Summary

PL20210105
Base Area Plaza Improvements - Building B
Development Plan
Development Plan - Public Hearing
Withdrawn
11/05/2021
GONDOLA SQUARE CONDOS
Construction of a new 3 story retail building within the Steamboat Base Village area.

Locations

Property
211077001

Address
2305 MT WERNER CIR

Application Types

Development Plan - Public Hearing

Planning Commission
Withdrawn

Hearings

There are no hearings for this planning application.

Inspections

There are no inspections for this planning application, or you are not authorized to view them.

Conditions

Condition Status Category
Site Posting Affidavit Resolved Prior to Final Review
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
Miscellaneous Condition Resolved Prior to Issuance of Construction Permit
Engineering
Prior to issuance of a construction permit, the applicant shall provide a Final Draft to the City of the Steamboat Comprehensive Transportation Impact Analysis by McDowell Engineering that adequately address City Engineering review comments (from the first round of the Wild Blue Gondola Development Plan review comments), to the satisfaction of the City Engineer.
Miscellaneous Condition Open Prior to Issuance of Construction Permit
Engineering
The applicant shall enter into an agreement, acceptable to the City, to identify contribution and timing (or a timeline for determination) for the identified mitigation strategies included in the Steamboat Comprehensive Transportation Impact Analysis which may include but is not limited to the following items. The agreement shall be recorded at the Routt County Clerk and Recorder prior to issuance of a construction permit. a. Improvements to GTC to serve necessary hourly service arrivals b. Transit service operational expansion c. Improvement to Mount Werner/Mount Werner intersection d. Parking Management way finding, ITS, and operational improvements implementation e. High Speed Gondola from Meadows Parking lot to replace shuttle operation f. Apres Ski Way/Mount Werner intersection g. JD Hays/US40 intersection h. Pine Grove/Mount Werner intersection i. Pedestrian improvements to the base area j. Bicycle improvements to the base area
Miscellaneous Condition Open Prior to Issuance of Construction Permit
Engineering
Prior to start of any construction, Civil Construction Plans prepared/signed/sealed by a licensed Colorado civil engineer are required to be submitted to Routt County Regional Building Department with a building permit application.
Completion Letter (Private Improv.) Open Prior to Engineering Final Approval Inspection
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
Third Party Certification (Base Area) Open Prior to Certificate of Occupancy/Completion
Planning Department
CDC Section 440 (Base Area Design Standards) requires all buildings in the Base Area to comply with third-party certification of building materials and construction techniques that are consistent with a nationally recognized sustainable building program or alternative approved by the Director of Planning and Community Development. Prior to issuance of a Building Permit, the owner shall provide documentation to the City about the proposed program the project will comply with. Prior to Certificate of Occupancy/Completion, the owner shall provide the City with proof of completion of the chosen sustainable building program.

Related Permit & Planning Applications

There are no related items for this planning application.

Documents & Images

Date Uploaded File Type Name
Letter NOTICE OF COMPLETE APPLICATION.PDF
Letter NOTICE OF COMPLETE APPLICATION.PDF
11/05/2021 Form PS21-0174_Building B_Fire Flow Availability
11/05/2021 Form PS21-0174_Building B_Fire Flow Demand
11/08/2021 Receipt Receipt for transaction:2021-000467
11/11/2021 Affidavit Affidavit PL20210105 SSRC signed 11.11.21 (Sign Affidavit)
01/05/2022 Letter DRT Review Comments (Generate/Send DRT Review Comments Notice)
01/05/2022 Letter DRT Review Comments (Generate/Send DRT Review Comments Notice)
01/05/2022 Letter PS21-0174_Building B_Proof of Ownership (Received)
01/05/2022 Other PS21-0174_Building B_Submital Requirements SSRC signed 11_2_21 (Received)
01/05/2022 Narrative PS21-0174_Building B_Project Narrative (Received)
01/05/2022 Plans PS21-0174_Building B_Drawings 01 Cover Sheet (Received)
01/05/2022 Plans PS21-0174_Building B_Drawings 02 Civil and Surveying (Received)
01/05/2022 Plans PS21-0174_Building B_Drawings 04 Site Plan (Received)
01/05/2022 Plans PS21-0174_Building B_Grading Drainage and Utility Plan0 (Received)
01/05/2022 Plans PS21-0174_Building B_Grading Drainage and Utility Plan (Received)
01/05/2022 Plans PS21-0174_Building B_Drawings 05 Arch (Received)
01/05/2022 Plans PS21-0174_Building B_Drawings 03 Landscape (Received)
01/05/2022 Plans PS21-0174_Building B_Drawings 06 Lighting (Received)
01/05/2022 Study PS21-0174_Building B_Drainage Study (Received)
01/05/2022 Study PS21-0174_Building B_Geotechnical Report (Received)
01/05/2022 Study PS21-0174_Building B_Traffic Memo (Received)
01/05/2022 Study PS21-0174_Building B_Water Demand Report Waiver (Received)
01/05/2022 Narrative PS21-0174_Building B_Fire Code Analysis (Received)
05/23/2022 Study 2022-04-04 M1529 Steamboat Resort TIS - FINAL Signed