City of Steamboat Springs Web Portal

Planning Application Status

PL20250063


You will only be able to view fees if you are a contact on the planning application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PL20250063
Steamboat Basecamp Ph2 Apartments
Development Plan
Development Plan - Public Hearing & Conditional Use & Major Variance
Waiting for Revisions
03/04/2025
FV BASECAMP, LLC
Development Plan application for a proposed 80-unit Apartment building located at the intersection of US40 and Curve Ct. (current Lot 2 of Steamboat Basecamp subdivision). This area was previously approved in DPVC-21-16 as 20 additional townhome units across 4 additional buildings. A dog park, outdoor community amenity area, and additional surface parking are proposed for existing Lot 3, Steamboat Basecamp.

Locations

Property
331900001

Property
331900002

Property
331900003

Address
1850 LUNA LN

Application Types

Development Plan - Public Hearing & Conditional Use & Major Variance

Planning Commission & Council
Waiting for Revisions

Hearings

There are no hearings for this planning application.

Inspections

There are no inspections for this planning application, or you are not authorized to view them.

Conditions

Condition Status Category
Site Posting Affidavit Resolved Prior to Final Review
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department. _ Complete [Kelly Douglas @ 03/31/2025 9:32 AM]
Mineral Rights Notification Affidavit Open
Planning Department
Mineral Rights Notification: Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
Building Dept Informational Comments Open Prior to Issuance of Construction Permit
Building Department
At this time all we reviewed was the site plan for required ADA parking spots, which aligns with chapter 11 requirements from the IBC. The Building Department has no further comments other than reminding the applicant the building will need to be designed in accordance with our current Building Code Ordinance adopted by the City of Steamboat Springs, this is avaialbe to review on the Building Department website. [Todd Carr @ 03/12/2025 12:59 PM]
Civils Required at BP Open Prior to Issuance of Construction Permit
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/Grading Permit application for review and approval prior to the start of any construction.
Record Drawings/CAD Files Open Prior to Issuance of CO/CC
Engineering
Record Drawings/CAD Files including drainage, PWQTF(s), and sidewalks shall be submitted prior to Final Engineering Site Inspection.
Final Drainage Study prior to BP Open Prior to Issuance of Construction Permit
Engineering
Prior to any construction permit issuance, the final signed and sealed drainage study shall be submitted.
Critical Improvements - Drainage Open Prior to Issuance of TCO/CO/CC
Engineering
Drainage improvements are considered a critical improvement and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first.
Critical Improvements - Access, Parking Open Prior to Issuance of TCO/CO/CC
Engineering
Access drive, driveway, and parking areas are considered a critical improvement and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first.
Completion Letter (Private Improv.) Open Prior to Engineering Final Approval Inspection
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be uploaded to the applicable building permit condition.
AO Avigation Easement - BP Open Prior to Issuance of Construction Permit
Planning Department
Prior to Building Permit issuance, the property owner shall record an avigation easement.
AO Proximity Disclosure - BP Open Prior to Issuance of Construction Permit
Planning Department
Prior to Building Permit issuance, the property owner shall record an airport proximity disclosure.
Workforce Units Open Prior to Certificate of Occupancy/Completion
Planning Department
The applicant shall enter into an agreement, acceptable to the City, restricting the occupancy of the Workforce Units to qualified residents as defined by the Community Development Code. The agreement shall be recorded at the Routt County Clerk and Recorder prior to Certificate of Occupancy/Completion.
Workforce Units Reporting Open Date Certain
Planning Department
The owner or rental agency for the property shall provide an annual report to the Planning Director outlining compliance with the deed restricted workforce units. The report shall, at a minimum, list all workforce units and how the occupants for each unit met the definition of Qualified Resident as defined in Community Development Code Section 802.
Informational Comment Open
Planning Department
Informational Comment: Contingent on approval, all even addresses off Luna Lane and all addresses off Percy Lane will be deactivated. Percy Lane will be dissolved and removed from the street database. This building will then receive an address of Big Bend Drive.

Related Permit & Planning Applications

There are no related items for this planning application.

Documents & Images

Date Uploaded File Type Name
Receipt
Letter
Letter
Letter DRT REVIEW COMMENTS.PDF
03/04/2025 Form PS25-0010-Fire Flow Availability
03/04/2025 Study PS25-0010_DPVC_Basecamp Ph2 - Geotechnical Report
03/04/2025 Study PS25-0010-Drainage Scope Approval
03/04/2025 Plans PS25-0010-Lighting plan
03/04/2025 Plans PS25-0010-Lighting Specifications
03/04/2025 Plans PS25-0010-Landscape Plans
03/04/2025 Plans PS25-0010-Grading, Drainage & Utility Plan
03/04/2025 Plans PS25-0010-Coversheet
03/04/2025 Other PS25-0010_DPVC_Basecamp Ph2- Submittal Checklist_signed
03/04/2025 Letter PS25-0010_DPVC_Basecamp Ph2-Proof of Ownership - Steamboat Basecamp
03/04/2025 Letter PS25-0010_DPVC_Basecamp Ph2-Proof of Ownership - Lot 3, Steamboat Basecamp
03/04/2025 PS25-0010_DPVC_Basecamp Ph2- Supplemental Parking Management Plan
03/04/2025 PS25-0010_DPVC_Steamboat Basecamp Parking Study 2-28-2025
03/04/2025 Narrative PS25-0010_DPVC_Basecamp Ph2- Project Narrative
03/28/2025 Affidavit PL20250063 Posting Surrounding Property Owner Notification Affidavit-notarized
04/08/2025 PL20250063 Section 402 Landscape Worksheet
04/08/2025 PL20250063 1850 Luna Ln DPVC Submittal 1 Planning Review
04/08/2025 PS25-0010-Landscape Plans Submittal 1 KZD Mark Up
04/08/2025 Plans PS25-0010-Existing Conditions Plan0 (Received)
04/08/2025 Plans PS25-0010-Site Plan (Received)
04/08/2025 Plans PS25-0010-Grading, Drainage & Utility Plan2 (Received)
04/08/2025 Plans PS25-0010-Architectural Plans (Received)
04/08/2025 Plans Basecamp 2 - Photometric Development Plan 20250319 (Received)
04/08/2025 Study PS25-0010-Drainage Letter0 (Received)
04/08/2025 Study PS25-0010_DPVC_Basecamp Ph2-Steamboat Basecamp Trip Generation Letter (Received)
04/08/2025 Study PS25-0010-Water Demand Report 0 (Received)