Summary

SPRRN241466
Alteration
Permit(s) Issued
RIVERFRONT PROPERTIES LLC
Alteration
R-2 - Residential, multiple family
B - Business
S-2 - Storage, low hazard
U - Utility, miscellaneous
Interior tenant finish unit 2 Riverfront Park, project will create a new residential dwelling unit on level 2 that was originally constructed without a permit in the past, and re-configuration of space in commerical space on level 1 as well.
09/23/2024
11/21/2024
04/01/2026

Locations

Permits

Permit Number: SPRRN241466-BD1

Building
Issued

Reviews

Review Type Outcome Est. Completion Date Completed
COO Review - Planning TCO Approved 11/03/2025 10/27/2025
COO Review - Building Code Approved 07/30/2025 07/23/2025
COO Review - Finance Department Approved 07/29/2025 07/22/2025
COO Review - Building Code Failed 05/23/2025 05/23/2025
COO Review - Planning Failed 04/02/2025 04/22/2025
COO Review - Fire Code Approved 04/02/2025 04/03/2025
COO Review - GIS Land Development Approved 04/02/2025 04/03/2025
COO Review - Building Code Failed 04/02/2025 04/02/2025
Building Code Review Approved 03/14/2025
GIS Land Development Review Approved 10/30/2024 10/31/2024
Building Code Review Approved 10/30/2024 10/25/2024
Utilities Review - City Approved 10/02/2024 10/03/2024
GIS Land Development Review Failed 10/02/2024 10/02/2024
Planning Review Approved 10/02/2024 10/02/2024
Engineering Review Approved 10/02/2024 10/02/2024
Finance Department Review Approved 10/02/2024 09/30/2024
Building Code Review Failed 10/02/2024 09/30/2024
Fire Code Review Approved 10/02/2024 09/29/2024

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Framing Inspection Partial Pass 11/20/2024 11/20/2024
Todd Carr
Footing Inspection Partial Pass 12/5/2024 12/05/2024
Jeff Yeiser
Wall/Roof Sheeting Not Ready 12/27/2024 12/27/2024 12/27/2024
Silas Ebbert
Framing Inspection Partial Pass 12/27/2024
Silas Ebbert
Corrections:


Building Department Corrections to be Completed
Carried Forward
12/27/2024
Install header and hangers at front entry and fasten ledgers better Contact engineer about back stairway as built conditions and if second LVL ply is needed.

Footing Inspection Not Ready 12/27/2024 12/27/2024 12/27/2024
Silas Ebbert
Framing Inspection Partial Pass 01/06/2025
Silas Ebbert
Corrections:


Building Department Corrections to be Completed
Resolved
01/06/2025
Install header and hangers at front entry and fasten ledgers better Contact engineer about back stairway as built conditions and if second LVL ply is needed.

Building Department Corrections to be Completed
Carried Forward
01/06/2025
Building Department Corrections to be Completed 1. Add ledger fasteners into studs on old mezzanine area floor

Footing Inspection Passed 1/6/2025 1/6/2025 01/06/2025
Silas Ebbert
Framing Inspection Not Ready 1/22/2025 01/21/2025
Todd Carr
Corrections:


Building Department Corrections to be Completed
Carried Forward
01/21/2025
Building Department Corrections to be Completed 1. Add ledger fasteners into studs on old mezzanine area floor

Drywall Inspection Partial Pass 01/28/2025
Silas Ebbert
Insulation Inspection Not Ready 1/28/2025 1/28/2025 01/28/2025
Silas Ebbert
Drywall Inspection Partial Pass 2/25/2025 02/25/2025
Silas Ebbert
Drywall Inspection Partial Pass 3/7/2025 3/7/2025 03/07/2025
Silas Ebbert
Drywall Inspection Partial Pass 3/10/2025 3/10/2025 03/10/2025
Silas Ebbert
Drywall Inspection Passed 3/12/2025 3/14/2025 03/14/2025
Silas Ebbert
Building Final Inspection Failed 3/26/2025 3/26/2025 03/26/2025
Silas Ebbert
Corrections:


Building Department Corrections to be Completed
Carried Forward
03/26/2025
Building Department Corrections to be Completed 1. Install self closing hinges and smoke seals on fire door 2. Pass final electrical inspection

Building Final Inspection Passed 5/22/2025 5/22/2025 05/22/2025
Silas Ebbert
Corrections:


