundry Room Main Floor: install of commerical dryers and connections to exhaust lines, and a bath exhaust fan above sink and eyewash area not installed.
5. Pool area, pool mechanical room and chemical storage room to be re-inspected at next final inspection.
|
||||
| Mechanical Final Inspection | Passed | 10/3/2025 | 10/3/2025 | 10/03/2025 |
| Jeff Yeiser | ||||
|
Corrections:
Building Department Corrections to be Completed
Outstanding
07/29/2025
1. 2nd Floor out in front of unit 212 roughly, main return air hard duct connection in corridors to termination is not completed to main trunk line yet, need to reinspect but can do so by lifting ceiling tiles.
2. All dryer exhaust lines must be labled on main floor for total lenght of dryer duct to termination on exterior wall. Please label the dryer boxes.
3. Main Floor main return air hard duct connections to terminations in ceiling not completed at panty room, and two locations in main lobby entrance.
4. Commercial Laundry Room Main Floor: install of commerical dryers and connections to exhaust lines, and a bath exhaust fan above sink and eyewash area not installed.
5. Pool area, pool mechanical room and chemical storage room to be re-inspected at next final inspection.
|
||||
There are no conditions for this permit application, or you are not authorized to view them.
| Reference Number | Status | Type |
|---|---|---|
| SPRNR231281 | Permit(s) Issued | New Commercial Building |
| SPREL240229 | Permit(s) Issued | Electrical |
| SPRPL240603 | Permit(s) Issued | Plumbing |
| SPRPO241044 | Permit(s) Issued | Pool/Hot Tub |
| SPRMH250510 | Permit(s) Issued | Mechanical |
| SPRMH251082 | Permit(s) Issued | Mechanical |
| Date Uploaded | File Type | Name |
|---|---|---|
| Report | ||
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Letter | PERMIT - DETAILED.PDF |