| Date Returned | Name |
|---|---|
| 03/03/2025 | New Header Letter 02.27.2025 (Stamped) |
| 12/04/2024 | 24042_Foundation Changes Letter (1) (Stamped) |
| 12/04/2024 | 24042_Footing Letter (Stamped) |
| 08/25/2025 | Fire seperation detail 20250821 (Stamped) |
| 08/25/2025 | 24042_Fire Separation (Stamped) |
| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| COO Review - Building Code | Approved | 01/26/2026 | 01/16/2026 |
| COO Review - Finance Department | TCO Approved | 01/06/2026 | 01/06/2026 |
| COO Review - Building Code | TCO Approved | 01/13/2026 | 01/06/2026 |
| COO Review - Planning | Approved | 01/07/2026 | 12/30/2025 |
| COO Review - Building Code | Failed | 12/30/2025 | 12/30/2025 |
| COO Review - Planning | Failed | 01/06/2026 | 12/29/2025 |
| COO Review - Engineering (SF/DU) | TCO Approved | 01/06/2026 | 12/29/2025 |
| COO Review - Fire Code | Approved | 01/06/2026 | 12/29/2025 |
| Building Code Review | Approved | 08/28/2025 | 08/25/2025 |
| Building Code Review | Approved | 03/10/2025 | 03/03/2025 |
| Building Code Review | Approved | 12/10/2024 | 12/04/2024 |
| Utilities Review - City | Approved | 11/13/2024 | 11/14/2024 |
| Planning Review | Approved | 11/13/2024 | 11/13/2024 |
| Construction Site Management Review | Approved | 11/13/2024 | 11/08/2024 |
| Building Code Review | Approved | 11/13/2024 | 11/06/2024 |
| Utilities Review - City | Failed | 10/30/2024 | 10/31/2024 |
| Construction Site Management Review | Failed | 10/30/2024 | 10/31/2024 |
| Planning Review | Failed | 10/30/2024 | 10/30/2024 |
| Building Code Review | Failed | 10/30/2024 | 10/24/2024 |
| Planning Review | Failed | 09/26/2024 | 10/02/2024 |
| Construction Site Management Review | Failed | 09/25/2024 | 09/27/2024 |
| Utilities Review - City | Failed | 09/26/2024 | 09/27/2024 |
| GIS Land Development Review | Approved | 09/26/2024 | 09/26/2024 |
| Fire Code Review | Approved | 09/26/2024 | 09/26/2024 |
| External Agencies Review | Approved | 09/26/2024 | 09/26/2024 |
| Building Code Review | Failed | 09/26/2024 | 09/25/2024 |
| Electrical Review | Approved | 09/26/2024 | 09/20/2024 |
| Finance Department Review | Approved | 09/26/2024 | 09/12/2024 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Rough Site Inspection | Pending | |||
| Scott Slamal | ||||
| Final Site Inspection | Pending | |||
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Outstanding
03/20/2026
Road base shouldering required where damaged along Sundance Ct approximately 50' up and down from the driveway access. City requires 18" of road base from edge of pavement. This will also need to be applied along Steamboat Blvd where the temporary access was used.
|
||||
|
Miscellaneous
Outstanding
03/20/2026
All disturbed soils must be stabilized with native seed mix and biodegradable erosion control blankets including the drainage ditch on Sundance.
|
||||
|
Miscellaneous
Outstanding
03/20/2026
The temporary construction access off Steamboat Blvd must be removed and the area regraded to its original condition, stabilized with native seed and biodegradable erosion control blankets.
|
||||
| Footing Inspection | Partial Pass | 12/6/2024 | 12/6/2024 | 12/06/2024 |
| Ron Norton | ||||
| Foundation Inspection | Partial Pass | 12/20/2024 (Afternoon) | 12/27/2024 | 12/27/2024 |
| Ron Norton | ||||
| Foundation Inspection | Partial Pass | 12/27/2024 | 12/30/2024 | 12/30/2024 |
| Ron Norton | ||||
| Foundation Drain Inspection | Partial Pass | 1/30/2025 | 1/31/2025 | 01/31/2025 |
| Ron Norton | ||||
| Framing Inspection | Partial Pass | 2/18/2025 | 2/19/2025 | 02/19/2025 |
| Ron Norton | ||||
| Footing Inspection | Partial Pass | 02/25/2025 | ||
| Ron Norton | ||||
| Foundation Water Proofing | Not Ready | 2/25/2025 | 2/25/2025 | 02/25/2025 |
| Ron Norton | ||||
| Foundation Inspection | Partial Pass | 2/28/2025 | 2/28/2025 | 02/28/2025 |
| Silas Ebbert | ||||
| Foundation Drain Inspection | Partial Pass | 3/4/2025 | 3/4/2025 | 03/04/2025 |
| Ron Norton | ||||
| Wall/Roof Sheeting | Passed | 3/27/2025 | 3/27/2025 | 03/27/2025 |
| Silas Ebbert | ||||
| Footing Inspection | Partial Pass | 3/31/2025 | 3/31/2025 | 03/31/2025 |
| Ron Norton | ||||
| Foundation Inspection | Partial Pass | 3/31/2025 | 3/31/2025 | 03/31/2025 |
| Ron Norton | ||||
| Framing Inspection | Partial Pass | 05/05/2025 | ||
| Ron Norton | ||||
| Radon Piping | Partial Pass | 6/9/2025 | 6/9/2025 | 06/09/2025 |
| Ron Norton | ||||
| Foundation Inspection | Partial Pass | 7/2/2025 | 7/2/2025 | 07/02/2025 |
