Planning Application Status
PL20250210
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
There are no hearings for this planning application.
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Outstanding Fees | Resolved | Prior to Final Review |
Planning Department
Outstanding fees are required to be paid as this application is associated with CE20250009.
|
||
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Mineral Rights Notification Affidavit | Resolved | |
Planning Department
Mineral Rights Notification: Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
|
||
Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
Engineering
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first: • Water and Sewer infrastructure • Access drive, driveway, and parking areas • Drainage improvements • Permanent storm water quality treatment facilities • Sidewalk improvements • Snowmelt system
|
||
PWQ O&M prior to CO/CAC | Open | Prior to Issuance of CO/CC |
Engineering
Prior to Certificate of Occupancy/Completion, an Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
|
||
Record Drawings/CAD Files | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Record Drawings/CAD Files shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection
|
||
Civils Required | Open | Prior to Issuance of Construction Permit |
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/ Grading Permit application for review and approval prior to the start of any construction.
|
||
Executed Easements Prior to BP/GF | Resolved | Prior to Issuance of Construction Permit |
Engineering
The owner shall provide the following recorded easements prior to issuance of a construction permit (Grade and Fill, Building): • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Public access easements for public sidewalks which are not completely within the right-of-way.
|
||
Miscellaneous Condition | Open | Prior to Final Review |
Planning Department
An easement vacation application is required prior to final review and scheduling of this project.
|
||
Miscellaneous Condition | Open | Condition of Future Submittal |
Planning Department
The project is approved with a snowmelt system and no designated areas for snow storage or plan for snow hauling. The snowmelt system shall be kept in operating condition in perpetuity. Any circumstance on the property other than a snowmelt system serving the entire development will require development plan approval.
|
||
Revocable License/Permit prior to BP/GF | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
Prior to issuance of a CO, a revocable license/permit shall be issued for all privately maintained encroachments into the public right-of-way or public easement: Landscaping, landscaping improvements, stairs, private walkways. If a permit is on file it shall be updated with changes reflected in these plans.
|
||
Building Dept Informational Comments | Open | Prior to Issuance of Construction Permit |
Building Department
Our Review was completed reading the narrative submitted on 07/07/2025 only, as this is the most recent narrative provided, and therefore we have disregarded all narratives previously submitted and our comments, corrections or approvals have not be completed based upon any other narratives other than the one dated 07/07/2025. We have conditionally approved the new Development plan with conditions added to our approval. The Design Team and Contractor still have to resubmit all new archiectural plans, structural plans, and site plans, and MEP plans for all the changes to the decks along village drive, the boiler/mechanical/fire alarm building, and new proposed stairs off walton creek for review, all work done on the site to date not in accordance with Stamped Approved plans was done at owners own risk, not through reviewing Departments approval. Also all structural work on the decks along village drive with respect to the structural columns needing to bear down on the rention pond foundation must be complete yet if the new deck sizes are approved. [Todd Carr @ 07/10/2025 12:00 PM]
|