Permit Application Status
SPRRN230222
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Date Returned | Name |
---|---|
04/19/2023 | TP Lobby Remodel SPRRN230222l_Garcia Phased Approach Request Letter 04 18 23 (Stamped) |
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
COO Review - Finance Department | Approved | 03/08/2024 | 03/01/2024 |
Sondra Spratta
|
|||
COO Review - Building Code | Approved | 07/06/2023 | 07/06/2023 |
Heidi Spengler
|
|||
All building complete. | |||
COO Review - Finance Department | TCO Approved | 07/06/2023 | 06/29/2023 |
Amy Camilletti
|
|||
COO Review - Fire Code | Failed | 07/06/2023 | 06/28/2023 |
Shannon Yaconiello
|
|||
Fire never received alarm or sprinkler permits for this work. If no alarm or sprinkler work was done, Fire needs to do a walk thru to make sure that the existing alarm and sprinkler systems are still functioning properly before CC sign-off. Please call 970-871-8216 to schedule a walk thru. | |||
Building Code Review | Approved | 06/15/2023 | 06/08/2023 |
Ted Allen
|
|||
See email for update regarding conditional approval. | |||
Building Code Review | Approved | 08/11/2023 | 04/19/2023 |
Ted Allen
|
|||
Miscellaneous
Carried Forward
04/19/2023
Routt County Regional Building Department (RCRBD) typically requires the architect or registered design professional to provide a code analysis using the 2018 International Building Code. Chapter 6 establishes five types of construction in which each building must be categorized. Looking at the allowable materials used, the existing building comprise a Type IA Type Construction. Original plans will show differences between concrete bearing walls and concrete frames that are typically associated with large spandrels required at windows. For this reason, documents submitted to the building official must be of sufficient detail to clearly show the project in its entirety with emphasis on the following:
IV. Seismic risk
V. Design loads
Please update concept drawings with this information, signed and sealed in accordance with Colorado State Law and include set of existing plans in electronic file for our records. Please upload complete set of original Torian Plum. Submit original stamped, signed and sealed engineering drawings as deemed necessary by RCRBD (the building department).
When special inspection is required the architect or engineer shall prepare an inspection program which shall be submitted to the building official or his authorized representative for approval prior to issuance of the building permit. The inspection program shall designate the portions of the work that require special inspection and the name or names of the individuals or firms who are to perform the special inspections, and indicate the duties of the special inspectors. Special inspectors shall be employed by the owner, the architect or engineer responsible for the design, or an agent of the owner, but NOT by the contractor or any other person responsible for the work. The special inspections for installation and verifications for steel construction, concrete and Sprayed fire-resistant construction shall be as required by this section and Tables 1705.2 and 1705.14.
Should structural detailing for new window openings still required to be submitted as a deferred submittal, provide a narrative and when we expect to have these submitted. Fire protection details may also be included as required. Deferred items shall not be installed until the delegated or deferred submittal documents have been reviewed and approved by the A/E of Record and reviewed and approved by RCRBD. While the SEAD letter provides an outline of work to be done, the first phase may not include any item that reduces structural integrity nor fire protection.
