Permit Application Status
SPRRN241466
| Date Returned | Name |
|---|---|
| 10/31/2024 | ArchitecturalDrawings_RiverfrontParkUnit2_Permit_24018 (Stamped) |
| 01/15/2025 | Site Plan SIDEWALK EASEMENT Recorded 122324 (Stamped) |
| 10/31/2024 | Structural Drawings (Stamped) |
| 10/31/2024 | Mechanical-PlumbingDrawings_Riverfront Park_Revised Permit (Stamped) |
| 03/14/2025 | Ventilation Report 02.27.2025 (Stamped) |
| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| COO Review - Planning | TCO Approved | 11/03/2025 | 10/27/2025 |
| COO Review - Building Code | Approved | 07/30/2025 | 07/23/2025 |
| COO Review - Finance Department | Approved | 07/29/2025 | 07/22/2025 |
| COO Review - Building Code | Failed | 05/23/2025 | 05/23/2025 |
| COO Review - Planning | Failed | 04/02/2025 | 04/22/2025 |
| COO Review - Fire Code | Approved | 04/02/2025 | 04/03/2025 |
| COO Review - GIS Land Development | Approved | 04/02/2025 | 04/03/2025 |
| COO Review - Building Code | Failed | 04/02/2025 | 04/02/2025 |
| Building Code Review | Approved | 03/14/2025 | |
| GIS Land Development Review | Approved | 10/30/2024 | 10/31/2024 |
| Building Code Review | Approved | 10/30/2024 | 10/25/2024 |
| Utilities Review - City | Approved | 10/02/2024 | 10/03/2024 |
| GIS Land Development Review | Failed | 10/02/2024 | 10/02/2024 |
| Planning Review | Approved | 10/02/2024 | 10/02/2024 |
| Engineering Review | Approved | 10/02/2024 | 10/02/2024 |
| Finance Department Review | Approved | 10/02/2024 | 09/30/2024 |
| Building Code Review | Failed | 10/02/2024 | 09/30/2024 |
| Fire Code Review | Approved | 10/02/2024 | 09/29/2024 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Framing Inspection | Partial Pass | 11/20/2024 | 11/20/2024 | |
| Todd Carr | ||||
| Footing Inspection | Partial Pass | 12/5/2024 | 12/05/2024 | |
| Jeff Yeiser | ||||
| Wall/Roof Sheeting | Not Ready | 12/27/2024 | 12/27/2024 | 12/27/2024 |
| Silas Ebbert | ||||
| Framing Inspection | Partial Pass | 12/27/2024 | ||
| Silas Ebbert | ||||
|
Corrections:
Building Department Corrections to be Completed
Carried Forward
12/27/2024
Install header and hangers at front entry and fasten ledgers better
Contact engineer about back stairway as built conditions and if second LVL ply is needed.
|
||||
| Footing Inspection | Not Ready | 12/27/2024 | 12/27/2024 | 12/27/2024 |
| Silas Ebbert | ||||
| Framing Inspection | Partial Pass | 01/06/2025 | ||
| Silas Ebbert | ||||
|
Corrections:
Building Department Corrections to be Completed
Resolved
01/06/2025
Install header and hangers at front entry and fasten ledgers better
Contact engineer about back stairway as built conditions and if second LVL ply is needed.
