Permit Application Status
TB-21-865
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
COO Review - Fire Code | Approved | 09/01/2022 | 08/25/2022 |
Shannon Yaconiello
|
|||
8/25/22 Final alarm inspection passed. Ok for CO. | |||
COO Review - Building Code | TCO Approved | 08/24/2022 | 08/24/2022 |
Heidi Spengler
|
|||
TCO approved. Please see conditions | |||
COO Review - Engineering (SF/DU) | Approved | 08/24/2022 | 08/24/2022 |
Scott Slamal
|
|||
CO approved, Final site inspection passed | |||
COO Review - Finance Department | Approved | 08/31/2022 | 08/24/2022 |
Amy Camilletti
|
|||
COO Review - Utilities - Mt. Werner | Approved | 08/17/2022 | 08/23/2022 |
Richard Buccino
|
|||
COO Review - GIS Land Development | Approved | 08/17/2022 | 08/18/2022 |
Colten Yoast
|
|||
COO Review - Building Code | TCO Approved | 08/17/2022 | 08/17/2022 |
Heidi Spengler
|
|||
TCO approved. Need blower door test. | |||
COO Review - Engineering (SF/DU) | Failed | 08/17/2022 | 08/16/2022 |
Scott Slamal
|
|||
CO failed, see conditions. | |||
COO Review - Planning | Approved | 08/17/2022 | 08/16/2022 |
Kelly Douglas, AICP
|
|||
FLC ok. KD | |||
COO Review - Fire Code | Failed | 08/17/2022 | 08/12/2022 |
Shannon Yaconiello
|
|||
Final alarm inspections must pass before TCO/CO sign-off. | |||
COO Review - Finance Department | TCO Approved | 08/17/2022 | 08/10/2022 |
Amy Camilletti
|
|||
The City of Steamboat Springs Finance department has approved a TEMPORARY CERTIFICATE (TCO/TCC) on this project. A construction use tax reconciliation is required within 90 days to be compliant with the City of Steamboat Springs Municipal Code AND before signoff for the FINAL certificate of occupancy/completion with the Routt County Building Department. This information is sent to the email listed in City View. Please forward this information to the appropriate person to get this completed timely. | |||
Building Code Review | Approved | 04/12/2022 | 04/06/2022 |
Ted Allen
|
|||
Addendum submitted 4.5.22. Attached are truss design and repair documents to be added to project documents. Last document named 1863RiverQ22-0330Rev4b.pdf is updated structural drawings to be approved and stamped please. | |||
Engineering Review | Approved | 08/27/2021 | 08/30/2021 |
Scott Slamal
|
|||
1. A drainage letter prepared by a licensed Colorado PE is required to determine whether proposed site design meets the overall intent of the master drainage study of Eagle’s Vista. 2. Site plan must show the receiving pervious area (RPA). The perimeter of the RPA will need to be delineated and flagged prior to construction to prevent any disturbance within RPA. 3. +3%/-3% driveway valley section is required 4. Grading shown on southwest corner inundating RPA shall be removed. 5. Drainage from the site needs to exhibit sheet flow prior to entering the RPA as required in the final plat. This includes all downspouts and other proposed drainage swales. Sheet flow is defined as stormwater that spreads out over a large area at a somewhat uniform depth that does not have defined channels. | |||
Construction Site Management Review | Approved | 08/30/2021 | 08/30/2021 |
Scott Slamal
|
|||
- Add note stating no grading or disturbance may occur outside the building envelop within the RPA or to the stormwater quality pond. This includes installation of wattles/silt fence. - Remove installation of wattles/silt fence from RPA. - Extend wattles/silt fence to full extent of property line along stormwater quality pond. - Relocate proposed soil stockpile to a different location away from the stormwater quality pond. | |||
