Permit Application Status
SPRMU220953
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Planning Review | Failed | 04/12/2024 | 04/11/2024 |
Toby Stauffer, AICP
|
|||
Miscellaneous
Outstanding
04/11/2024
Provide color and material information about CMU walls and pillars, provide color elevations to compare to approved development plan to determine if changes are in substantial conformance.
|
|||
4.3.24 ADDENDUM 1: We added you due to exterior changes per the narrative, thanks. Note from Todd Carr reviewing for building, Darby I noticed they are showing boulder walls on the structural addedum out in front of this building. see email i shot applicant below. Hi Everyone, Say, when you change the site plan and now are adding a bunch of boulder walls that are showing up on the structural sheets you submitted with this addendum, you have to now update your site plan or Civil Plans to match the structural sheets. Also you did not mention these extensive boulder walls in the narrative you provided us above. At this point it’s under review already, I have now added all reviewers instead of just adding the Building Department so City Planning, Engineering, and even Mt Werner to review, as these Boulder walls will cause you a lot of issues at the end of the project if these folks are not made aware now your adding them. Always best to make them aware even though the wall is exempt from a building permit, as these other Departments review all walls regardless of the height. They would deny your TCO at the end if we don’t make them aware now. Thanks, in the future on all residential and commercial projects that are adding any type of boulder wall at all regardless of height, will need a site plan update and be placed on the narrative. Have a good day, Todd Carr | |||
Building Code Review | Approved | 04/11/2024 | 04/09/2024 |
Todd Carr
|
|||
4.3.24 ADDENDUM 1: Addendum was reviewed and approved for architectural and structural plans. | |||
GIS Land Development Review | Approved | 12/06/2022 | 12/05/2022 |
Colten Yoast
|
|||
Building Code Review | Approved | 12/06/2022 | 12/05/2022 |
Todd Carr
|
|||
Permit was reviewed and approved under SPRMU220954 and I have added the same conditions to this permit as SPRMU220954 | |||
Engineering Review | Approved | 12/06/2022 | 12/05/2022 |
Emrick Soltis, P.E., CFM
|
|||
Miscellaneous
Resolved
12/05/2022
See SPRMU220954 for Engineering corrections.
|
|||
Planning Review | Approved | 12/06/2022 | 12/02/2022 |
Toby Stauffer, AICP
|
|||
Miscellaneous
Outstanding
12/02/2022
Plans are in conformance with approved DP, PL20220086. Failed due to completion of conditions prior to BP issuance.
|
|||
Utilities Review - Mt. Werner | Approved | 12/06/2022 | 12/02/2022 |
Frank Alfone
|
|||
Miscellaneous
Resolved
12/02/2022
1. PIF Water and Sewer fees need paid to gain MWW sign off approval. Emailed fees to SAA on this date.
2, Civil Utility Plans are not approved as the design layout of the water and sewer plans have changed at the direction of the contractors/owners. All revised civil plans must be downloaded for final approval. To save time on the applicants part, MWW recommends having the Civil Engineer submit hard copies for office review and redlines prior to downloading.
|
|||
GIS Land Development Review | Failed | 08/25/2022 | 08/25/2022 |
Colten Yoast
|
|||
Sub unit addressing required. | |||
External Agencies Review | Approved | 08/25/2022 | 08/25/2022 |
Malea Michael-Ferrier
|
|||
YVEA - inspections@yvea.com Meter to be located as described by YVEA. They shall not be enclosed, covered or concealed. Violation shall result in termination of service. This approval addresses only the meter and service location. | |||
Fire Code Review | Approved | 08/25/2022 | 08/24/2022 |
Mike Middleton
|
|||
Conditionally Approved – pending deferred submittal of alarm plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net * Sprinkler and alarm are not required 9-15-2022 MwM | |||
Engineering Review | Failed | 08/25/2022 | 08/24/2022 |
Emrick Soltis, P.E., CFM
|
|||
Miscellaneous
Carried Forward
12/02/2022
See SPRMU220954 for Engineering corrections.
