Planning Commission, 2023-06-08, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 06/08/2023 | 5:00 PM |
Pending
Approved with Conditions
|
|||
City Council, 2023-06-20, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 06/20/2023 | 5:00 PM |
Pending
Approved with Conditions
|
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Critical Improvements (List) | Resolved | Prior to Issuance of Certificate of Occupancy/Completion |
Planning Department
The following items are considered critical improvements and must be constructed and approved or provide collateral via Improvements Agreement prior to approval of a Final Plat: • Water and Sewer infrastructure • Public and Private Street infrastructure • Access drive, driveway, and parking areas • Drainage improvements • Permanent stormwater quality treatment facilities
[Emrick Soltis @ 12/13/2022 11:05 AM]; [Revised by Danny Paul @ 3/21/23]
|
||
Mineral Rights Notification Affidavit | Resolved | |
Planning Department
Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
|
||
Completion Letter (Private Improv.) | Open | Prior to Engineering Final Approval Inspection |
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be uploaded to the applicable building permit condition.
[Emrick Soltis @ 11/30/2022 12:12 PM]
|
||
Final Drainage Study prior to BP | Resolved | Prior to Issuance of Construction Permit |
Engineering
Prior to any construction permit issuance, the final signed and sealed drainage study shall be submitted.
[Emrick Soltis @ 11/30/2022 12:13 PM]
|
||
Infrastructure Before Plat | Resolved | Prior to Recording of Final Plat |
Engineering
The infrastructure shown on the Preliminary Plat shall be constructed and approved and/or accepted or surety provided prior to recording of a Final Plat.
[Emrick Soltis @ 11/30/2022 12:13 PM]
|
||
Record Drawings/CAD Files | Open | Prior to Issuance of CO/CC |
Engineering
Record Drawings/CAD Files including drainage, PWQTF(s), and sidewalks shall be submitted prior to Final Engineering Site Inspection.
[Emrick Soltis @ 11/30/2022 12:14 PM]
|
||
Draft Easements Prior to Civils | Resolved | Prior to Approval of Civil Construction Plans or Overlot Grading Plans |
Engineering
Prior to approval of Civil Construction Plans, the owner shall provide approved final draft documents to the City for the following required easements: • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Public access easements for public sidewalks which are not completely within the right-of-way.
[Emrick Soltis @ 11/30/2022 12:16 PM]
|
||
Miscellaneous Condition | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
With the future development of lot 1, the applicant shall provide postal facilities in accordance with CDC Section 602.K.
|
||
Miscellaneous Condition | Resolved | Prior to Recording of Final Plat |
Planning Department
Prior to recording the Final Plat associated with this application, the owner shall enter into and record the Tram Lot Development Agreement that has been reviewed and approved by City Staff.
|
||
Civils Required at BP | Resolved | Prior to Issuance of Construction Permit |
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/Grading Permit application for review and approval prior to the start of any construction.
|
||
Mailing Affidavit | Resolved | |
Planning Department
Submit a signed affidavit no later than eight days prior to the required public hearing or final decision date confirming the required mailed notice has been completed in accordance with Section 703.C.2.
|
||
Outstanding Fees | Resolved | |
Planning Department
06/12/2023
Outstanding fees are required to be paid.
|