- Home
- City of Steamboat Springs Web Portal
City of Steamboat Springs Web Portal
Planning Application Status
PL20220662
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Title | Location | Date | Time |
---|---|---|---|
Planning Commission, 2023-10-12, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 10/12/2023 | 5:00 PM |
Recommendation
Approved with Conditions
|
|||
City Council, 2023-11-14, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 11/14/2023 | 5:00 PM |
Resolution
Approved with Conditions
|
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Mineral Rights Notification Affidavit | Resolved | |
Planning Department
Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
|
||
Miscellaneous Condition | Resolved | |
Fire Prevention
1.0 GENERAL PROVISIONS From the Steamboat Springs Fire Department Fire Access Road Standards
Timing of installation. When fire apparatus access roads or a water supply for fire protection is required to be installed,
such protection shall be installed and made serviceable prior to and during the time of construction except when approved
alternative methods of protection are provided. Temporary street signs shall be installed at each street intersection when
construction of new roadways allows passage by vehicles.
1.1 Where required: Fire apparatus access roads shall be required for every facility, building, or portion of a building hereafter
constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of
this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior
walls of the first story of the building as measured by an approved route around the exterior of the building or facility.
EXCEPTIONS: The fire code official is authorized to increase the dimension of 150 feet (45 720 mm) where:
1.1.1 The building is equipped throughout with an approved automatic sprinkler system installed in accordance
with Section 903.3.1.1 (NFPA 13), 903.3.1.2 (NFPA 13R) or 903.3.1.3 (NFPA 13D).
1.1.2 Fire apparatus access roads cannot be installed because of location on property, topography, waterways,
nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided.
In this case because the dimensions around these building are greater than 150' the fire department will require standpipes with FDC. Two standpipes on the north side of building 1 and another one standpipe located between buildings 3, 4 and 7.
|
||
Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
Planning Department
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion for Phase 2, shown on DP-1.2b:
a. Water and Sewer infrastructure
b. Private Street infrastructure
c. Access drive, driveway, and parking areas
d. Drainage improvements
e. Permanent storm water quality treatment facilities
f. Sidewalk improvements
i. Ski Trail Ln north side sidewalk
g. Trail improvements
See PL20240323 Substantial Conformance [Kelly Douglas @ 11/08/2024 10:50 AM]
|
||
Payment of Fees | Resolved | Prior to Issuance of Construction Permit |
Mount Werner Water & Sanitation
The owner shall pay Plant Investment Fess to MWW prior to issuance of any Building Permit.
Paid on 3/20/2025
|
||
Miscellaneous Condition | Open | Prior to Issuance of Construction Permit |
Planning Department
The applicant shall pay the required 1% for community amenities per CDC Section 440.C.1.c prior to issuance of a building permit. As a phased development, contributions shall be assessed based on construction valuation for each individual building permit being applied for.
SPRFO240425 Retaining Wall #2 $TBD
SPRMU240254 Building 7 $117,300 paid 3/20/25 [Kelly Douglas @ 03/20/2025 11:52 AM]
|
||
Development Agreement | Resolved | Prior to Issuance of Construction Permit |
Planning Department
Per 413.C.2, a development agreement shall be recorded to document phasing and terms of off-site amenities prior to issuance of a building permit.
_
Ok recorded at reception no 859656 [Kelly Douglas @ 03/31/2025 2:09 PM]
|
||
Civils Required | Resolved | Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat |
Engineering
Civil Construction Plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to DRT for review and approval prior to approval of any Improvements Agreement, Building Permit, Grading Permit, or Final Plat and prior to the start of any construction.
____
PL20240055
|
||
PWQ O&M prior to CO/CAC | Open | Prior to Issuance of CO/CC |
Engineering
Prior to Certificate of Occupancy/Completion, an executed Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
|
||
Completion Letter (Private Improv.) | Open | Prior to Engineering Final Approval Inspection |
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be uploaded to the applicable building permit condition.
|
||
Record Drawings/CAD Files | Open | Prior to Issuance of CO/CC |
Engineering
Record Drawings/CAD Files including drainage, PWQTF(s), and sidewalks shall be submitted prior to Final Engineering Site Inspection.
|
||
Miscellaneous Condition | Resolved | |
Mount Werner Water & Sanitation
Final review / approval of Utility Plan by MWW to occur after final utility plan is submitted
|
||
Third Party Certification (Base Area) | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
CDC Section 440 (Base Area Design Standards) requires all buildings in the Base Area to comply with third-party certification of building materials and construction techniques that are consistent with a nationally recognized sustainable building program or alternative approved by the Director of Planning and Community Development. Prior to issuance of a Building Permit, the owner shall provide documentation to the City about the proposed program the project will comply with. Prior to Certificate of Occupancy/Completion, the owner shall provide the City with proof of completion of the chosen sustainable building program.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance of Construction Permit |
Planning Department
Prior to issuance of a construction permit, an agreement between the property owner and Bear Claw II shall be provided to the City. Said agreement shall provide access to off-site amenities in perpetuity, or until:
-Issuance of Certificates of Occupancy/Approval for all buildings inlcuded with PL20220662 Phase II is complete, or
-A future approved Development Plan provides amenities on-site in accordance with CDC Section 440.C.1.b.
__
Resolved. See document 'ASTRID_BC2_AMENITIES_AGREEMENT.PDF' [Kelly Douglas @ 05/02/2024 10:14 AM]
|
||
Mailing Affidavit | Resolved | |
Planning Department
Mailing Affidavit: Submit a signed affidavit no later than eight days prior to the required public hearing or final decision date confirming the required mailed notice has been completed in accordance with Section 703.C.2.
|
There are no related items for this planning application.
Powered by CityView
