City of Steamboat Springs Web Portal

Permit Application Status

TB-21-755


In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

TB-21-755
New Single Family Dwelling
Closed
SUNSHINE STEAMBOAT, LLC
New
R-3 - Residential, one- and two-family
Unit A of new duplex Unit A: B-21-755 Unit B: B-21-834 Detached Garage: B-21-835
06/26/2021
09/28/2021
09/28/2024
12/22/2023

Locations

Property
313400003

Address
1859 RIVER QUEEN LN

Permits

Permit Number: TB-21-755

Building
Finaled

Reviews

Review Type Outcome Est. Completion Date Completed
COO Review - Planning Approved 01/11/2024 01/04/2024
COO Review - Building Code Approved 01/02/2024 12/22/2023
COO Review - Building Code TCO Approved 10/25/2023 10/19/2023
COO Review - Engineering (SF/DU) TCO Approved 10/13/2023 10/17/2023
COO Review - Building Code Failed 10/13/2023 10/13/2023
COO Review - Utilities - Mt. Werner Approved 10/13/2023 10/13/2023
COO Review - GIS Land Development Approved 10/13/2023 10/13/2023
COO Review - Planning Failed 10/13/2023 10/12/2023
COO Review - Finance Department TCO Approved 10/13/2023 10/09/2023
Building Code Review Approved 05/01/2023 04/25/2023
Building Code Review Approved 11/15/2022 11/10/2022
Utilities Review - Mt. Werner Approved 09/21/2021 09/23/2021
Utilities Review - Mt. Werner Approved 08/31/2021 09/23/2021
Engineering Review Approved 09/15/2021 09/15/2021
Building Code Review Approved 08/31/2021 08/24/2021
Planning Review Approved w/ Conditions 08/04/2021
External Agencies Review Approved w/ Conditions 08/04/2021
Legacy Permitting Review Complete 07/16/2021
Fire Code Review Approved 07/16/2021
External Agencies Review Approved 07/14/2021
GIS Land Development Review Approved 07/13/2021
Finance Department Review Approved 07/13/2021

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection Passed 1/11/2022 1/12/2022 01/13/2022
Jeff Yeiser
Foundation Inspection Partial Pass 2/4/2022 2/7/2022 02/07/2022
Ron Norton
Foundation Inspection Partial Pass 2/10/2022 2/11/2022 02/11/2022
Ron Norton
Foundation Inspection Partial Pass 3/15/2022 (Afternoon) 3/16/2022 03/16/2022
Ron Norton
Foundation Inspection Partial Pass 3/25/2022 (Afternoon) 3/28/2022 03/28/2022
Ron Norton
Foundation Inspection Not Ready 4/1/2022 4/1/2022 04/01/2022
Ron Norton
Rough Site Inspection Failed 7/15/2022 07/18/2022
Scott Slamal
Corrections:


Tracking
Carried Forward
07/18/2022
Vehicle tracking controls were not adequate. Tracking pad must be installed per the approved CSMP.

Perimeter Control Measures
Carried Forward
07/18/2022
Straw wattles/silt fence not installed per approved CSMP site map. Additional straw wattles of rock socks check dams needed on west boundary.

Framing Inspection Partial Pass 10/14/2022 10/14/2022 10/14/2022
Todd Carr
Insulation Inspection Partial Pass 12/19/2022 12/19/2022 12/19/2022
Ron Norton
Framing Inspection Partial Pass 4/12/2023 4/12/2023 04/12/2023
Jeff Yeiser
Framing Inspection Partial Pass 4/13/2023 4/13/2023 04/13/2023
Todd Carr
Insulation Inspection Passed 4/26/2023 4/26/2023 04/26/2023
Ron Norton
Building Final Inspection Failed 10/6/2023 10/6/2023 10/06/2023
Todd Carr
Corrections:


Building Department Corrections to be Completed
Carried Forward
10/06/2023
Building Department Corrections to be Completed 1. The 4th stair tread up from basement does not meet 6'8" head clearance, it's only 6'3". 2. The handrail does not meet the graspable sections for type II handrial, see inspection report from 1857 address for help on this section. Handrail on basement and upstairs both need to be addressed. 3. Must install AC units for both 1857 and 1859. 4. Must complete sauna work. 5. Must pass final electrical for both 1857 and 1859 and garage. 6. Complete in floor heat system under the mechanical permit. 7. Call for plumbing final and pass inspections. 8. Raise smoke detectors upstairs to be within 1 foot of highest point of ceiling. 9. Hallway just inside front door leading to kitchen is only 34", hallways must be 36" wide. 10. Finish all exterior siding work.

Building Final Inspection Partial Pass 10/18/2023 10/18/2023 10/18/2023
Ron Norton
Corrections:


Building Department Corrections to be Completed
Carried Forward
10/18/2023
Building Department Corrections to be Completed 1. The 4th stair tread up from basement does not meet 6'8" head clearance, it's only 6'3". 2. The handrail does not meet the graspable sections for type II handrial, see inspection report from 1857 address for help on this section. Handrail on basement and upstairs both need to be addressed. 3. Must install AC units for both 1857 and 1859. 4. Must complete sauna work. 5. Must pass final electrical for both 1857 and 1859 and garage. 6. Complete in floor heat system under the mechanical permit. 7. Call for plumbing final and pass inspections. 8. Raise smoke detectors upstairs to be within 1 foot of highest point of ceiling. 9. Hallway just inside front door leading to kitchen is only 34", hallways must be 36" wide. 10. Finish all exterior siding work.

