Summary

SPRMU220953
New Multi-Unit Residential
Permit(s) Issued
VILLAGE DRIVE TOWNHOMES LLC
New
This application reflects the North building which includes five units each 3 story with rooftop terraces. Each unit includes 3 bedrooms, 3.5 baths. Project will be stick built with 2hr rated walls between each unit meeting the townhome codes. Exterior finishes include a mixture of stone, wood siding, stucco features and will be used reflecting the design guidelines as described for coloration. The driveway will include a snow melt system, new sidewalk along Walton Creek to connect existing path. Project will be landscaped to design submitted. 2936, 2940, 2944, 2948, 2956 Village DR
07/13/2022
10/23/2023

Locations

Address
2956 VILLAGE DR

Address
2940 VILLAGE DR

Address
2944 VILLAGE DR

Address
2948 VILLAGE DR

Property
936273003

Address
2936 VILLAGE DR

Permits

Permit Number: SPRMU220953-BD1

Building
Issued

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Failed 04/12/2024 04/11/2024
Building Code Review Approved 04/11/2024 04/09/2024
GIS Land Development Review Approved 12/06/2022 12/05/2022
Building Code Review Approved 12/06/2022 12/05/2022
Engineering Review Approved 12/06/2022 12/05/2022
Planning Review Approved 12/06/2022 12/02/2022
Utilities Review - Mt. Werner Approved 12/06/2022 12/02/2022
GIS Land Development Review Failed 08/25/2022 08/25/2022
External Agencies Review Approved 08/25/2022 08/25/2022
Fire Code Review Approved 08/25/2022 08/24/2022
Engineering Review Failed 08/25/2022 08/24/2022
Construction Site Management Review Approved 08/25/2022 08/23/2022
Electrical Review Approved 08/25/2022 08/22/2022
Building Code Review Failed 08/25/2022 08/18/2022
Planning Review Failed 08/25/2022 08/17/2022
Finance Department Review Approved 08/25/2022 08/16/2022
Utilities Review - Mt. Werner Failed 08/25/2022 08/11/2022

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Water Service Inspection Pending
Amber Gregory
Sewer Service Inspection Pending
Amber Gregory
Interim Construction Site Management Pending
Scott Slamal
Final Planning Department Site Improvement Pending
Final Construction Site Management Pending
Scott Slamal
Building Final Inspection Pending
Structural Inspection Pending
Radon Piping Pending
Wall/Roof Sheeting Pending
Foundation Drain Inspection Pending
Foundation Inspection Pending
Shower Pan Pending
Roofing Inspection Pending
Framing Inspection Pending
Drywall Inspection Pending 4/30/2025 4/30/2025
Foundation Drain Inspection Partial Pass 12/8/2023 12/8/2023 12/08/2023
Ron Norton
Foundation Water Proofing Passed 12/8/2023 12/8/2023 12/08/2023
Ron Norton
Footing Inspection Passed 1/10/2024 01/10/2024
Jeff Yeiser
Foundation Inspection Partial Pass 1/10/2024 01/10/2024
Jeff Yeiser
Shower Pan Not Ready 3/12/2024 3/13/2024 03/13/2024
Jeff Yeiser
Foundation/Under Slab Insulation Passed 5/21/2024 5/21/2024 05/21/2024
Jeff Yeiser
Roofing Inspection Partial Pass 10/16/2024 10/16/2024 10/16/2024
Ron Norton
Framing Inspection Partial Pass 11/22/2024 11/22/2024 11/22/2024
Ron Norton
Framing Inspection Not Ready 3/6/2025 3/6/2025 03/06/2025
Silas Ebbert
Framing Inspection Partial Pass 3/11/2025 3/11/2025 03/11/2025
Jeff Yeiser
Insulation Inspection Partial Pass 4/9/2025 4/9/2025 04/10/2025
Ron Norton
Drywall Inspection Failed 4/15/2025 4/15/2025 04/15/2025
Ron Norton
Insulation Inspection Passed 4/16/2025 4/16/2025 04/16/2025
Jeff Yeiser
Drywall Inspection Partial Pass 4/17/2025 4/17/2025 04/17/2025
Ron Norton
Lath/Veneer Inspection Passed 4/25/2025 4/28/2025 04/28/2025
Ron Norton