Fire Code Review | Approved | 08/27/2021 | 08/26/2021 |
Shannon Yaconiello
|
|||
VP legacy plan review: Steamboat Fire Dept Full Permit - Any fire alarm / sprinkler work requires plans and a permit to be submitted to Fire Prevention. Visit www.steamboatsprings.netper M Middleton | |||
External Agencies Review | Approved | 08/24/2021 | |
Malea Michael-Ferrier
|
|||
VP legacy plan review: Atmos Energy | |||
Legacy Permitting Review | Approved w/ Conditions | 08/11/2021 | |
SysAdmin
|
|||
VP legacy plan review: Routt Building sysadmin - Aug 3 2021 3:53PM - Plan review process started sysadmin - Aug 11 2021 11:15AM - See approval letter. | |||
Legacy Permitting Review | Approved | 08/11/2021 | |
SysAdmin
|
|||
VP legacy plan review: Mt Werner Water District sysadmin - Aug 3 2021 5:15PM - Hi, Attached are the PIF Water and Sewer fees associated with the referenced permit. Please stop in our offices with the a check for the amount indicated and we will get you signed off. Note we do not accept credit card payments. Regards, Richard sysadmin - Aug 11 2021 8:25AM - PIF fees paid | |||
External Agencies Review | Approved | 08/10/2021 | |
SysAdmin
|
|||
VP legacy plan review: YVEA sysadmin - Aug 10 2021 7:28AM - Meter and meter pedestal are to be located as described by YVEA. They shall not be enclosed, covered or concealed. Violation shall result in termination of service. sysadmin - Aug 10 2021 7:28AM - This approval addresses only the meter and service location. | |||
GIS Land Development Review | Approved | 08/04/2021 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Address | |||
Planning Review | Approved w/ Conditions | 08/03/2021 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Planning sysadmin - Aug 3 2021 5:58PM - Setbacks, height, plate height, lot coverage OK. FLS required within 30 days of foundation form approval. Please upload a PDF and alert Planning. Exterior lighting shall be downcast and shielded. | |||
Finance Department Review | Approved | 08/03/2021 | |
SysAdmin
|
|||
VP legacy plan review: Steamboat Finance Dept sysadmin - Aug 3 2021 4:03PM - City of Steamboat Springs Finance has approved City permit fees of $33,762.00 on this building permit. This is the City’s portion, made payable to the City of Steamboat Springs and submitted to the Routt County Regional Building Department. At the end of the project, City of Steamboat Springs Finance requires a construction use tax reconciliation be completed to be compliant with the City of Steamboat Springs Municipal Code AND prior to signoff for the FINAL certificate of occupancy/approval with the Routt County Building Department. |
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Footing Inspection | Failed | 9/10/2021 | 09/14/2021 | |
Don Marchbanks | ||||
Footing Inspection | Partial Pass | 9/21/2021 | 9/21/2021 | 09/21/2021 |
Todd Carr | ||||
Footing Inspection | Partial Pass | 9/24/2021 | 9/24/2021 | 09/24/2021 |
Don Marchbanks | ||||
Footing Inspection | Failed | 9/29/2021 | 9/29/2021 | 09/29/2021 |
Don Marchbanks | ||||
Footing Inspection | Partial Pass | 9/30/2021 | 9/30/2021 | 09/30/2021 |
Don Marchbanks | ||||
Foundation Inspection | Passed | 10/6/2021 | 10/6/2021 | 10/06/2021 |
Don Marchbanks | ||||
Footing Inspection | Partial Pass | 10/7/2021 | 10/7/2021 | 10/07/2021 |
Don Marchbanks | ||||
Footing Inspection | Passed | 10/12/2021 | 10/12/2021 | 10/12/2021 |
Don Marchbanks | ||||
Structural Inspection | Partial Pass | 10/19/2021 | 10/19/2021 | 10/19/2021 |
Silas Ebbert | ||||
Framing Inspection | Partial Pass | 3/4/2022 | 3/4/2022 | 03/04/2022 |
Ron Norton | ||||
Framing Inspection | Partial Pass | 03/23/2022 | ||