|
|||
Construction Site Management Review | Approved | 08/25/2022 | 08/23/2022 |
Scott Slamal
|
|||
Electrical Review | Approved | 08/25/2022 | 08/22/2022 |
Tom Cook
|
|||
final approval subject to field inspection | |||
Building Code Review | Failed | 08/25/2022 | 08/18/2022 |
Todd Carr
|
|||
See all comments under SPRMU220954 for corrections and conditions. | |||
Planning Review | Failed | 08/25/2022 | 08/17/2022 |
Toby Stauffer, AICP
|
|||
Miscellaneous
Carried Forward
12/02/2022
Plans are in conformance with approved DP, PL20220086. Failed due to completion of conditions prior to BP issuance.
|
|||
Plans are in conformance with approved DP, PL20220086. Failed due to completion of conditions prior to BP issuance. | |||
Finance Department Review | Approved | 08/25/2022 | 08/16/2022 |
Sondra Spratta
|
|||
Adjusted permit fee to rate for 5-plex | |||
Utilities Review - Mt. Werner | Failed | 08/25/2022 | 08/11/2022 |
Richard Buccino
|
|||
Miscellaneous
Carried Forward
12/02/2022
1. PIF Water and Sewer fees need paid to gain MWW sign off approval. Emailed fees to SAA on this date.
2, Civil Utility Plans are not approved as the design layout of the water and sewer plans have changed at the direction of the contractors/owners. All revised civil plans must be downloaded for final approval. To save time on the applicants part, MWW recommends having the Civil Engineer submit hard copies for office review and redlines prior to downloading.
|
|||
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Water Service Inspection | Pending | |||
Amber Gregory | ||||
Sewer Service Inspection | Pending | |||
Amber Gregory | ||||
Interim Construction Site Management | Pending | |||
Scott Slamal | ||||
Final Planning Department Site Improvement | Pending | |||
Final Construction Site Management | Pending | |||
Scott Slamal | ||||
Building Final Inspection | Pending | |||
Structural Inspection | Pending | |||
Radon Piping | Pending | |||
Wall/Roof Sheeting | Pending | |||
Foundation Drain Inspection | Pending | |||
Foundation Inspection | Pending | |||
Shower Pan | Pending | |||
Roofing Inspection | Pending | |||
Framing Inspection | Pending | |||
Drywall Inspection | Pending | 4/30/2025 | 4/30/2025 | |
Foundation Drain Inspection | Partial Pass | 12/8/2023 | 12/8/2023 | 12/08/2023 |
Ron Norton | ||||
Foundation Water Proofing | Passed | 12/8/2023 | 12/8/2023 | 12/08/2023 |
Ron Norton | ||||
Footing Inspection | Passed | 1/10/2024 | 01/10/2024 | |
Jeff Yeiser | ||||
Foundation Inspection | Partial Pass | 1/10/2024 | 01/10/2024 | |
Jeff Yeiser | ||||
Shower Pan | Not Ready | 3/12/2024 | 3/13/2024 | 03/13/2024 |
Jeff Yeiser | ||||
Foundation/Under Slab Insulation | Passed | 5/21/2024 | 5/21/2024 | 05/21/2024 |
Jeff Yeiser | ||||
Roofing Inspection | Partial Pass | 10/16/2024 | 10/16/2024 | 10/16/2024 |
Ron Norton | ||||
Framing Inspection | Partial Pass | 11/22/2024 | 11/22/2024 | 11/22/2024 |
Ron Norton | ||||
Framing Inspection | Not Ready | 3/6/2025 | 3/6/2025 | 03/06/2025 |
Silas Ebbert | ||||
Framing Inspection | Partial Pass | 3/11/2025 | 3/11/2025 | 03/11/2025 |
Jeff Yeiser | ||||
Insulation Inspection | Partial Pass | 4/9/2025 | 4/9/2025 | 04/10/2025 |
Ron Norton | ||||
Drywall Inspection | Failed | 4/15/2025 | 4/15/2025 | 04/15/2025 |
Ron Norton | ||||
Insulation Inspection | Passed | 4/16/2025 | 4/16/2025 | 04/16/2025 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 4/17/2025 | 4/17/2025 | 04/17/2025 |
Ron Norton | ||||
Lath/Veneer Inspection | Passed | 4/25/2025 | 4/28/2025 | 04/28/2025 |
Ron Norton |
Condition | Status | Category |
---|---|---|
Use Tax Reconciliation | Open | Prior to Issuance of CO/CC |
Finance
Use Tax Reconciliation
|
||
Vested Approval Conditions | Resolved | Prior to Full Building Permit Issuance |
Planning Department
Compliance with PL20220086 conditions of approval required.
