City of Steamboat Springs Web Portal

Planning Application Status

PL20220662


You will only be able to view fees if you are a contact on the planning application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PL20220662
Astrid Condominiums
Development Plan
Development Plan - Public Hearing & Major Variance
Waiting for Conditions
12/23/2022
STEAMBOAT ESQUIAR LP
Proposal for a phased, 63-unit base area development in seven buildings, as well as a pool/amenity building. __ Follow link for hearing agendas, staff reports, attachments, minutes, and media: https://docs.steamboatsprings.net/OnBaseAgendaOnline/

Locations

Property
156077001

Property
156302002

Property
156399201

Property
156577001

Property
289400001

Application Types

Development Plan - Public Hearing & Major Variance

Planning Commission & Council
Waiting for Conditions

Hearings

Title Location Date Time
Planning Commission, 2023-10-12, 05:00 PM Citizens Meeting Room, Centennial Hall, 124 10th Street 10/12/2023 5:00 PM
Recommendation
Approved with Conditions
City Council, 2023-11-14, 05:00 PM Citizens Meeting Room, Centennial Hall, 124 10th Street 11/14/2023 5:00 PM
Resolution
Approved with Conditions

Inspections

There are no inspections for this planning application, or you are not authorized to view them.

Conditions

Condition Status Category
Site Posting Affidavit Resolved Prior to Final Review
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
Mineral Rights Notification Affidavit Resolved
Planning Department
Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
Miscellaneous Condition Resolved
Fire Prevention
1.0 GENERAL PROVISIONS From the Steamboat Springs Fire Department Fire Access Road Standards Timing of installation. When fire apparatus access roads or a water supply for fire protection is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternative methods of protection are provided. Temporary street signs shall be installed at each street intersection when construction of new roadways allows passage by vehicles. 1.1 Where required: Fire apparatus access roads shall be required for every facility, building, or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. EXCEPTIONS: The fire code official is authorized to increase the dimension of 150 feet (45 720 mm) where: 1.1.1 The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 (NFPA 13), 903.3.1.2 (NFPA 13R) or 903.3.1.3 (NFPA 13D). 1.1.2 Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. In this case because the dimensions around these building are greater than 150' the fire department will require standpipes with FDC. Two standpipes on the north side of building 1 and another one standpipe located between buildings 3, 4 and 7.
Critical Improvements (List) Open Prior to Issuance of Certificate of Occupancy/Completion
Planning Department
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion for Phase 2, shown on DP-1.2b: a. Water and Sewer infrastructure b. Private Street infrastructure c. Access drive, driveway, and parking areas d. Drainage improvements e. Permanent storm water quality treatment facilities f. Sidewalk improvements i. Ski Trail Ln north side sidewalk g. Trail improvements See PL20240323 Substantial Conformance [Kelly Douglas @ 11/08/2024 10:50 AM]
Payment of Fees Resolved Prior to Issuance of Construction Permit
Mount Werner Water & Sanitation
The owner shall pay Plant Investment Fess to MWW prior to issuance of any Building Permit. Paid on 3/20/2025