Ron Norton | ||||
Framing Inspection | Partial Pass | 4/8/2022 | 4/8/2022 | 04/08/2022 |
Jeff Yeiser | ||||
Insulation Inspection | Partial Pass | 4/18/2022 | 4/18/2022 | 04/18/2022 |
Heidi Spengler | ||||
Framing Inspection | Passed | 4/22/2022 | 4/22/2022 | 04/22/2022 |
Silas Ebbert | ||||
Insulation Inspection | Passed | 05/02/2022 | ||
Ron Norton | ||||
Drywall Inspection | Passed | 05/02/2022 | ||
Ron Norton | ||||
Roofing Inspection | Passed | 5/2/2022 | 5/2/2022 | 05/02/2022 |
Ron Norton | ||||
Structural Inspection | Partial Pass | 6/16/2022 | 6/16/2022 | 06/16/2022 |
Ron Norton | ||||
Structural Inspection | Partial Pass | 6/20/2022 | 6/20/2022 | 06/20/2022 |
Ron Norton | ||||
Building Final Inspection | Partial Pass | 8/10/2022 | 8/10/2022 | 08/10/2022 |
Ron Norton | ||||
Final Site Inspection | Failed | 8/15/2022 | 08/15/2022 | |
Scott Slamal | ||||
Corrections:
Miscellaneous
Carried Forward
08/15/2022
Install drainage swale on back portion of lot to redirect flows to the north away from neighboring downstream property. Install silt fence at toe of disturbed soil. Be sure to trench in silt fence properly and stake.
|
||||
Building Final Inspection | Passed | 8/17/2022 | 08/17/2022 | |
Heidi Spengler | ||||
Final Site Inspection | Passed | 8/22/2022 | 8/22/2022 | 08/24/2022 |
Scott Slamal | ||||
Corrections:
Miscellaneous
Resolved
08/24/2022
Install drainage swale on back portion of lot to redirect flows to the north away from neighboring downstream property. Install silt fence at toe of disturbed soil. Be sure to trench in silt fence properly and stake.
|
Condition | Status | Category |
---|---|---|
Miscellaneous Conditions | Resolved | Prior to Issuance of CO/CC |
Fire Prevention
Approved - Any fire alarm / sprinkler work requires plans and a permit to be submitted to Fire Prevention. Visit www.steamboatsprings.net
|
||
Use Tax Reconciliation | Resolved | Prior to Issuance of CO/CC |
Finance
Use Tax Reconciliation The City of Steamboat Springs Finance department has approved a TEMPORARY CERTIFICATE (TCO/TCC) on this project. A construction use tax reconciliation is required within 90 days to be compliant with the City of Steamboat Springs Municipal Code AND before signoff for the FINAL certificate of occupancy/completion with the Routt County Building Department.
This information is sent to the email listed in City View. Please forward this information to the appropriate person to get this completed timely.
|
||
Miscellaneous Conditions | Resolved | Prior to Issuance of CO/CC |
Engineering
Receiving Pervious Area must be staked prior to construction. A preconstruction meeting is required with Scott Slamal and contractor prior to construction.
|
||
Blower Door Test Results | Resolved | Prior to Issuance of CO/CC |
Building Department
Blower Door Test Results
|
||
Final Fire Inspection Required | Open | Prior to Issuance of TCO/CO/CC |
Fire Prevention
Final alarm inspections must pass before TCO/CO sign-off.
|
||
FLC Submittal | Resolved | Prior to Issuance of TCO/CO/CC |
Planning Department
Foundation location certificate shall be provided
|
||
Miscellaneous Conditions | Resolved | Prior to Issuance of CO/CC |
Engineering
Install drainage swale on back portion of lot to redirect flows to the north away from neighboring downstream property. Install silt fence at toe of disturbed soil. Be sure to trench in silt fence properly and stake.
|
Reference Number | Status | Type |
---|---|---|
SPRPL210468 | Canceled | Plumbing |
SPRMH210469 | Closed | Mechanical |
SPRPL210472 | Closed | Plumbing |
SPREL210542 | Closed | Electrical |
SPRMH220489 | Closed | Mechanical |