| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| Construction Stormwater Review | Approved | 05/14/2024 | 05/13/2024 |
| Construction Stormwater Review | Failed | 05/14/2024 | 05/06/2024 |
| Construction Stormwater Review | Failed | 05/14/2024 | 04/29/2024 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Interim Construction Stormwater | Pending | |||
| Scott Slamal | ||||
| Final Construction Stormwater | Pending | |||
| Scott Slamal | ||||
| 45 Day Inspection | Pending | 5/3/2026 | ||
| Scott Slamal | ||||
|
Corrections:
Trash
Outstanding
03/16/2026
Trash must be picked up throughout site in the snow storage piles in detention ponds, and on the south and west side of the hotel.
|
||||
|
Perimeter Control Measures
Outstanding
03/16/2026
Sediment barriers must be installed at the edge of pavement at the north detention pond where erosion had occurred on the slope of the pond.
|
||||
|
Inlet Protection
Outstanding
03/16/2026
Inlet protection measures were damaged and must be replaced along Central Park Dr., Snap Dragon, and within the hotel parking lot.
|
||||
|
Sediment Discharges
Outstanding
03/16/2026
Heavy sediment accumulation in the curb line along Snap Dragon needs to be cleaned out and the inlet protection replaced.
|
||||
|
Temporary soil stabilization
Outstanding
03/16/2026
The damaged erosion control blankets on the south side of the hotel need to be maintained or reinstalled.
|
||||
|
Sediment Discharges
Outstanding
03/16/2026
The hose placed at the storm inlet adjacent to the foundation for the grills/pool used to dewater the foundation is an illicit discharge violation and must be removed.
|
||||
|
Perimeter Control Measures
Outstanding
03/16/2026
Perimeter control measures must be installed around the soil stock pile at the northeast corner of the property.
|
||||
|
Material Spills and Leaks
Outstanding
03/16/2026
Materials from drywall and mortar mixing were noted on the ground and need to be cleaned up immediately.
|
||||
|
Perimeter Control Measures
Outstanding
03/16/2026
The straw wattle check dams in the north swale on the property line need to be replaced immediately.
|
||||
| 45 Day Inspection | Pending | 5/5/2026 | ||
| Scott Slamal | ||||
| 45 Day Inspection | Not Ready | 6/27/2024 | 06/24/2024 | |
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 7/12/2024 | 07/12/2024 | |
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 8/21/2024 | 08/26/2024 | |
| Scott Slamal | ||||
| 45 Day Inspection | Failed | 11/18/2024 | 10/04/2024 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
10/04/2024
Cleanup, spilled cement wash out as noted during inspection.
|
||||
|
Miscellaneous
Carried Forward
10/04/2024
Continue keeping up with sweeping Central Park dr.
|
||||
| 45 Day Inspection | Failed | 12/8/2024 | 10/24/2024 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
10/24/2024
Cleanup, spilled cement wash out as noted during inspection.
|
||||
|
Miscellaneous
Carried Forward
10/24/2024
Continue keeping up with sweeping Central Park dr.
|
||||
| 45 Day Inspection | Failed | 5/16/2025 | 04/01/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
04/01/2025
Anchor Porta potty.
|
||||
|
Miscellaneous
Carried Forward
04/01/2025
Reinstall inlet filter fabric at corner of Snapdragon and Central Park.
|
||||
|
Miscellaneous
Carried Forward
04/01/2025
Continue to pick up trash as needed.
|
||||
| 45 Day Inspection | Failed | 6/21/2025 | 05/07/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
05/07/2025
Further install erosion control blankets at Northwest sediment basin.
|
||||
|
Miscellaneous
Carried Forward
05/07/2025
Install aggregate material at corner of entrance to prevent tracking.
|
||||
|
Miscellaneous
Carried Forward
05/07/2025
Continue to pick up trash as needed.
|
||||
| 45 Day Inspection | Failed | 8/9/2025 | 06/25/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Resolved
06/25/2025
Further install erosion control blankets at Northwest sediment basin.
|
||||
|
Miscellaneous
Resolved
06/25/2025
Install aggregate material at corner of entrance to prevent tracking.