|
|||
This is the only document that I can approve is the SEAD Phased Approach Request letter as the rest are marked not for construction. | |||
GIS Land Development Review | Approved | 04/03/2023 | 04/04/2023 |
Colten Yoast
|
|||
Fire Code Review | Approved | 04/03/2023 | 04/03/2023 |
Nick Kuchulis
|
|||
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms | |||
Planning Review | Approved | 04/03/2023 | 04/03/2023 |
Kelly Douglas, AICP
|
|||
Interior only. KD | |||
Building Code Review | Failed | 04/03/2023 | 03/30/2023 |
Ted Allen
|
|||
Miscellaneous
Carried Forward
04/14/2023
Routt County Regional Building Department (RCRBD) typically requires the architect or registered design professional to provide a code analysis using the 2018 International Building Code. Chapter 6 establishes five types of construction in which each building must be categorized. Looking at the allowable materials used, the existing building comprise a Type IA Type Construction. Original plans will show differences between concrete bearing walls and concrete frames that are typically associated with large spandrels required at windows. For this reason, documents submitted to the building official must be of sufficient detail to clearly show the project in its entirety with emphasis on the following:
1. Life safety
2. Means of egress
3. Barrier free accessibility
4. Structural integrity
5. Building code compliance
6. Definition of scope of work
Cover Sheet
1. Project identification
2. Project address and a location map
3. All licensed architects and engineers identified
4. The licensed architect or engineer in responsible control (the professional responsible for project coordination) shall be identified. 5. Design Criteria list:
I. Occupancy group
II. Type Construction classification
III. Location of property
IV. Seismic risk
V. Design loads
Please update concept drawings with this information, signed and sealed in accordance with Colorado State Law and include set of existing plans in electronic file for our records.
Should structural detailing for new window openings still required to be submitted as a deferred submittal, provide a narrative and when we expect to have these submitted. Fire protection details may also be included as required. Deferred items shall not be installed until the delegated or deferred submittal documents have been reviewed and approved by the A/E of Record and reviewed and approved by RCRBD.
|
|||
Construction Site Management Review | Approved | 04/03/2023 | 03/28/2023 |
Scott Slamal
|
|||
Finance Department Review | Approved | 04/03/2023 | 03/27/2023 |
Sondra Spratta
|
|||
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Framing Inspection | Partial Pass | 5/17/2023 | 5/17/2023 | 05/17/2023 |
Jeff Yeiser | ||||
Framing Inspection | Passed | 6/16/2023 | 6/16/2023 | 06/16/2023 |
Ron Norton | ||||
Insulation Inspection | Passed | 6/16/2023 | 6/16/2023 | 06/16/2023 |
Ron Norton | ||||
Building Final Inspection | Passed | 6/28/2023 | 6/28/2023 | 06/28/2023 |
Todd Carr |
Condition | Status | Category |
---|---|---|
Use Tax Reconciliation | Resolved | Prior to Issuance of CO/CC |
Finance
Use Tax Reconciliation
|
||
Miscellaneous Conditions | Open | Prior to Rough Building Wall Inspections |
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms
|
||
Final Fire Inspection Required | Open | Prior to Issuance of TCO/CO/CC |
Fire Prevention
Final Fire Alarm & Sprinkler Inspection Required
|
||
Miscellaneous Conditions | Resolved | Prior to Rough Building Wall Inspections |
Building Department
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of updated drawings with this information, signed and sealed in accordance with Colorado State Law and include set of existing plans in electronic file for our records. Please upload complete set of original Torian Plum. Submit original stamped, signed and sealed engineering drawings as deemed necessary by RCRBD (the building department).
|
||
Miscellaneous Conditions | Resolved | Prior to Drywall Inspections Scheduled |
Building Department
When special inspection is required the architect or engineer shall prepare an inspection program which shall be submitted to the building official or his authorized representative for approval prior to issuance of the building permit. The inspection program shall designate the portions of the work that require special inspection and the name or names of the individuals or firms who are to perform the special inspections, and indicate the duties of the special inspectors. Special inspectors shall be employed by the owner, the architect or engineer responsible for the design, or an agent of the owner, but NOT by the contractor or any other person responsible for the work. The special inspections for installation and verifications for steel construction, concrete and Sprayed fire-resistant construction shall be as required by this section and Tables 1705.2 and 1705.14.
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Fire Prevention
Fire never received alarm or sprinkler permits for this work. If no alarm or sprinkler work was done, Fire needs to do a walk thru to make sure that the existing alarm and sprinkler systems are still functioning properly before CC sign-off. Please call 970-871-8216 to schedule a walk thru.
|
Reference Number | Status | Type |
---|---|---|
SPRMH230483 | Closed | Mechanical |
SPREL230502 | Closed | Electrical |