|
||||
|
Building Department Corrections to be Completed
Carried Forward
01/06/2025
Building Department Corrections to be Completed
1. Add ledger fasteners into studs on old mezzanine area floor
|
||||
| Footing Inspection | Passed | 1/6/2025 | 1/6/2025 | 01/06/2025 |
| Silas Ebbert | ||||
| Framing Inspection | Not Ready | 1/22/2025 | 01/21/2025 | |
| Todd Carr | ||||
|
Corrections:
Building Department Corrections to be Completed
Carried Forward
01/21/2025
Building Department Corrections to be Completed
1. Add ledger fasteners into studs on old mezzanine area floor
|
||||
| Drywall Inspection | Partial Pass | 01/28/2025 | ||
| Silas Ebbert | ||||
| Insulation Inspection | Not Ready | 1/28/2025 | 1/28/2025 | 01/28/2025 |
| Silas Ebbert | ||||
| Drywall Inspection | Partial Pass | 2/25/2025 | 02/25/2025 | |
| Silas Ebbert | ||||
| Drywall Inspection | Partial Pass | 3/7/2025 | 3/7/2025 | 03/07/2025 |
| Silas Ebbert | ||||
| Drywall Inspection | Partial Pass | 3/10/2025 | 3/10/2025 | 03/10/2025 |
| Silas Ebbert | ||||
| Drywall Inspection | Passed | 3/12/2025 | 3/14/2025 | 03/14/2025 |
| Silas Ebbert | ||||
| Building Final Inspection | Failed | 3/26/2025 | 3/26/2025 | 03/26/2025 |
| Silas Ebbert | ||||
|
Corrections:
Building Department Corrections to be Completed
Carried Forward
03/26/2025
Building Department Corrections to be Completed
1. Install self closing hinges and smoke seals on fire door
2. Pass final electrical inspection
|
||||
| Building Final Inspection | Passed | 5/22/2025 | 5/22/2025 | 05/22/2025 |
| Silas Ebbert | ||||
|
Corrections:
Building Department Corrections to be Completed
Resolved
05/22/2025
Building Department Corrections to be Completed
1. Install self closing hinges and smoke seals on fire door
2. Pass final electrical inspection
|
||||
| Condition | Status | Category |
|---|---|---|
| Miscellaneous Conditions | Resolved | Prior to Rough Building Wall Inspections |
|
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Nick Kuchulis @ 09/29/2024 6:15 PM]
|
||
| Final Fire Inspection Required | Resolved | Prior to Issuance of CO/CC |
|
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 09/30/2024 9:49 AM]
|
||
| MF/Com/I Planning CO Review | Resolved | Prior to Issuance of TCO/CO/CC |
|
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 7:55 AM]
|
||
| Vested Approval Conditions | Resolved | Prior to Issuance of TCO/CO/CC |
|
Planning Department
Compliance with PL20240033 conditions of approval required.
|
||
| Building Department Conditions to be Completed | Resolved | Prior to Issuance of CO/CC |
|
Building Department
Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
Initial Costs were calculated off drawings:
R-2 new apartment on level 2 has 1251 SQ FT x 100 = $125,100 and 1251 SQ FT x 75 = $93,825
New Office Space level 1 has 1429 SQ FT x 40 = $57,100 and 1429 SQ FT x 30 = $ 42,870
Total Project Valuation is $182,200
Total Value of Work Permitted is $136,695
[Todd Carr @ 10/23/2024 1:17 PM]
|
||
| Building Department Conditions to be Completed | Resolved | Prior to Issuance of CO/CC |
|
Building Department
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 10/04/2024 7:22 AM]
|
||
| Building Department Conditions to be Completed | Resolved | Prior to Issuance of TCO/CO/CC |
|
Building Department
[Todd Carr @ 10/04/2024 7:24 AM] Applicants/Owners must apply for an Electrical Permiit and complete all inspections prior to TCO.
|
||
| Building Department Conditions to be Completed | Resolved | Prior to Full Building Permit Issuance |
|
Building Department
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of exisitng construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 10/04/2024 10:36 AM]
|
||
| Miscellaneous Conditions | Resolved | Prior to Issuance of TCO/CO/CC |
|
GIS
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane.
|
||
| Building Department Conditions to be Completed | Resolved | |
|
Building Department
Building Department Conditions to be Completed
1. Bighorn Mechanical Engineers need to be consulted on the downs stairs bathroom fan that is called on plans to be continuously running. This fan exhausts into the hallway instead of terminating outside. This bathroom and overall project was built under the 2003 I codes and we need the mechanical engineers to assess whether with bathroom needs to be ventilated at all and if then the bathroom and hallway areas need ventilation requirements that could be met with removing doors between rooms with windows and the hallway or installing transfer grills.
From 2003 IBC
1203.4.2.1 Bathrooms.
Rooms containing bathtubs, showers, spas and similar bathing fixtures shall be mechanically ventilated in accordance with the International Mechanical Code.
|
||
| Miscellaneous Conditions | Open | Prior to Issuance of CO/CC |
|
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 7:55 AM]
Site Inspection on 10/17 showed missing striping of two spaces along the Eastern property line, along with 2 missing ADA spaces. Prior to full CO, these issues must be resolved. [Jeremy Brown @ 10/27/2025 4:25 PM]
|
||
| Use Tax Reconciliation | Resolved | Prior to Issuance of CO/CC |
|
Finance
Use Tax Recon work must be completed with City Finance: Contact the city directly for more information @ constructionusetax@steamboatsprings.net
|
||
| Reference Number | Status | Type |
|---|---|---|
| SPRPL241916 | Closed | Plumbing |
| SPRMH250116 | Closed | Mechanical |
| SPREL250417 | Closed | Electrical |