Permit Application Status
B-19-731
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Fire Code Review | Approved | 08/31/2021 | 11/03/2021 |
Shannon Yaconiello
|
|||
Alarm inspection failed. Alarm contractor bought stick-on CO detectors until we can do re-inspection of the real CO detectors. 7/8/21 Ross finally had the proper tools for testing. All devices working properly. CO are battery. This is a voluntary system. The home is not willing to pay for monitoring at this time. PASSED MwM Ok for CO | |||
Building Code Review | Approved | 09/01/2021 | 09/01/2021 |
Heidi Spengler
|
|||
Approved in old software. | |||
Engineering Review | Failed | 09/03/2021 | 08/31/2021 |
Scott Slamal
|
|||
TCO extension approved to expire October 30, 2021. See conditions for CO approval | |||
External Agencies Review | Approved w/ Conditions | 05/18/2021 | |
SysAdmin
|
|||
VP legacy plan review: Atmos Energy sysadmin - Sep 24 2019 9:34AM - 2# Systems will not be allowed unless proof of an appliance requiring a MINIMUM of over 7" W.C. is provided to Atmos Energy COrp for personnel review. Meter location must be approved by an Atoms Energy Corp employee during a mandatory site visit to be scheduled after foundation is in place. Meters will not be allowed under a shedding roofline or where overhanging snow is a danger to the meter set. | |||
Planning Review | Approved w/ Conditions | 04/14/2021 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Planning sysadmin - Sep 18 2019 8:25AM - Ok. Consistent with MIA-19-06 approved plan set. sysadmin - Sep 18 2019 8:29AM - Foundation location survey required within 30 days of the Building Department approving the foundation sysadmin - May 7 2020 3:59PM - Revised planset dated 5-7-2020, with external changes limited to a chimney and a staircase off the lower deck, is approved. | |||
Legacy Permitting Review | Approved | 05/11/2020 | |
SysAdmin
|
|||
VP legacy plan review: Mt Werner Water District sysadmin - Sep 16 2019 10:33AM - Sept 16, 2019 Hi Kevin, Attached are the PIF water and sewer fees associated with the subject permit. Please stop in with a check for the amount indicated and I will sign off on the plans. Thank you. Richard sysadmin - May 11 2020 12:21PM - ASI #2 Addendum OK. Rbuccino 5-11-20 | |||
Legacy Permitting Review | Approved | 05/07/2020 | |
SysAdmin
|
|||
VP legacy plan review: Routt Building sysadmin - Sep 16 2019 8:29AM - Plan review process started sysadmin - Sep 20 2019 1:53PM - Summary emailed to Kevin, see attached. sysadmin - May 7 2020 2:31PM - 5-7-20 Addendum approved, interior floor plan changes, fireplace, and deck stairs added on exterior | |||
Engineering Review | Approved | 10/09/2019 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Engineering Dept sysadmin - Sep 19 2019 12:17PM - Revise site plan - Show driveway width and grades any retaining walls show heights - contact Thorne at 970.846.9337 sysadmin - Oct 9 2019 8:12AM - Revised site plan - approved | |||
Fire Code Review | Approved | 09/27/2019 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Fire Dept sysadmin - Sep 27 2019 1:38PM - Any fire alarm / sprinkler work requires plans and a permit to be submitted to Fire Prevention. Visit www.steamboatsprings.net | |||
External Agencies Review | Approved | 09/24/2019 | |
SysAdmin
|
|||
VP legacy plan review: YVEA sysadmin - Sep 24 2019 11:35AM - Meter and meter panels are to be located as described by YVEA. They shall not be enclosed, covered or concealed. Violation shall result in termination of service. sysadmin - Sep 24 2019 11:35AM - This approval addresses only the meter and service location. | |||
GIS Land Development Review | Approved | 09/16/2019 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Address | |||
Finance Department Review | Approved | 09/16/2019 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Finance Dept sysadmin - Sep 16 2019 10:19AM - City Finance has approved City tax & permit fees of $61,500.00 on your project. This is the City’s portion, payable to the City and submitted to the Routt County Regional Building Department. At the end of the project, City Finance requires a construction use tax reconciliation be completed prior to Finance’s final signoff. | |||
Utilities Review - City | Complete | 09/16/2019 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Water & Sewer |
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Footing Inspection | Complete | 03/23/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 04/06/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 04/10/2020 | ||
SysAdmin | ||||
Foundation Drain Inspection | Complete | 05/08/2020 | ||
SysAdmin | ||||
Plumbing Rough-in Inspection | Complete | 05/12/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 07/24/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 09/14/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 09/18/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 09/28/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Failed | 10/05/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 10/08/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 10/08/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 11/20/2020 | ||
SysAdmin | ||||
Legacy Permitting Inspection | Complete | 11/25/2020 | ||
SysAdmin | ||||
Building Final Inspection | Complete | 04/19/2021 | ||
SysAdmin | ||||
Building Final Inspection | Complete | 04/29/2021 | ||
SysAdmin | ||||
Building Final Inspection | Complete | 05/10/2021 | ||
SysAdmin |
Condition | Status | Category |
---|---|---|
Miscellaneous Conditions | Resolved | Prior to Certificate of Occupancy/Completion |
Engineering
10/30/2021
10/30/2021
As discussed, the berm on the south side of the water quality pond that was damaged during construction will need to be repaired. Once repairs are completed, an as built survey will be needed to confirm the restoration of the pond elevations and volume conform with the approved civils for the subdivision. As you mentioned Kevin using blankets may be your best bet for getting grass to grow and stabilize the bank.
If drainage from the driveway of lot 5 continues to flow into the water quality pond it will need to be approved by Engineer. A letter confirming this will be required.
The final plat shows 10’ wide receiving pervious areas (RPA) on the south and west permitters of lot 5. The note on the plat states the drainage needs to exhibit sheet flow prior to entering the RPA. Sheet flow is defined as stormwater that spreads out over a large area at a somewhat uniform depth that does not have defined channels. Berms to create level spreaders would be a suggested method to accomplish this, however, you can determine what method you choose with your landscaper.
|
||
Miscellaneous Conditions | Resolved | Prior to Issuance of CO/CC |
Fire Prevention
10/30/2021
Alarm contractor bought stick-on CO detectors until we can do re-inspection of the real CO detectors.
7/8/21 Ross finally had the proper tools for testing. All devices working properly. CO are battery. This is a voluntary system. The home is not willing to pay for monitoring at this time. PASSED MwM
|
Reference Number | Status | Type |
---|---|---|
E-20-176 | Closed | Electrical |
P-20-302 | Closed | Plumbing |
M-20-492 | Closed | Furnace |
M-20-706 | Closed | Mechanical |
E-21-280 | Closed | Electrical |