|
||||
|
Miscellaneous
Carried Forward
06/25/2025
Continue to pick up trash as needed.
|
||||
| 45 Day Inspection | Failed | 9/19/2025 | 08/05/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
08/05/2025
Continue to pick up trash as needed.
|
||||
|
Miscellaneous
Carried Forward
08/05/2025
The Eco concrete washout pan was more than three quarters full and need to be emptied.
|
||||
|
Miscellaneous
Carried Forward
08/05/2025
Sediment controls were needed at each of the stormwater pond outlets.
|
||||
|
Miscellaneous
Carried Forward
08/05/2025
Rock socks or other measures were needed to contain the soil pile at Snap Dragon and Central Park Dr.
|
||||
| 45 Day Inspection | Failed | 11/8/2025 | 09/23/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
09/24/2025
Some trash was noted and needs to be picked up daily and disposed of properly.
|
||||
|
Miscellaneous
Carried Forward
09/24/2025
Control measures were not adequate to prevent sediment discharges from the site. Significant erosion was noted on the slopes of both stormwater facilities and sediment controls were not installed at each of the stormwater facility outlets.
|
||||
|
Miscellaneous
Carried Forward
09/24/2025
The silt fence at the northern stormwater facility was down and needing to be replaced.
|
||||
|
Miscellaneous
Carried Forward
09/24/2025
Sediment control measures were not installed behind the containers of the south stormwater facility where significant erosion was occurring.
|
||||
|
Miscellaneous
Carried Forward
09/24/2025
Concrete waste was noted on the ground in the north stormwater facility with no containment.
|
||||
|
Miscellaneous
Carried Forward
09/24/2025
The straw wattle below the silt fence at the north corner of the site needs to be mucked out or replaced.
|
||||
| Interim Construction Stormwater | Failed | 10/3/2025 | 10/07/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
10/07/2025
Install inlet protection at the southwest inlet at Snapdragon Wy and Central Park Dr.
|
||||
|
Miscellaneous
Carried Forward
10/07/2025
Continue to pick up trash daily.
|
||||
|
Miscellaneous
Carried Forward
10/07/2025
Install vehicle tracking controls at the south boundary where vehicles/equipment are accessing the site.
|
||||
|
Miscellaneous
Carried Forward
10/07/2025
Install straw wattles in south detention pond along concrete trickle channel.
|
||||
| 45 Day Inspection | Failed | 12/21/2025 | 11/04/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
11/06/2025
Control measures were not installed at the south stormwater facility outlet or along the edge of the trickle channel to prevent sediment discharges from the site.
A Notice of Violation was sent on September 24, 2025 for the same violation where sediment was actively discharging from both stormwater facilities. The next significant stormwater management violation as determined by the city stormwater inspector will result in a Summons into the City of Steamboat Springs Municipal Court and criminal penalties as set forth in Section 1-15 of the Municipal Code.
A person convicted of a violation is subject to potential penalties not to exceed $2,650.00 per offense. Each day the violation continues is a separate offense.
|
||||
|
Miscellaneous
Carried Forward
11/06/2025
Trash was observed in locations around the site and must be picked up daily.
|
||||
|
Miscellaneous
Carried Forward
11/06/2025
Sediment controls were not installed around stockpiles on Snapdragon Wy or at the stockpile located at the northeast corner of the site.
|
||||
|
Miscellaneous
Carried Forward
11/06/2025
The dirt accumulation on Pinegrove Rd along the east boundary needs to be swept and removed.
|
||||
| 45 Day Inspection | Partial Pass | 12/18/2025 | 12/17/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
12/17/2025
Control measures were not installed at the south stormwater facility outlet or along the edge of the trickle channel to prevent sediment discharges from the site.
A Notice of Violation was sent on September 24, 2025 for the same violation where sediment was actively discharging from both stormwater facilities. The next significant stormwater management violation as determined by the city stormwater inspector will result in a Summons into the City of Steamboat Springs Municipal Court and criminal penalties as set forth in Section 1-15 of the Municipal Code.