Building Department Corrections to be Completed
Resolved
05/22/2025
Building Department Corrections to be Completed 1. Install self closing hinges and smoke seals on fire door 2. Pass final electrical inspection

Conditions

Condition Status Category
Miscellaneous Conditions Resolved Prior to Rough Building Wall Inspections
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Nick Kuchulis @ 09/29/2024 6:15 PM]
Final Fire Inspection Required Resolved Prior to Issuance of CO/CC
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 09/30/2024 9:49 AM]
MF/Com/I Planning CO Review Resolved Prior to Issuance of TCO/CO/CC
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 7:55 AM]
Vested Approval Conditions Resolved Prior to Issuance of TCO/CO/CC
Planning Department
Compliance with PL20240033 conditions of approval required.
Building Department Conditions to be Completed Resolved Prior to Issuance of CO/CC
Building Department
Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance. All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued. Initial Costs were calculated off drawings: R-2 new apartment on level 2 has 1251 SQ FT x 100 = $125,100 and 1251 SQ FT x 75 = $93,825 New Office Space level 1 has 1429 SQ FT x 40 = $57,100 and 1429 SQ FT x 30 = $ 42,870 Total Project Valuation is $182,200 Total Value of Work Permitted is $136,695 [Todd Carr @ 10/23/2024 1:17 PM]
Building Department Conditions to be Completed Resolved Prior to Issuance of CO/CC
Building Department
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 10/04/2024 7:22 AM]
Building Department Conditions to be Completed Resolved Prior to Issuance of TCO/CO/CC
Building Department
[Todd Carr @ 10/04/2024 7:24 AM] Applicants/Owners must apply for an Electrical Permiit and complete all inspections prior to TCO.
Building Department Conditions to be Completed Resolved Prior to Full Building Permit Issuance
Building Department
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of exisitng construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 10/04/2024 10:36 AM]
Miscellaneous Conditions Resolved Prior to Issuance of TCO/CO/CC
GIS
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane.
Building Department Conditions to be Completed Resolved
Building Department
Building Department Conditions to be Completed 1. Bighorn Mechanical Engineers need to be consulted on the downs stairs bathroom fan that is called on plans to be continuously running. This fan exhausts into the hallway instead of terminating outside. This bathroom and overall project was built under the 2003 I codes and we need the mechanical engineers to assess whether with bathroom needs to be ventilated at all and if then the bathroom and hallway areas need ventilation requirements that could be met with removing doors between rooms with windows and the hallway or installing transfer grills. From 2003 IBC 1203.4.2.1 Bathrooms. Rooms containing bathtubs, showers, spas and similar bathing fixtures shall be mechanically ventilated in accordance with the International Mechanical Code.
Miscellaneous Conditions Open Prior to Issuance of CO/CC
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 7:55 AM] Site Inspection on 10/17 showed missing striping of two spaces along the Eastern property line, along with 2 missing ADA spaces. Prior to full CO, these issues must be resolved. [Jeremy Brown @ 10/27/2025 4:25 PM]
Use Tax Reconciliation Resolved Prior to Issuance of CO/CC
Finance
Use Tax Recon work must be completed with City Finance: Contact the city directly for more information @ constructionusetax@steamboatsprings.net

Related Permit & Planning Applications

Reference Number Status Type
SPRPL241916 Closed Plumbing
SPRMH250116 Closed Mechanical
SPREL250417 Closed Electrical

Documents & Images

Date Uploaded File Type Name
Report
Letter
Report
Report
Report
Letter CERTIFICATE OF TEMPORARY OCCUPANCY.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Permit PERMIT - DETAILED.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
09/23/2024 ElectricalDrawings_RiverfrontParkUnit2_Permit_24018
09/23/2024 MechanicalDrawings_RiverfrontParkUnit2_Permit_24018
09/25/2024 Plans 1900 bridge lane units 1-7 original construction plans
10/03/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
10/23/2024 Letter Response to Plan Review Comments
10/31/2024 Plans ArchitecturalDrawings_RiverfrontParkUnit2_Permit_24018 (Stamped)
10/31/2024 Plans Structural Drawings (Stamped)
10/31/2024 Plans Mechanical-PlumbingDrawings_Riverfront Park_Revised Permit (Stamped)
01/15/2025 Plans Site Plan SIDEWALK EASEMENT Recorded 122324 (Stamped)
03/14/2025 Plans Ventilation Report 02.27.2025 (Stamped)