Planning Application Status

PL20250210


You will only be able to view fees if you are a contact on the planning application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PL20250210
The Vantage at Village Drive
Development Plan
Development Plan - Public Hearing & Conditional Use & Major Variance
Waiting for Revisions
06/12/2025
VILLAGE DRIVE TOWNHOMES LLC
A Development Plan, Conditional Use and Major Variance for The Vantage at Village Drive

Locations

Application Types

Development Plan - Public Hearing & Conditional Use & Major Variance

Planning Commission & Council
Waiting for Revisions

Hearings

There are no hearings for this planning application.

Inspections

There are no inspections for this planning application, or you are not authorized to view them.

Conditions

Condition Status Category
Outstanding Fees Resolved Prior to Final Review
Planning Department
Outstanding fees are required to be paid as this application is associated with CE20250009.
Site Posting Affidavit Resolved Prior to Final Review
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
Mineral Rights Notification Affidavit Resolved
Planning Department
Mineral Rights Notification: Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
Critical Improvements (List) Open Prior to Issuance of Certificate of Occupancy/Completion
Engineering
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first: • Water and Sewer infrastructure • Access drive, driveway, and parking areas • Drainage improvements • Permanent storm water quality treatment facilities • Sidewalk improvements • Snowmelt system
PWQ O&M prior to CO/CAC Open Prior to Issuance of CO/CC
Engineering
Prior to Certificate of Occupancy/Completion, an Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
Record Drawings/CAD Files Open Prior to Permanent Stormwater Quality Treatment Facility Inspection
Engineering
Record Drawings/CAD Files shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection
Civils Required Open Prior to Issuance of Construction Permit
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/ Grading Permit application for review and approval prior to the start of any construction.
Executed Easements Prior to BP/GF Resolved Prior to Issuance of Construction Permit
Engineering
The owner shall provide the following recorded easements prior to issuance of a construction permit (Grade and Fill, Building): • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Public access easements for public sidewalks which are not completely within the right-of-way.
Miscellaneous Condition Open Prior to Final Review
Planning Department
An easement vacation application is required prior to final review and scheduling of this project.
Miscellaneous Condition Open Condition of Future Submittal
Planning Department
The project is approved with a snowmelt system and no designated areas for snow storage or plan for snow hauling. The snowmelt system shall be kept in operating condition in perpetuity. Any circumstance on the property other than a snowmelt system serving the entire development will require development plan approval.
Revocable License/Permit prior to BP/GF Open Prior to Certificate of Occupancy/Completion
Planning Department
Prior to issuance of a CO, a revocable license/permit shall be issued for all privately maintained encroachments into the public right-of-way or public easement: Landscaping, landscaping improvements, stairs, private walkways. If a permit is on file it shall be updated with changes reflected in these plans.
Building Dept Informational Comments Open Prior to Issuance of Construction Permit
Building Department
Our Review was completed reading the narrative submitted on 07/07/2025 only, as this is the most recent narrative provided, and therefore we have disregarded all narratives previously submitted and our comments, corrections or approvals have not be completed based upon any other narratives other than the one dated 07/07/2025. We have conditionally approved the new Development plan with conditions added to our approval. The Design Team and Contractor still have to resubmit all new archiectural plans, structural plans, and site plans, and MEP plans for all the changes to the decks along village drive, the boiler/mechanical/fire alarm building, and new proposed stairs off walton creek for review, all work done on the site to date not in accordance with Stamped Approved plans was done at owners own risk, not through reviewing Departments approval. Also all structural work on the decks along village drive with respect to the structural columns needing to bear down on the rention pond foundation must be complete yet if the new deck sizes are approved. [Todd Carr @ 07/10/2025 12:00 PM]

Related Permit & Planning Applications

There are no related items for this planning application.

Documents & Images

Date Uploaded File Type Name
Letter DRT REFERRAL FORM.PDF
Letter DRT REVIEW COMMENTS.PDF
Letter NOTICE OF COMPLETE APPLICATION.PDF
Letter NOTICE OF INCOMPLETE APPLICATION.PDF
Letter NOTICE OF INCOMPLETE APPLICATION0.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
06/12/2025 Revisions to Landmark CD's 24x36
06/12/2025 Plans Arch Plans 1-9 Village Drive
06/12/2025 Plans Arch Renderings Village Drive
06/12/2025 Plans Village Drive Grading Plan C3
06/12/2025 Plans Village Drive Site Plan C2
06/12/2025 Other Signed Applications - DEV App Village Dr_ - Jun 4 2025 - 6-45 PM
06/12/2025 Village Drive Exhibit Plan C1-1
06/18/2025 Narrative Village Drive Townhome CDC Development Narrative 6-18-2025
07/01/2025 PL20250210 and PL20250211 Minerals
07/01/2025 PL20250210 and PL20250211 Posting
07/07/2025 1849-002 - Village Drive Townhomes - Vehicle Tracking Plan 2025
07/07/2025 Village Drive Townhome CDC Development Narrative 7-7-2025
07/16/2025 Letter Property Record Card CO Routt Print Page (Received)
07/16/2025 Plans Village Drive Ex Conds C1 (Received)
07/16/2025 Plans Village Drive Site Plan C3 (Received)
07/16/2025 Plans Village Drive Sanitary Sewer C5A (Received)
07/16/2025 Plans Village Drive Sanitary Sewer Profile C5B (Received)
07/16/2025 Plans 1-9 Pages from 2025 06 12 Village Drive Townhomes Arch DP set (Received)
07/16/2025 Plans 10-14 Pages from 2025 06 12 Village Drive Townhomes Arch DP set (Received)
07/16/2025 Plans Village Drive Townhomes - SITE PLAN REVIEW 06-12-2025 REVISED (Received)
07/16/2025 Plans Village Drive Townhomes - SITE PLAN REVIEW 06-18-2025 REVISEDa (Received)
07/16/2025 Plans 1805 Walton Creek - Elec Photometric Plan 20250610 (Received)
07/16/2025 Plans Village Drive Townhome CDC Variance Retaining Walls (Received)
07/18/2025 Plans Lot 1 Village Townhomes EXC1-1
07/18/2025 Plans Lot 1 Village Townhomes EXC1-2
07/18/2025 Plans Lot 1 Village Townhomes EXC1-3
07/18/2025 Narrative Village Drive Townhome CDC Variance Retaining Walls
07/18/2025 Report 23SSL018_VILLAGE DR TOWNHOMES_FINAL_REV0-REPORT
07/18/2025 Report 23SSL018_VILLAGE DR TOWNHOMES_FINAL_REV0-MQE (1)
07/29/2025 DRTcomments72225