A person convicted of a violation is subject to potential penalties not to exceed $2,650.00 per offense. Each day the violation continues is a separate offense.
|
||||
|
Miscellaneous
Carried Forward
12/17/2025
Trash was observed in locations around the site and must be picked up daily.
|
||||
|
Miscellaneous
Carried Forward
12/17/2025
Sediment controls were not installed around stockpiles on Snapdragon Wy or at the stockpile located at the northeast corner of the site.
|
||||
|
Miscellaneous
Carried Forward
12/17/2025
The dirt accumulation on Pinegrove Rd along the east boundary needs to be swept and removed.
|
||||
| 45 Day Inspection | Failed | 1/31/2026 | 02/04/2026 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Resolved
02/05/2026
Control measures were not installed at the south stormwater facility outlet or along the edge of the trickle channel to prevent sediment discharges from the site.
A Notice of Violation was sent on September 24, 2025 for the same violation where sediment was actively discharging from both stormwater facilities. The next significant stormwater management violation as determined by the city stormwater inspector will result in a Summons into the City of Steamboat Springs Municipal Court and criminal penalties as set forth in Section 1-15 of the Municipal Code.
A person convicted of a violation is subject to potential penalties not to exceed $2,650.00 per offense. Each day the violation continues is a separate offense.
|
||||
|
Miscellaneous
Resolved
02/05/2026
Trash was observed in locations around the site and must be picked up daily.
|
||||
|
Miscellaneous
Resolved
02/05/2026
Sediment controls were not installed around stockpiles on Snapdragon Wy or at the stockpile located at the northeast corner of the site.
|
||||
|
Miscellaneous
Resolved
02/05/2026
The dirt accumulation on Pinegrove Rd along the east boundary needs to be swept and removed.
|
||||
|
Miscellaneous
Carried Forward
02/05/2026
Pickup up building material trash from snow storage piles and around the roll off dumpsters.
|
||||
| 45 Day Inspection | Failed | 4/30/2026 | 03/13/2026 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Resolved
03/16/2026
Pickup up building material trash from snow storage piles and around the roll off dumpsters.
|
||||
|
Trash
Carried Forward
03/16/2026
Trash must be picked up throughout site in the snow storage piles in detention ponds, and on the south and west side of the hotel.
|
||||
|
Perimeter Control Measures
Carried Forward
03/16/2026
Sediment barriers must be installed at the edge of pavement at the north detention pond where erosion had occurred on the slope of the pond.
|
||||
|
Inlet Protection
Carried Forward
03/16/2026
Inlet protection measures were damaged and must be replaced along Central Park Dr., Snap Dragon, and within the hotel parking lot.
|
||||
|
Sediment Discharges
Carried Forward
03/16/2026
Heavy sediment accumulation in the curb line along Snap Dragon needs to be cleaned out and the inlet protection replaced.
|
||||
|
Temporary soil stabilization
Carried Forward
03/16/2026
The damaged erosion control blankets on the south side of the hotel need to be maintained or reinstalled.
|
||||
|
Sediment Discharges
Carried Forward
03/16/2026
The hose placed at the storm inlet adjacent to the foundation for the grills/pool used to dewater the foundation is an illicit discharge violation and must be removed.
|
||||
|
Perimeter Control Measures
Carried Forward
03/16/2026
Perimeter control measures must be installed around the soil stock pile at the northeast corner of the property.
|
||||
|
Material Spills and Leaks
Carried Forward
03/16/2026
Materials from drywall and mortar mixing were noted on the ground and need to be cleaned up immediately.
|
||||
|
Perimeter Control Measures
Carried Forward
03/16/2026
The straw wattle check dams in the north swale on the property line need to be replaced immediately.
|
||||
| Interim Construction Stormwater | Failed | 3/24/2026 | 3/24/2026 | 03/26/2026 |
| Scott Slamal | ||||
|
Corrections:
Perimeter Control Measures
Carried Forward
03/26/2026
1. Additional sediment barriers must be installed at the edge of pavement at the north detention pond where erosion is occurring on the slope of the pond.
