Permit Application Status
SPRRN220007
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
COO Review - Building Code | Approved | 02/02/2024 | 01/26/2024 |
Heidi Spengler
|
|||
All building complete. | |||
COO Review - Finance Department | Approved | 02/01/2024 | 01/25/2024 |
Sondra Spratta
|
|||
COO Review - Finance Department | Failed | 12/12/2023 | 12/05/2023 |
Amy Camilletti
|
|||
New process. TCC failed until completion of use tax reconciliation. I [Amy Camilletti @ 12/05/2023 1:50 PM] received sign off request from RCBD 12/5/23. Extended date required to 3/31/2024 on use tax activity. | |||
COO Review - Fire Code | Approved | 05/10/2023 | 12/01/2023 |
Shannon Yaconiello
|
|||
12-1-23 Western Security has verified that the current building system can't support smoke detectors powered and supervised by the system. The 110 volt detectors and the building general alarm horn/strobes and strobes were tested and working previously so Fire is able to sign CA/CC. | |||
COO Review - Building Code | TCO Approved | 05/10/2023 | 05/10/2023 |
Heidi Spengler
|
|||
building can approve a TCO but a TCO will not be issued until the fire department approves | |||
COO Review - Building Code | Failed | 03/08/2023 | 03/08/2023 |
Heidi Spengler
|
|||
Need electrical final. TCO not approved. | |||
COO Review - Finance Department | TCO Approved | 03/08/2023 | 03/03/2023 |
Sondra Spratta
|
|||
COO Review - Fire Code | Failed | 03/08/2023 | 03/01/2023 |
Shannon Yaconiello
|
|||
FAILED 110 volt smoke detectors have been installed in the unit and are required to be smoke detectors powered and supervised by the fire alarm panel. Fire cannot sign off on occupancy until this is corrected. | |||
Utilities Review - City | Approved | 02/08/2022 | 02/01/2022 |
Amber Gregory
|
|||
Miscellaneous
Resolved
02/01/2022
tap fee assessment sent to applicant. Just need tap fees paid.
|
|||
Building Code Review | Approved | 02/01/2022 | 02/01/2022 |
Ted Allen
|
|||
Items 1-4 below have been resolved. | |||
Utilities Review - City | TCO Approved | 02/01/2022 | 01/27/2022 |
Amber Gregory
|
|||
Miscellaneous
Carried Forward
02/01/2022
tap fee assessment sent to applicant. Just need tap fees paid.
|
|||
Construction Site Management Review | Approved | 02/01/2022 | 01/26/2022 |
Scott Slamal
|
|||
Miscellaneous
Outstanding
01/25/2022
If applicable please provide a construction site management plan showing the locations of a dumpster, porta-potty, material storage, and/or use of City right -of-way. Please see contact Scott Slamal (sslamal@steamboatsprings.net) with any questions.
|
|||
Utilities Review - City | TCO Approved | 01/18/2022 | 01/18/2022 |
Amber Gregory
|
|||
Miscellaneous
Carried Forward
01/20/2022
tap fee assessment sent to applicant. Just need tap fees paid.