Conditions

Condition Status Category
Use Tax Reconciliation Open Prior to Issuance of CO/CC
Finance
Use Tax Reconciliation
Vested Approval Conditions Resolved Prior to Full Building Permit Issuance
Planning Department
Compliance with PL20220086 conditions of approval required.
Vested Approval Conditions Open Prior to Issuance of TCO/CO/CC
Planning Department
Compliance with PL20220086 conditions of approval required.
MF/Com/I Planning CO Review Open Prior to Issuance of TCO/CO/CC
Planning Department
At the time of project completion, request certificate of occupancy inspections from the Department of Planning and Community Development to ensure the project has been built in accordance with the approved plans and the Community Development Code. The inspection may include but is not limited to general site planning and grading, landscaping and revegetation, outdoor lighting, parking and parking lot striping, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
Special Inspections Deffered Submittal Open Prior to Final Building Inspection
Building Department
Special Inspection Reports shall be submitted immediately upon conclusion of the special inspections regardless if it passed or failed and prior to any work being done beyond this point if it failed. See Structural Drawings for special inspections required by EOR.
Truss Drawings Deferred Submittal Open Prior to Issuance of TCO/CO/CC
Building Department
Truss drawings shall be submitted, reviewed and approved prior to installation and inspections.
Blower Door Test Results Open Prior to Certificate of Occupancy/Completion
Building Department
Blower Door Test Results
Completion Letter Open Prior to Issuance of TCO/CO/CC
Engineering
Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection
Engineering Com/Ind/MF CO Review Open Prior to Issuance of TCO/CO/CC
Engineering
At the time of project completion, submit a Improvement Summary Letter or Completion Letter signed and sealed by the Engineer of Record to the associated Development Plan in CityView Portal against the applicable condition. Upon receipt of the letter, Engineering will review and perform a Final Site Inspection for the TCO/CO request.
Miscellaneous Conditions Resolved Prior to Rough Building Wall Inspections
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms
Final Fire Inspection Required Open Prior to Issuance of TCO/CO/CC
Fire Prevention
Final alarm inspections must pass before TCO/CO sign-off.
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Building Department Conditions to be Completed: Each townhome must be provided with a continuous running bath exhaust fan at 50 cfm minimum to meet exception for not providing whole house ventilation, this cannot have a switch but rather constantly running per Architects response, a timer could be added but would need an addendum.
Pre-Construction Mtg Reqd Resolved Within 30 days of Building Permit Issuance
Engineering
Pre-construction meeting shall be to be scheduled prior to start of construction.
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Boulder Walls out front need to be measured to ensure they are 3'11'' per structural plans.

Related Permit & Planning Applications

Reference Number Status Type
SPRPL240132 Permit(s) Issued Plumbing
SPRMH240133 Permit(s) Issued Mechanical
SPREL240297 Permit(s) Issued Electrical
SPRMH241646 Permit(s) Issued Mechanical
SPRMH250212 Permit(s) Issued Mechanical

Documents & Images

Date Uploaded File Type Name
Report
Report
2022 09 12 VILLAGE DR TH (RECEIVED)0 (STAMPED).PDF
21276 - VILLAGE DR - E - PERMIT REVISION SET - STAMPED (RECEIVED) (STAMPED).PDF
21276 - VILLAGE DR - E3-1 - REVISED (RECEIVED) (STAMPED).PDF
21276 - VILLAGE DR - M&P - PERMIT REVISION SET STAMPED (RECEIVED) (STAMPED).PDF
Letter INCOMPLETE APPLICATION NOTICE.PDF
Letter INCOMPLETE APPLICATION NOTICE.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Permit PERMIT - DETAILED.PDF
Receipt RECEIPT.PDF
SITE PLAN FROM 2022 09 12 VILLAGE DR TH (RECEIVED) (1) (STAMPED).PDF
VILLAGEDRIVETOWNHOME_PERMIT_REVISED_9_7_22_AES (RECEIVED) (STAMPED).PDF
07/13/2022 Form 5 units Complete City of Steamboat Building-Permit-Site-Plan-Checklist-1
07/14/2022 Form 5 units complete City of Steamboat Building-Permit-Site-Plan-Checklist-2
07/15/2022 Form Complete-Fire Flow Requirements and Availability Worksheet
08/05/2022 Receipt Receipt for transaction: 2022-001138
08/26/2022 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
08/26/2022 Plans Landscape Master Plan Village Drive Townhomes (Received)
08/26/2022 Study Walton Creek 19-11700 Soils Report (Received)
08/26/2022 Plans Village Drive Townhomes CD Manual V1 (Received)
08/26/2022 Plans Village Drive Townhomes CD Manual V2 (Received)
08/26/2022 Plans 21276 Village Drive Heat and Cool Loads (Received)
08/26/2022 Plans CSMP PHASE 1- North Building (Received)
09/26/2022 Plans Snowmelt for Road BL-3
12/07/2022 2022 09 07 Village Dr TH RCRBD response (1)
12/07/2022 Civil (Received)(Stamped)
12/14/2022 Email Permit application expiration notice SPRMU220953
01/29/2025 Letter 4-13-24 Corrections Email Permits SPRMU220954 and SPRMU220953
04/28/2025 Photograph Retaining Wall 4-24-2025
04/28/2025 Photograph Sidewalk
04/28/2025 Photograph Retaining Wall2 4-24-2025
04/28/2025 Photograph Retaining Wall3 4-24-2025