Final Site Inspection Passed 10/13/2023 10/30/2023
Greg Gunn
Corrections:


Miscellaneous
Carried Forward
10/17/2023
10/16/23: TCO approved. Prior to CO: Site grading complete in compliance with approved plan. Roadway shoulder restored with road base. Roadside ditch restored and revegetated. Disturbed areas revegetated - sod, seed and straw or landscaping complete.

Building Final Inspection Passed 12/22/2023 12/22/2023
Heidi Spengler
Corrections:


Building Department Corrections to be Completed
Outstanding
10/18/2023
Building Department Corrections to be Completed 1. The 4th stair tread up from basement does not meet 6'8" head clearance, it's only 6'3". 2. The handrail does not meet the graspable sections for type II handrial, see inspection report from 1857 address for help on this section. Handrail on basement and upstairs both need to be addressed. 3. Must install AC units for both 1857 and 1859. 4. Must complete sauna work. 5. Must pass final electrical for both 1857 and 1859 and garage. 6. Complete in floor heat system under the mechanical permit. 7. Call for plumbing final and pass inspections. 8. Raise smoke detectors upstairs to be within 1 foot of highest point of ceiling. 9. Hallway just inside front door leading to kitchen is only 34", hallways must be 36" wide. 10. Finish all exterior siding work.

Conditions

Condition Status Category
Blower Door Test Results Resolved Prior to Certificate of Occupancy/Completion
Building Department
Blower Door Test Results
Use Tax Reconciliation Resolved Prior to Issuance of CO/CC
Finance
SEE NOTES IN 226310 AND IN City View "COMMENTS" regarding use tax recon [Amy Camilletti @ 12/19/2022 11:26 AM]
FLC Submittal Resolved Prior to Rough Site Inspection
Planning Department
Foundation location certificate shall be provided
SFR/Dup Planning CO Review Resolved Prior to Issuance of TCO/CO/CC
Planning Department
At the time of project completion, request certificate of occupancy inspections from the Department of Planning and Community Development to ensure the project has been built in accordance with the approved plans and the Community Development Code. The inspection may include but is not limited to general site planning and grading, outdoor lighting, parking, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
Miscellaneous Conditions Resolved Prior to Issuance of CO/CC
Engineering
10/16/23: TCO approved. Prior to CO: Site grading complete in compliance with approved plan. Roadway shoulder restored with road base. Roadside ditch restored and revegetated. Disturbed areas revegetated - sod, seed and straw or landscaping complete.
Building Department Conditions to be Completed Resolved Prior to Issuance of CO/CC
Building Department
Building Department Conditions to be Completed 2. Finals for fire places 3. Main circuit breaker will need to be added to interior panel. Placard at both services supplying duplex describing location of other main disconnect required for CO.

Related Permit & Planning Applications

Reference Number Status Type
SPREL220316 Closed Electrical
SPRPL221086 Closed Plumbing
SPRMH221087 Closed Mechanical
SPRMH221671 Closed Mechanical
SPRMH230363 Closed Mechanical

Documents & Images

Date Uploaded File Type Name
Legacy Permit Document 1637604789069485019_PERMIT APPLICATION TB-21-755.MSG
Legacy Permit Document 1637613395782839822_RE PERMIT APPLICATION TB-21-755.MSG
Legacy Permit Document 1637614110090900891_CHK LIST 1 CITY.PDF
Legacy Permit Document 1637614110096526164_CHK LIST 2.PDF
Legacy Permit Document 1637614110099025609_CSMP.PDF
Plans 1859 RIVER QUEEN LANE ILC.PDF
Plans 1998-001 LOT 3 EAGLES VISTA SUB ILC - FLC.PDF
Report 2015 IECC AIR-LEAKAGE TEST - 1857 & 1859 RIVER QUEEN LANE.PDF
Form 21PIF-41 SUNSHINE STMBT, 1859 RIVER QUEEN, DUPLEX.PDF
Legacy Permit Document 3B2B7980-AC5D-4AE6-BADB-8BA6F255595C_1998-001 LOT 3 EV CIVIL PLANS 8-2-21.PDF
Legacy Permit Document 6631C3DC-EE8F-425F-9003-0D9722998DDE_1998-001 LOT 3 EV CIVIL PLANS 8-10-21.PDF
Legacy Permit Document A4FF7A8C-1E1D-4820-B3B8-2B453F6DBA19_SOILS REPORT.PDF
Legacy Permit Document A725C16A-1FAA-452E-8508-23EB45F48C77_STEAMBOAT SPRINGS ALPINE HOUSE_ISSUED FOR BUILDING PERMIT_S&S_23 JUNE 2021.PDF
Legacy Permit Document A90A7C8B-6540-4A8D-868A-C7FA7F3C7E45_STEAMBOAT_REVISED PERMIT SHEETS_27 JULY 2021.PDF
Legacy Permit Document AD5D2C1D-8BFC-4200-B3A6-628EC6DCE6E4_1998-001 CIVIL PLANS 7-21-21.PDF
Plans B-21-755, 834 & 835 RECORD SET.PDF
Legacy Permit Document B610F545-BC82-4A8D-9A2A-1504577E3E4D_1998-001 LOT 3 EV FINAL DRAINAGE LETTER.PDF
Legacy Permit Document C5EAF328-4C1B-4CC7-BA8C-8D2FCE1BB552_RIVER QUEEN CSMP.PDF
Other CERTIFICATE OF OCCUPANCY.PDF
Letter CERTIFICATE OF TEMPORARY OCCUPANCY.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Letter PERMIT - DETAILED.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
Plans STEAMBOAT_ASSEMBLY REVISIONS AND WOOD STOVE_02 NOV 2022 (STAMPED).PDF
Plans STEAMBOAT_COMPILED SET_APRIL_23 (STAMPED).PDF