Planning Application Status
PL20220154
| Title | Location | Date | Time |
|---|---|---|---|
| Planning Commission, 2023-11-09, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 11/09/2023 | 5:00 PM |
|
Pending
Approved with Conditions
|
|||
There are no inspections for this planning application, or you are not authorized to view them.
| Condition | Status | Category |
|---|---|---|
| Site Posting Affidavit | Resolved | Prior to Final Review |
|
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
| Miscellaneous Condition | Open | Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat |
|
Public Works - Water and Sewer
Sanitary sewer and water design shown on sheets PP16 and PP18 do not meet City Standards. The preliminary plat was not reviewed for compliance with design standards.
|
||
| Detention/Infiltration Pond State Registration | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
|
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, documentation of state registration of detention or infilatration facility shall be submitted by the applicant.
|
||
| Executed Easements Prior to BP/GF | Open | Prior to Issuance of Construction Permit |
|
Engineering
1. The owner shall provide the following recorded easements prior to issuance of a construction permit (Grade and Fill, Building):
a. Drainage easements to accommodate offsite drainage through the project site.
b. Drainage and access easement from Public Street related to the storm water quality treatment facility.
c. Public access easements for public sidewalks which are not completely within the right-of-way.
|
||
| Civils Required at BP | Resolved | Prior to Issuance of Construction Permit |
|
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/Grading Permit application for review and approval prior to the start of any construction.
|
||
| PWQ O&M prior to final acceptance | Open | Prior to Final Acceptance of Subdivision Infrastructure |
|
Engineering
Prior to Final Acceptance of subdivision infrastructure, an Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded by the applicant.
|
||
| Record Drawings/CAD Files | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
|
Engineering
Record Drawings/CAD Files shall be submitted by the applicant prior to Permanent Stormwater Quality Treatment Facility Inspection.
|
||
| Infrastructure Before Plat | Open | Prior to Recording of Final Plat |
|
Engineering
The infrastructure shown on the Preliminary Plat shall be constructed and approved and/or accepted or surety provided prior to recording of a Final Plat.
|
||
| Completion Letter (PSWQTF) | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
|
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted by the applicant.
|
||
| Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
|
Engineering
1. The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first:
a. Access drive
b. Drainage improvements
c. Permanent storm water quality treatment facilities
d. Sidewalk improvements
|
||
| Improvement Summary Letter | Open | Prior to Engineering Final Acceptance Inspection |
|
Engineering
Prior to Engineering Final Acceptance Inspection, an Improvement Summary letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
|
||
| Testing Summary Letter (Preliminary) | Open | Prior to Engineering Preliminary Acceptance Inspection |
|
Engineering
Prior to Preliminary Acceptance inspection, a Testing Summary letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted by the applicant.
|
||
| Testing Summary Letter (Final) | Open | Prior to Engineering Final Acceptance Inspection |
|
Engineering
Prior to Engineering Final Acceptance inspection, a Testing Summary letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted by the applicant.
|
||
| Miscellaneous Condition | Open | Prior to Issuance of Construction Permit |
|
Engineering
Prior to approval of a Building Permit or Grade and Fill Permit for any development resulting in land disturbance activity of five acres or greater, the applicant shall enter into an Improvements Agreement with the City requiring the applicant to furnish the City with collateral in an amount equal to $5,000 per acre of proposed disturbance plus costs for maintenance of sediment and erosion control best practices necessary for implementation of the revegetation and stormwater management plan. A cost estimate for maintenance of sediment and erosion control shall be provided by a professional engineer.
|
||
| Miscellaneous Condition | Open | |
|
Planning Department
Postal facilities shall be provided with any subsequent Development Plan for lot 1.
|
||
| Miscellaneous Condition | Open | |
|
Planning Department
Prior to approval of Civil Construction Drawings and Final Plat, the applicant shall secure the waterline easement necessary for water main connection as depicted on sheet PP16.
|
||
| Miscellaneous Condition | Open | |
|
Planning Department
On the Final Plat, the setbacks depicted on sheet PP3 shall be labeled "building envelope".
|
||
| Miscellaneous Condition | Open | |
|
Planning Department
Plat note 5 on sheet PP2 shall be amended to read as follows. Public Easement for turnaround may be vacated by the property owner (with application through the City of Steamboat Springs Planning Department) once a street through Outlot 1 is developed, constructed, and preliminary accepted by the City, connecting to the street depicted in this application.
|
||
| Mailing Affidavit | Resolved | |
|
Planning Department
10/30/2023
Mailing Affidavit: Submit a signed affidavit no later than eight days prior to the required public hearing or final decision date confirming the required mailed notice has been completed in accordance with Section 703.C.2.
|
||
| Miscellaneous Condition | Open | |
|
Planning Department
The proposed Open Space 1 lot as identified on the proposed plat shall be changed to an open space easement area, to satisfy CDC Section 602.L, on the required Final Plat.
|
||
| Miscellaneous Condition | Open | |
|
Planning Department
The approval of this Preliminary Plat is contingent on the approval of the associated Zone Map Amendment, PL20230083.
|
||