Miscellaneous Condition Open Prior to Issuance of Construction Permit
Planning Department
The applicant shall pay the required 1% for community amenities per CDC Section 440.C.1.c prior to issuance of a building permit. As a phased development, contributions shall be assessed based on construction valuation for each individual building permit being applied for. SPRFO240425 Retaining Wall #2 $TBD SPRMU240254 Building 7 $117,300 paid 3/20/25 [Kelly Douglas @ 03/20/2025 11:52 AM]
Development Agreement Resolved Prior to Issuance of Construction Permit
Planning Department
Per 413.C.2, a development agreement shall be recorded to document phasing and terms of off-site amenities prior to issuance of a building permit. _ Ok recorded at reception no 859656 [Kelly Douglas @ 03/31/2025 2:09 PM]
Civils Required Resolved Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat
Engineering
Civil Construction Plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to DRT for review and approval prior to approval of any Improvements Agreement, Building Permit, Grading Permit, or Final Plat and prior to the start of any construction. ____ PL20240055
PWQ O&M prior to CO/CAC Open Prior to Issuance of CO/CC
Engineering
Prior to Certificate of Occupancy/Completion, an executed Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
Completion Letter (Private Improv.) Open Prior to Engineering Final Approval Inspection
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be uploaded to the applicable building permit condition.
Record Drawings/CAD Files Open Prior to Issuance of CO/CC
Engineering
Record Drawings/CAD Files including drainage, PWQTF(s), and sidewalks shall be submitted prior to Final Engineering Site Inspection.
Miscellaneous Condition Resolved
Mount Werner Water & Sanitation
Final review / approval of Utility Plan by MWW to occur after final utility plan is submitted
Third Party Certification (Base Area) Open Prior to Certificate of Occupancy/Completion
Planning Department
CDC Section 440 (Base Area Design Standards) requires all buildings in the Base Area to comply with third-party certification of building materials and construction techniques that are consistent with a nationally recognized sustainable building program or alternative approved by the Director of Planning and Community Development. Prior to issuance of a Building Permit, the owner shall provide documentation to the City about the proposed program the project will comply with. Prior to Certificate of Occupancy/Completion, the owner shall provide the City with proof of completion of the chosen sustainable building program.
Miscellaneous Condition Resolved Prior to Issuance of Construction Permit
Planning Department
Prior to issuance of a construction permit, an agreement between the property owner and Bear Claw II shall be provided to the City. Said agreement shall provide access to off-site amenities in perpetuity, or until: -Issuance of Certificates of Occupancy/Approval for all buildings inlcuded with PL20220662 Phase II is complete, or -A future approved Development Plan provides amenities on-site in accordance with CDC Section 440.C.1.b. __ Resolved. See document 'ASTRID_BC2_AMENITIES_AGREEMENT.PDF' [Kelly Douglas @ 05/02/2024 10:14 AM]
Mailing Affidavit Resolved
Planning Department
Mailing Affidavit: Submit a signed affidavit no later than eight days prior to the required public hearing or final decision date confirming the required mailed notice has been completed in accordance with Section 703.C.2.