2. Wattles were not installed per specifications.
3. Additional rocks needed at both outlet structures to prevent sediment discharging.
4. Sediment needs to be removed from the concrete trickle channels in both detention ponds.
5. Spill clean up material were needing to be applied with fuel spills were noted at the portable fuel tank.
|
||||
There are no conditions for this engineering permit application, or you are not authorized to view them.
There are no related items for this engineering permit application.
| Date Uploaded | File Type | Name |
|---|---|---|
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT0.PDF | |
| Report | INSPECTION REPORT1.PDF | |
| Report | INSPECTION REPORT2.PDF | |
| Report | INSPECTION REPORT3.PDF | |
| Report | INSPECTION REPORT4.PDF | |
| Report | INSPECTION REPORT5.PDF | |
| Report | INSPECTION REPORT6.PDF | |
| Report | INSPECTION REPORT7.PDF | |
| Permit | PERMIT - DETAILED CONSTRUCTION STORMWATER.PDF | |
| 04/29/2024 | Letter | Permit Review Corrections Notice (Generate/Send Correction Notice) |
| 05/06/2024 | Letter | Permit Review Corrections Notice (Generate/Send Correction Notice) |
| 07/12/2024 | IMG_0212 | |
| 07/12/2024 | IMG_0218 | |
| 07/12/2024 | IMG_0213 | |
| 07/12/2024 | IMG_0215 | |
| 07/12/2024 | IMG_0216 | |
| 07/12/2024 | IMG_0217 | |
| 08/26/2024 | IMG_0385 | |
| 08/26/2024 | IMG_0382 | |
| 08/26/2024 | IMG_0388 | |
| 08/26/2024 | IMG_0387 | |
| 08/26/2024 | IMG_0384 | |
| 08/26/2024 | IMG_0383 | |
| 08/26/2024 | IMG_0386 | |
| 10/04/2024 | IMG_0686 | |
| 10/04/2024 | IMG_0685 | |
| 10/04/2024 | IMG_0689 | |
| 10/04/2024 | IMG_0687 | |
| 10/04/2024 | IMG_0684 | |
| 10/24/2024 | NOV tracking | |
| 10/24/2024 | NOV tracking 0 | |
| 10/24/2024 | NOV tracking 1 | |
| 12/02/2024 | Photograph | Tracking 11/22/24 |
| 04/01/2025 | IMG_0999 | |
| 04/01/2025 | IMG_0996 | |
| 04/01/2025 | IMG_1003 | |
| 04/01/2025 | IMG_0997 | |
| 04/01/2025 | IMG_0998 | |
| 04/01/2025 | IMG_1004 | |
| 04/01/2025 | IMG_1001 | |
| 05/07/2025 | IMG_1319 | |
| 05/07/2025 | IMG_1314 | |
| 05/07/2025 | IMG_1315 | |
| 05/07/2025 | IMG_1313 | |
| 05/07/2025 | IMG_1312 | |
| 05/07/2025 | IMG_1317 | |
| 05/07/2025 | IMG_1316 | |
| 05/07/2025 | IMG_1318 | |
| 05/07/2025 | IMG_1310 | |
| 05/07/2025 | IMG_1311 | |
| 05/07/2025 | IMG_1309 | |
| 06/25/2025 | IMG_1537 | |
| 06/25/2025 | IMG_1539 | |
| 06/25/2025 | IMG_1538 | |
| 06/25/2025 | IMG_1540 | |
| 06/25/2025 | IMG_1542 | |
| 06/25/2025 | IMG_1544 | |
| 08/05/2025 | IMG_1704 | |
| 08/05/2025 | IMG_1714 | |
| 08/05/2025 | IMG_1705 | |
