Planning Application Status
PL20220061
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
There are no hearings for this planning application.
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Miscellaneous Condition | Open | Prior to Issuance of Construction Permit |
Engineering
Provide Final Drainage Study signed & sealed by a Colorado PE.
|
||
Miscellaneous Condition | Open | |
Planning Department
See Public Works and Planning Informational Comments in Documents and Images.
|
||
Wetland Permit prior to Civils | Resolved | Prior to Approval of Civil Construction Plans or Overlot Grading Plans |
Planning Department
Prior to approval of Civil Construction Plans, an approved Army Corp of Engineers permit for modifications to the wetlands/waters of the state shall be submitted to the City.
|
||
Floodplain Development Permit | Open | Prior to Issuance of Construction Permit |
Planning Department
Prior to Building Permit or Grade and Fill Permit issuance, the owner shall receive approval of a Floodplain Development Permit.
|
||
Draft Easements Prior to Civils | Open | Prior to Approval of Civil Construction Plans or Overlot Grading Plans |
Planning Department
Prior to approval of Civil Construction Plans or Overlot Grading Plans, the owner shall provide approved final draft documents to the City for the following required easements: • Drainage easements to accommodate offsite drainage through the project site. • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Sidewalk and/or trail easements for public use sidewalks/trails. • Public access easements for public sidewalks which are not completely within the right-of-way. • Cross access easement per West/East Steamboat Springs US Highway 40 Access Study. • Water and sewer easements.
Draft maintenance agreement for the trail shall be provided at the same time as easements are provided.
|
||
Executed Easements Prior to BP/GF | Open | Prior to Issuance of Construction Permit |
Planning Department
The owner shall provide the following recorded easements prior to issuance of a construction permit (Grade and Fill, Building): • Drainage easements to accommodate offsite drainage through the project site. • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Sidewalk and/or trail easements for public use sidewalks/trails. • Public access easements for public sidewalks which are not completely within the right-of-way. • Cross access easement per West/East Steamboat Springs US Highway 40 Access Plan. • Water and sewer easements with copies of recorded instruments for the City and Mount Werner Water District.
An executed, recorded maintenance agreement for the trail shall be provided at the same time as executed easements,
|
||
Civils Required | Open | Prior to Issuance of Construction Permit |
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/ Grading Permit application for review and approval prior to the start of any construction.
|
||
PWQ O&M prior to final approval | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a recorded Ownership & Maintenance Agreement shall be submitted.
|
||
Completion Letter (Private Improv.) | Open | Prior to Engineering Final Approval Inspection |
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
|
||
Completion Letter (PSWQTF) | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
|
||
Record Drawings/CAD Files | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Record Drawings/CAD Files shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection
|
||
Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
Engineering
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first: • Private Street infrastructure • Access drive, driveway, and parking areas • Drainage improvements • Permanent storm water quality treatment facilities • Sidewalk improvements
|
||
PWQ O&M prior to CO/CAC | Open | Prior to Issuance of CO/CC |
Engineering
Prior to Certificate of Occupancy/Completion, an Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
|
||
Miscellaneous Condition | Open | Prior to Issuance of Construction Permit |
GIS
Property is not addressed. Addressing should be requested before construction is started for emergency services.
|
||
Miscellaneous Condition | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
Snow storage for this development is not included, shown or approved with this development plan. Snow storage can be accommodated on the vacant property. When the property develops, the future development will need to include snow storage areas for the road and the trail.
|
||
Miscellaneous Condition | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
Critical improvements and phasing shall be consistent with projects PL20220123 and PL20220062.
|
||
Development Agreement | Open | Prior to Final Review |
Planning Department
The owner shall enter into and record a Development Agreement regarding timing and phasing of road improvements.
|
||
Payment of Fees | Open | Prior to Final Review |
Planning Department
The owner shall pay a $1750 application fee for an Administrative Development Plan. Payment of $1750 shall be submitted to the City prior to final review of the project.
|
||
Miscellaneous Condition | Open | Prior to Approval of Civil Construction Plans or Overlot Grading Plans |
Planning Department
An approved substantial conformance application or new development plan (if applicable) for Lot 5, Indian Meadows (Storm Peak Apartments) is required prior to approval of Civil Construction Drawings or issuance of a Grade and Fill or Construction permit.
|
There are no related items for this planning application.