| Ron Norton | ||||
| Framing Inspection | Partial Pass | 8/11/2025 | 8/11/2025 | 08/11/2025 |
| Ron Norton | ||||
| Insulation Inspection | Passed | 8/21/2025 | 8/21/2025 | 08/21/2025 |
| Ron Norton | ||||
| Sewer Service Inspection | Passed | 8/20/2025 | 8/20/2025 | 09/05/2025 |
| Baseline Inspectors | ||||
| Shower Pan | Passed | 9/11/2025 | 09/11/2025 | |
| Todd Carr | ||||
| Water Service Inspection | Passed | 9/25/2025 | 9/25/2025 | 09/25/2025 |
| Baseline Inspectors | ||||
| Building Final Inspection | Passed | 12/29/2025 | 12/29/2025 | 12/29/2025 |
| Jeff Yeiser | ||||
| Final Site Inspection | Failed | 3/18/2026 | 3/18/2026 | 03/20/2026 |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
03/20/2026
Road base shouldering required where damaged along Sundance Ct approximately 50' up and down from the driveway access. City requires 18" of road base from edge of pavement. This will also need to be applied along Steamboat Blvd where the temporary access was used.
|
||||
|
Miscellaneous
Carried Forward
03/20/2026
All disturbed soils must be stabilized with native seed mix and biodegradable erosion control blankets including the drainage ditch on Sundance.
|
||||
|
Miscellaneous
Carried Forward
03/20/2026
The temporary construction access off Steamboat Blvd must be removed and the area regraded to its original condition, stabilized with native seed and biodegradable erosion control blankets.
|
||||
| Condition | Status | Category |
|---|---|---|
| Use Tax Reconciliation | Open | Prior to Issuance of CO/CC |
|
Finance
Use Tax Reconciliation
|
||
| Building Department Conditions to be Completed | Resolved | Prior to Full Building Permit Issuance |
|
Building Department
Malea to create permit for unit 2 of duplex.
|
||
| Miscellaneous Conditions | Resolved | |
|
Fire Prevention
Any fire alarm/sprinkler work will require a permit/plans to be submitted to Fire Prevention. See www.steamboatsprings.net, Fire and EMS Services, Fire Prevention, Downloadable Permits and Forms. NB [Charles Brookshire @ 09/26/2024 3:48 PM]
|
||
| Final Fire Inspection Required | Resolved | Prior to Issuance of TCO/CO/CC |
|
Fire Prevention
Fire needs to be involved with TCO/CO/CC sign-off in case there is an alarm or sprinkler permit. [Shannon Yaconiello @ 09/26/2024 4:08 PM]
|
||
| Engineering Sf/Du CO Review | Open | Prior to Issuance of CO/CC |
|
Engineering
At the time of project completion, request the Final Site Inspection from the Department of Public Works Engineering Div. to ensure the project has been built in accordance with the approved plans. [Scott Slamal @ 09/27/2024 2:22 PM]
|
||
| Blower Door Test Results | Resolved | Prior to Certificate of Occupancy/Completion |
|
Building Department
Blower Door Test Results
Reviewed and resolved. [Malea Michael-Ferrier @ 01/16/2026 1:35 PM]
|
||
| Heat Loss Calculations Deferred Submittal | Resolved | Prior to Mechanical Permit Issuance for Heat |
|
Building Department
Heat Load Calculations must be submitted, Reviewed and approved prior to any heating equipment being installed.
Reviewed and resolved. [Malea Michael-Ferrier @ 01/05/2026 3:03 PM]
|
||
| Engineering Sf/Du CO Review | Open | Prior to Issuance of CO/CC |
|
Engineering
The temporary construction access that has been used off Steamboat Blvd must be removed, regraded to its original condition and stabilized with native seed and biodegradable erosion control blankets prior to CO approval. [Scott Slamal @ 03/20/2026 1:34 PM]
|
||
| FLC Submittal | Resolved | Prior to Rough Site Inspection |
|
Planning Department
Foundation location certificate shall be provided
FLC Review complete.
|
||
| SFR/Dup Planning CO Review | Resolved | Prior to Issuance of TCO/CO/CC |
|
Planning Department
Prior to issuance of a Certificate of Occupancy, the Department of Planning and Community Development may conduct an onsite inspection to ensure the project has been built in accordance with the approved plans and the Community Development Code. In the event the planning department deems an inspection necessary, a planning representative will contact the applicant. The applicant need not call for inspections. The inspection may include but is not limited to general site planning and grading, outdoor lighting, parking, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
|
||
| Reference Number | Status | Type |
|---|---|---|
| SPRPL250611 | Closed | Plumbing |
| SPRPL250715 | Closed | Plumbing |
| SPREL250988 | Closed | Electrical |
| SPRMH251252 | Closed | Mechanical |