Date Returned | Name |
---|---|
ARCHITECHTURAL PLANS_MARNO SDU PERMIT_23103 #2 (STAMPED).PDF | |
11/30/2023 | Marno Site Plan (Stamped) |
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
COO Review - Building Code | Approved | 05/22/2024 | 05/22/2024 |
Heidi Spengler
|
|||
All building complete. | |||
COO Review - GIS Land Development | Approved | 05/16/2024 | 05/16/2024 |
Colten Yoast
|
|||
This is a secondary dwelling unit needs an address. | |||
COO Review - Finance Department | Approved | 05/16/2024 | 05/09/2024 |
Sondra Spratta
|
|||
COO Review - Building Code | TCO Approved | 05/15/2024 | 05/09/2024 |
Heidi Spengler
|
|||
Passed final inspection need addressing posted | |||
COO Review - Finance Department | Failed | 05/07/2024 | 05/09/2024 |
Sondra Spratta
|
|||
Review for CC. | |||
COO Review - Planning | Approved | 05/07/2024 | 05/07/2024 |
Darby Kenyon
|
|||
Review for CC. FLC not required. [Darby Kenyon @ 05/07/2024 8:01 AM] | |||
COO Review - Building Code | Failed | 05/03/2024 | 05/03/2024 |
Heidi Spengler
|
|||
TCO/CO need to pass final electrical inspection | |||
Utilities Review - Mt. Werner | Approved | 12/04/2023 | 11/30/2023 |
Beau Cahill
|
|||
Miscellaneous
Outstanding
11/22/2023
PIF Fees due prior to building permit approval. Email completed form to bcahill@mwwater.com
|
|||
Planning Review | Approved | 12/04/2023 | 11/28/2023 |
Darby Kenyon
|
|||
Miscellaneous
Resolved
11/28/2023
A limited use permit to allow for the secondary unit is required prior to the building permit approval. Review CDC Section 300 + 306.D and contact the Planning Department for assistance with the limited use permit, ph: 970-871-8258.
Resolved: Limited use permit approved for the secondary dwelling unit, see permit # PL20230320. [Darby Kenyon @ 11/28/2023 5:19 PM]
|
|||
Reference Limited Use Permit application # PL20230320 for secondary dwelling unit | |||
Building Code Review | Approved | 12/04/2023 | 11/28/2023 |
Ted Allen
|
|||
Miscellaneous
Resolved
11/28/2023
Because the kitchen was never allowed in the basement permit B-94-009-S secondary units constructed as part of the primary dwelling ownership and space, requires us to kick in section R302.3 Two Family Dwelling Fire Separation. In addition to separating the owner’s storage room, walls and supports between SDU separations. Detail 4/A-1 shall be shown in area on floor plan. Detail 3/A-1 shall be shown on floor plan of separation walls including owner’s storage room and stair walls, and supporting construction consisting of walls, beams steel beams hanging down below 4/A-1 may require a 1-Hour fire rating). Please coordinate plans with details, and provide copies of tested assemblies required penetrations (similar to those referenced above for construction of the appropriate Fire Ratings and protection of columns).
|
|||
Utilities Review - Mt. Werner | Failed | 11/13/2023 | 11/14/2023 |
Beau Cahill
|
|||
Miscellaneous
Carried Forward
11/22/2023
PIF Fees due prior to building permit approval. Email completed form to bcahill@mwwater.com
|
|||
PIF Fees due prior to building permit approval. Email completed form to bcahill@mwwater.com | |||
Planning Review | Failed | 11/13/2023 | 11/09/2023 |
Darby Kenyon
|
|||
Miscellaneous
Carried Forward
11/22/2023
A limited use permit to allow for the secondary unit is required prior to the building permit approval. Review CDC Section 300 + 306.D and contact the Planning Department for assistance with the limited use permit, ph: 970-871-8258.
|
|||
Interior alteration work OK. | |||
Building Code Review | Failed | 11/13/2023 | 11/09/2023 |
Ted Allen
|
|||
Miscellaneous
Carried Forward
11/22/2023
Because the kitchen was never allowed in the basement permit B-94-009-S secondary units constructed as part of the primary dwelling ownership and space, requires us to kick in section R302.3 Two Family Dwelling Fire Separation. In addition to separating the owner’s storage room, walls and supports between SDU separations. Detail 4/A-1 shall be shown in area on floor plan. Detail 3/A-1 shall be shown on floor plan of separation walls including owner’s storage room and stair walls, and supporting construction consisting of walls, beams steel beams hanging down below 4/A-1 may require a 1-Hour fire rating). Please coordinate plans with details, and provide copies of tested assemblies required penetrations (similar to those referenced above for construction of the appropriate Fire Ratings and protection of columns).