| 08/05/2025 | IMG_1707 | |
| 08/05/2025 | IMG_1710 | |
| 08/05/2025 | IMG_1715 | |
| 08/05/2025 | IMG_1716 | |
| 08/05/2025 | IMG_1706 | |
| 08/05/2025 | IMG_1711 | |
| 08/05/2025 | IMG_1708 | |
| 08/05/2025 | IMG_1713 | |
| 09/23/2025 | IMG_1913 | |
| 09/23/2025 | IMG_1912 | |
| 09/23/2025 | IMG_1914 | |
| 09/23/2025 | IMG_1911 | |
| 09/23/2025 | IMG_1910 | |
| 09/23/2025 | IMG_1909 | |
| 09/23/2025 | IMG_1907 | |
| 09/23/2025 | IMG_1905 | |
| 09/23/2025 | IMG_1915 | |
| 10/07/2025 | IMG_2010 | |
| 10/07/2025 | IMG_2001 | |
| 10/07/2025 | IMG_2002 | |
| 10/07/2025 | IMG_2008 | |
| 10/07/2025 | IMG_2007 | |
| 10/07/2025 | IMG_2006 | |
| 10/07/2025 | IMG_2005 | |
| 10/07/2025 | IMG_2004 | |
| 10/07/2025 | IMG_1999 | |
| 10/07/2025 | IMG_2009 | |
| 10/07/2025 | IMG_2003 | |
| 11/06/2025 | IMG_2226 | |
| 11/06/2025 | IMG_2240 | |
| 11/06/2025 | IMG_2228 | |
| 11/06/2025 | IMG_2237 | |
| 11/06/2025 | IMG_2238 | |
| 11/06/2025 | IMG_2243 | |
| 11/06/2025 | IMG_2229 | |
| 11/06/2025 | IMG_2234 | |
| 11/06/2025 | IMG_2233 | |
| 11/06/2025 | IMG_2232 | |
| 11/06/2025 | IMG_2235 | |
| 11/06/2025 | IMG_2242 | |
| 11/06/2025 | IMG_2227 | |
| 11/06/2025 | IMG_2231 | |
| 11/06/2025 | IMG_2230 | |
| 11/06/2025 | IMG_2236 | |
| 11/06/2025 | IMG_2241 | |
| 03/16/2026 | IMG_2436 | |
| 03/16/2026 | IMG_2435 | |
| 03/16/2026 | IMG_2434 | |
| 03/16/2026 | IMG_2437 | |
| 03/16/2026 | IMG_2432 | |
| 03/16/2026 | IMG_2419 | |
| 03/16/2026 | IMG_2433 | |
| 03/16/2026 | IMG_2403 | |
| 03/16/2026 | IMG_2428 | |
| 03/16/2026 | IMG_2431 | |
| 03/16/2026 | IMG_2425 | |
| 03/16/2026 | IMG_2415 | |
| 03/16/2026 | IMG_2412 | |
| 03/16/2026 | IMG_2408 | |
| 03/16/2026 | IMG_2429 | |
| 03/16/2026 | IMG_2427 | |
| 03/16/2026 | IMG_2424 | |
| 03/16/2026 | IMG_2423 | |
| 03/16/2026 | IMG_2421 | |
| 03/16/2026 | IMG_2417 | |
| 03/16/2026 | IMG_2406 | |
| 03/16/2026 | IMG_2407 | |
| 03/16/2026 | IMG_2426 | |
| 03/16/2026 | IMG_2422 | |
| 03/16/2026 | IMG_2420 | |
| 03/16/2026 | IMG_2416 | |
| 03/16/2026 | IMG_2414 | |
| 03/16/2026 | IMG_2413 | |
| 03/16/2026 | IMG_2411 | |
| 03/16/2026 | IMG_2410 | |
| 03/16/2026 | IMG_2409 | |
| 03/16/2026 | IMG_2404 | |
| 03/16/2026 | IMG_2401 | |
| 03/16/2026 | IMG_2430 | |
| 03/16/2026 | IMG_2405 | |
| 03/26/2026 | IMG_2514 | |
| 03/26/2026 | IMG_2512 | |
| 03/26/2026 | IMG_2509 | |
| 03/26/2026 | IMG_2508 | |
| 03/26/2026 | IMG_2518 | |
| 03/26/2026 | IMG_2517 | |
| 03/26/2026 | IMG_2515 | |
| 03/26/2026 | IMG_2513 | |
| 03/26/2026 | IMG_2511 | |
| 03/26/2026 | IMG_2510 | |
| 03/26/2026 | IMG_2516 |
Powered by CityView