Related Permit & Planning Applications

There are no related items for this planning application.

Documents & Images

Date Uploaded File Type Name
Letter 2023-01-03 ASTRID LETTER TO CITY PLANNING.PDF
Letter 20230106075739013.PDF
Plans ARCHITECTURAL DRAWINGS - ASTRID 07-31-2023 SHEET DP-3.1 KD MARK UP.PDF
Agreement ASTRID_BC2_AMENITIES_AGREEMENT.PDF
Letter DRT REFERRAL FORM.PDF
DRT REFERRAL FORM.PDF
Letter NOTICE OF COMPLETE APPLICATION.PDF
Letter NOTICE OF FINAL DECISION.PDF
Letter NOTICE OF INCOMPLETE APPLICATION.PDF
Plans PL20220662 APPROVED PLAN SET (STAMPED).PDF
Letter PL20220662 PLANNING REVIEW MEMO SUBMITTAL 1.PDF
PL20220662 PLANNING REVIEW MEMO SUBMITTAL 2.PDF
Letter PL20220662 PLANNING REVIEW MEMO SUBMITTAL 3.PDF
Receipt RECEIPT.PDF
Letter SCAN JAN 6, 2023 AT 12.33 PM.PDF
Email TMP54EA.MSG
12/23/2022 Light Fixture Cut Sheets - Astrid 12-23-22
12/23/2022 STORMWATER PCN - ASTRID 12-14-22
12/23/2022 Form Fire Flow Requirements and Availability Worksheet - ASTRID
01/09/2023 2023-01-03 Astrid Letter from Ski Trail Condos to City Planning
02/07/2023 Affidavit Astrid - PublicNoticeAffidavitSIGN-SIGNED 2-7-2023
02/10/2023 Affidavit PL20220662 - MineralRightOwnerNotificationAffidavit SIGNED
03/31/2023 Letter DRT Review Comments (Generate/Send DRT Review Comments Notice)
03/31/2023 Letter Routt County Assessor_s Office, Property Search R8170393 (Final)
03/31/2023 Letter Routt County Assessor_s Office, Property Search R8171664 (Final)
03/31/2023 Letter Routt County Assessor_s Office, Property Search R8172679 (Final)
03/31/2023 Other PS22-0254_DP_EdgemontPhII - SIGNED (Final)
03/31/2023 Plans Civil Narrative - Astrid 2022-12-22 (Final)
03/31/2023 Plans LIGHTING PLAN - ASTRID (Final)
03/31/2023 Study DRAINAGE & STORMWATER APPROVAL - ASTRID 12-13-22 (Final)
03/31/2023 Study Subsoil and Foundation Investigation Report - Astrid 12-22-22 (Final)
03/31/2023 Study TRAFFIC IMPACT SCOPE APPROVAL FORM - Astrid (Final)
03/31/2023 Study TRAFFIC IMPACT STUDY - ASTRID 12-6-22 (Final)
03/31/2023 Study TRAFFIC IMPACT STUDY APPROVAL - ASTRID 10-12-22 (Final)
03/31/2023 Study WaterDemandReportWaiver - Astrid Bldg 1 12-22-2022 (Final)
03/31/2023 Narrative FIRE CODE ANALYSIS - ASTRID (Final)
05/19/2023 MATERIAL BOARD BLDG 1-6 - ASTIRD 5-19-2023
05/19/2023 MATERIAL BOARD BLDG 7 - ASTIRD 5-19-2023
05/19/2023 ASTRID-GONDOLA LANE ROAD STANDARD VARIANCE Table 4-3_B
05/19/2023 ASTRID-MAILBOX EXHIBIT
05/19/2023 ASTRID-MWW Appendix H Rules_Regulations_2023
05/19/2023 Astrid Easement Cover Letter 5-19-2023
05/19/2023 DRT #1 RESPONSE LETTER - ASTRID 05-19-2023
05/19/2023 Study Drainage Report - ASTRID 5-19-2023
05/19/2023 Fire Flow Analysis - ASTRID 5-17-2023
05/19/2023 3D Views - ASTRID 5-19-2023
05/22/2023 Email Astrid Condominium project
06/30/2023 Letter DRT Review Comments (Generate/Send DRT Review Comments Notice)
06/30/2023 Plans Landscape Green Roof Plan - ASTRID 5-19-2023 (Received)
06/30/2023 Plans Existing Conditions Plan - ASTRID 5-19-2023 (Received)
07/31/2023 DRT #2 RESPONSE LETTER - ASTRID 07-31-2023
07/31/2023 THE ASTRID - 3D MODEL - 2023-07-31
07/31/2023 Plans Landscape Plan & Details - ASTRID 7-31-2023
07/31/2023 Narrative DP NARRATIVE REVISED - ASTRID 7-31-2023
09/07/2023 Letter DRT Review Comments (Generate/Send DRT Review Comments Notice)
09/07/2023 Plans Utility Plans - ASTRID 7-31-2023 (Received)
09/20/2023 DRT #3 RESPONSE LETTER - ASTRID 09-20-2023
09/20/2023 Astrid_BC II Agreement
09/20/2023 Plans Phasing Plans - Astrid 09-20-2023
09/20/2023 Plans Architectural Drawings - Astrid 09-20-2023
09/20/2023 Plans Cover Sheet - Astrid 09-20-2023
09/22/2023 Narrative DP NARRATIVE REVISED - ASTRID 09-20-2023
09/25/2023 Plans Site Plan - ASTRID 9-20-2023 (Received)
09/25/2023 Plans Grading & Drainage - ASTRID 9-20-2023 (Received)
09/25/2023 Other PL20220662 SPO List
09/28/2023 Affidavit PL20220662 PUBLIC NOTICE AFFIDAVIT SIGNED 9-28-23
12/19/2023 Resolution 2023_64_Astrid_Development_Plan_PL20220662