|
|||
Fire Code Review | Approved | 11/13/2023 | 11/08/2023 |
Charles Brookshire
|
|||
Full Permit. NB | |||
Finance Department Review | Approved | 11/13/2023 | 11/07/2023 |
Amy Camilletti
|
|||
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Drywall Inspection | Not Ready | 1/5/2024 | 1/5/2024 | 01/05/2024 |
Jeff Yeiser | ||||
Framing Inspection | Partial Pass | 1/5/2024 | 1/5/2024 | 01/05/2024 |
Jeff Yeiser | ||||
Shower Pan | Passed | 1/5/2024 | 1/5/2024 | 01/05/2024 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 1/10/2024 | 1/10/2024 | 01/10/2024 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 1/17/2024 | 1/18/2024 | 01/18/2024 |
Jeff Yeiser | ||||
Drywall Inspection | Partial Pass | 1/25/2024 | 1/25/2024 | 01/25/2024 |
Ron Norton | ||||
Drywall Inspection | Passed | 1/29/2024 | 01/29/2024 | |
Ron Norton | ||||
Building Final Inspection | Passed | 5/2/2024 | 5/2/2024 | 05/02/2024 |
Ron Norton | ||||
Building Final Inspection | Passed | 5/21/2024 | 5/21/2024 | 05/21/2024 |
Ron Norton |
Condition | Status | Category |
---|---|---|
Use Tax Reconciliation | Resolved | Prior to Issuance of CO/CC |
Sales Tax Department
Use Tax Reconciliation
|
||
Water/Sanitary Acceptance | Resolved | Prior to Full Building Permit Issuance |
Mount Werner Water & Sanitation
Plant Investment Fees due to Mt Werner Water prior to approval. Utilize PIF fee form to calculate fees due for additional fixtures being added. Send completed form to bcahill@mwwater.com
|
||
SFR/Dup Planning CO Review | Resolved | Prior to Issuance of TCO/CO/CC |
Planning Department
Prior to issuance of a Certificate of Occupancy, the Department of Planning and Community Development may conduct an onsite inspection to ensure the project has been built in accordance with the approved plans and the Community Development Code. In the event the planning department deems an inspection necessary, a planning representative will contact the applicant. The applicant need not call for inspections. The inspection may include but is not limited to general site planning and grading, outdoor lighting, parking, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
CO required for the secondary unit, per the conditions of the limited use permit to allow for the secondary dwelling unit use. Limited use permit shall be approved prior to the CO approval.
|
||
Building Department Conditions to be Completed | Resolved | Prior to Issuance of TCO/CO/CC |
Building Department
Building Department Conditions to be Completed
Must have permanent address viable
|
Reference Number | Status | Type |
---|---|---|
SPRPL231793 | Closed | Plumbing |
SPREL240020 | Closed | Electrical |
SPRMH240032 | Closed | Mechanical |
Date Uploaded | File Type | Name |
---|---|---|
Plans | ARCHITECHTURAL PLANS_MARNO SDU PERMIT_23103 #2 (STAMPED).PDF | |
Other | CERTIFICATE OF OCCUPANCY.PDF | |
Letter | INCOMPLETE APPLICATION NOTICE.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
MARNO-23PIF FORM WITH SUBTRACTION.PDF | ||
Letter | PERMIT - DETAILED.PDF | |
Letter | PERMIT REVIEW CORRECTIONS NOTICE.PDF | |
Receipt | RECEIPT.PDF | |
Receipt | RECEIPT.PDF | |
Receipt | RECEIPT.PDF | |
09/19/2023 | Form | Marno Site Plan Check List |
11/22/2023 | Plans | Inspection Approvals 96' |
11/22/2023 | MARNO-23PIF FORM with Subtraction.xlsx | |
11/22/2023 | Plans | Marno OG 11_25_96 |
11/30/2023 | Plans | Marno Site Plan (Stamped) |