|
|||
Finance Department Review | Approved | 01/18/2022 | 01/14/2022 |
Amy Camilletti
|
|||
City of Steamboat Springs Finance has approved City permit fees and taxes of $15,745.00 on this building permit. This is the City’s portion, payable to the City of Steamboat Springs and submitted via the Routt County Regional Building Department or City View online portal. | |||
Building Code Review | TCO Approved | 01/18/2022 | 01/13/2022 |
Ted Allen
|
|||
Please be aware that this is not a complete plan review. These items and any subsequent review questions will need to be addressed prior to the Building Permit being issued. Please resubmit plans by way of the portal to the following items: 1. RCRBD is experiencing a problem that surfaced with the security certificate related to the architectural plans including certain structural mark-ups that prevents us from conducting plan review with our mark-ups. Please resubmit with plans that that are unsecured allow them to be marked up and stamped with the appropriate professional stamp(s) and signed in accordance with Colorado State Law. As a general rule, RCRBD requires that construction documents prepared by registered structural and architectural professionals have the seal and signature of either a licensed architect or engineer, or both as Sheet A1.0 appears redlined with structural engineering details. 2. Architectural plans have been marked “PROGRESS PRINT 6 AUGUST 21 (NOT FOR CONSTRUCTION)" and shall be updated for construction and resubmitted. 3. Please state the code(s) used. 4. Referencing the code analysis on Sheet A1.0 lists this as Residential Group R-3 occupancy. These occupancies are typically where the occupants are primarily permanent in nature and not classified as Group R-1, R-2, R-4 or I, including buildings that do not contain more than two dwelling units. The code analysis shall include the number of residential units and classification based on occupancy. | |||
Fire Code Review | Approved | 01/18/2022 | 01/12/2022 |
Nick Kuchulis
|
|||
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net, Fire and EMS Services, Fire Prevention, Downloadable Permits and Forms | |||
Planning Review | Approved | 01/18/2022 | 01/11/2022 |
Michael Fitz
|
|||
OK - per previous discussions, this use swap is OK. | |||
Construction Site Management Review | TCO Approved | 01/18/2022 | 01/11/2022 |
Scott Slamal
|
|||
Miscellaneous
Carried Forward
01/25/2022
If applicable please provide a construction site management plan showing the locations of a dumpster, porta-potty, material storage, and/or use of City right -of-way. Please contact Scott Slamal (sslamal@steamboatsprings.net) with any questions.
|
|||
GIS Land Development Review | Approved | 01/18/2022 | 01/11/2022 |
Malea Michael-Ferrier
|
|||
Approved by RCRBD |
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Framing Inspection | Partial Pass | 2/28/2022 | 2/28/2022 | 02/28/2022 |
Ron Norton | ||||
Framing Inspection | Partial Pass | 7/22/2022 | 7/22/2022 | 07/22/2022 |
Ron Norton | ||||
Insulation Inspection | Partial Pass | 8/17/2022 | 8/17/2022 | 08/17/2022 |
Ron Norton | ||||
Insulation Inspection | Passed | 8/18/2022 | 8/18/2022 | 08/18/2022 |
Jeff Yeiser | ||||
Drywall Inspection | Passed | 8/30/2022 | 8/30/2022 | 08/30/2022 |
Ron Norton | ||||
Interim Construction Site Management | Partial Pass | 11/15/2022 | 11/16/2022 | 11/18/2022 |
Scott Slamal | ||||
Building Final Inspection | Partial Pass | 3/1/2023 | 3/1/2023 | 03/01/2023 |
Ron Norton | ||||
Building Final Inspection | Partial Pass | 3/2/2023 | 3/2/2023 | 03/02/2023 |
Ron Norton | ||||
Building Final Inspection | Partial Pass | 5/3/2023 | 5/3/2023 | 05/03/2023 |
Todd Carr | ||||
Building Final Inspection | Passed | 1/26/2024 | 1/26/2024 | 01/26/2024 |
Ron Norton |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Miscellaneous Conditions | Resolved | Fire Prevention | Prior to Rough Building Wall Inspections | ||
:
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net, Fire and EMS Services, Fire Prevention, Downloadable Permits and Forms
|
|||||
Miscellaneous Conditions | Resolved | Fire Prevention | Prior to Issuance of TCO/CO/CC | ||
:
Final alarm and sprinkler inspections must pass before CC sign-off.
|
|||||
Use Tax Reconciliation | Resolved | Finance | Prior to Issuance of CO/CC | ||
:
Use Tax Reconciliation
|
|||||
Final Fire Inspection Required | Resolved | Fire Prevention | Prior to Issuance of TCO/CO/CC | ||
:
Final Fire Alarm inspection failed. 110 volt smoke detectors have been installed in the unit and are required to be smoke detectors powered and supervised by the fire alarm panel. Fire cannot sign off on occupancy until this is corrected.
|
|||||
Building Department Conditions to be Completed | Resolved | Building Department | Prior to Issuance of CO/CC | ||
:
Building Department Conditions to be Completed:
1-Complete deck which is currently blocked off
2-Completed owner controls for air handling.
|
|||||
Building Department Conditions to be Completed | Resolved | Building Department | Prior to Issuance of TCO/CO/CC | ||
:
Must pass Final Electrical Inspection to get a TCO
|
Reference Number | Status | Type |
---|---|---|
SPRPL220628 | Closed | Plumbing |
SPREL220848 | Closed | Electrical |
SPRMH221165 | Closed | Mechanical |