|
||
Vested Approval Conditions | Open | Prior to Issuance of TCO/CO/CC |
Planning Department
Compliance with PL20220086 conditions of approval required.
|
||
MF/Com/I Planning CO Review | Open | Prior to Issuance of TCO/CO/CC |
Planning Department
At the time of project completion, request certificate of occupancy inspections from the Department of Planning and Community Development to ensure the project has been built in accordance with the approved plans and the Community Development Code. The inspection may include but is not limited to general site planning and grading, landscaping and revegetation, outdoor lighting, parking and parking lot striping, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
|
||
Special Inspections Deffered Submittal | Open | Prior to Final Building Inspection |
Building Department
Special Inspection Reports shall be submitted immediately upon conclusion of the special inspections regardless if it passed or failed and prior to any work being done beyond this point if it failed.
See Structural Drawings for special inspections required by EOR.
|
||
Truss Drawings Deferred Submittal | Open | Prior to Issuance of TCO/CO/CC |
Building Department
Truss drawings shall be submitted, reviewed and approved prior to installation and inspections.
|
||
Blower Door Test Results | Open | Prior to Certificate of Occupancy/Completion |
Building Department
Blower Door Test Results
|
||
Completion Letter | Open | Prior to Issuance of TCO/CO/CC |
Engineering
Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection
|
||
Engineering Com/Ind/MF CO Review | Open | Prior to Issuance of TCO/CO/CC |
Engineering
At the time of project completion, submit a Improvement Summary Letter or Completion Letter signed and sealed by the Engineer of Record to the associated Development Plan in CityView Portal against the applicable condition. Upon receipt of the letter, Engineering will review and perform a Final Site Inspection for the TCO/CO request.
|
||
Miscellaneous Conditions | Resolved | Prior to Rough Building Wall Inspections |
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms
|
||
Final Fire Inspection Required | Open | Prior to Issuance of TCO/CO/CC |
Fire Prevention
Final alarm inspections must pass before TCO/CO sign-off.
|
||
Building Department Conditions to be Completed | Open | Prior to Issuance of TCO/CO/CC |
Building Department
Building Department Conditions to be Completed: Each townhome must be provided with a continuous running bath exhaust fan at 50 cfm minimum to meet exception for not providing whole house ventilation, this cannot have a switch but rather constantly running per Architects response, a timer could be added but would need an addendum.
|
||
Pre-Construction Mtg Reqd | Resolved | Within 30 days of Building Permit Issuance |
Engineering
Pre-construction meeting shall be to be scheduled prior to start of construction.
|
||
Building Department Conditions to be Completed | Open | Prior to Issuance of TCO/CO/CC |
Building Department
Boulder Walls out front need to be measured to ensure they are 3'11'' per structural plans.
|
Reference Number | Status | Type |
---|---|---|
SPRPL240132 | Permit(s) Issued | Plumbing |
SPRMH240133 | Permit(s) Issued | Mechanical |
SPREL240297 | Permit(s) Issued | Electrical |
SPRMH241646 | Permit(s) Issued | Mechanical |
SPRMH250212 | Permit(s) Issued | Mechanical |