Planning Application Status

PL20250033


You will only be able to view fees if you are a contact on the planning application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PL20250033
Bridge Lane Condominiums
Development Plan
Development Plan - Public Hearing & Condtional Use
Withdrawn
01/31/2025
BRIDGE LANE REALTY LLC
Development plan application for a multi-family housing project at Future Expansion Parcel, Riverfront Park Filing No. 2

Locations

Address
1960 BRIDGE LN

Property
282601001

Address
1940 BRIDGE LN

Application Types

Development Plan - Public Hearing & Condtional Use

Planning Commission
Withdrawn

Hearings

There are no hearings for this planning application.

Inspections

There are no inspections for this planning application, or you are not authorized to view them.

Conditions

Condition Status Category
Site Posting Affidavit Resolved Prior to Final Review
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
Building Dept Informational Comments Open Prior to Issuance of Construction Permit
Building Department
At this time we can only offer informational comments to the applicant, as the architectural plans provide no code study information for the Building Department to review, and the site plan offers no proposed dimensions from property line to new buildings, nor information on distances from building to building on the site plan. We are currently reviewing plans under the 2021 ICC Codes, this project appears to possibly be being proposed as IRC townhomes, but it could be designed as IBC R-2 dwellings as well, were not sure of your intent. Either way this project would need to be reveiwed for ADA compliance not just for parking, but access to the units and also inside the units, and requirements will be different dependent upon the code study and pathway through which code book. We have no other comments at this time until we are provided more information in terms of code study work. [Todd Carr @ 02/12/2025 10:51 AM]
Mineral Rights Notification Affidavit Resolved
Planning Department
Mineral Rights Notification: Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
AO Avigation Easement - BP Open Prior to Issuance of Construction Permit
Planning Department
Prior to Building Permit issuance, the property owner shall record an avigation easement.
AO Proximity Disclosure - BP Open Prior to Issuance of Construction Permit
Planning Department
Prior to Building Permit issuance, the property owner shall record an airport proximity disclosure.

Related Permit & Planning Applications

There are no related items for this planning application.

Documents & Images

Date Uploaded File Type Name
Letter
Letter NOTICE OF COMPLETE APPLICATION.PDF
Letter NOTICE OF INCOMPLETE APPLICATION.PDF
Receipt RECEIPT.PDF
Letter WITHDRAW LETTER FIRST NOTICE.PDF
01/31/2025 C10 CSMP
01/31/2025 Study Preconsultation Approval Letter - Water Demand Signed Waiver
01/31/2025 Study 25002_Riverfront Park Filing No_ 2 Traffic Study_2025-01-30
01/31/2025 Study Preconsultation Approval Letter - Geotech Report
01/31/2025 Study FEMA Firmette 2005
01/31/2025 Other Property Owner Sign Off & Submittal Requirements Form
02/03/2025 Study Preliminary Floodplain Analysis
02/03/2025 Form Fire Flow Demand and Availability Form
02/03/2025 Form EXH - Fire Hydrant Vicinity Map
02/03/2025 Plans C4 G&D PLAN
02/17/2025 Mineral Rights Affidavit
02/17/2025 2349-002 Property Posting Affidavit
02/17/2025 2349-002 Property Posting 2-10-2025
03/07/2025 Plans C7 SNOW STORAGE (Received)
03/07/2025 Study C2 EXISTING CONDITIONS PLAN0 (Received)
03/07/2025 Letter Proof of Ownership (Received)
05/29/2025 2025_05_05 - Bridge Lane - Development Permit Part 4
05/29/2025 FPSE DP DRT Response Letter
05/29/2025 2349-002 Ground Floor Height Major Variance Request - Bridge Lane Condominiums
05/29/2025 C10 CSMP
05/29/2025 C11 FIRE TRUCK TURNING ANALYSIS
05/29/2025 C12 PROPOSED EASEMENTS EXHIBIT
05/29/2025 Study C3 SITE PLAN
05/29/2025 Study 2349 Bridge Lane Condo Drainage Report - DRAFT
05/29/2025 Plans C9 PHASING PLAN
05/29/2025 Plans GE_PEC5TL_Catalog
05/29/2025 Plans C8 LIGHTING PLAN
05/29/2025 Plans Bridge Lane Condominiums - Landscape Master Plan R1 05-29-25
05/29/2025 Plans 2025_05_05 - Bridge Lane - Development Permit Part 3
05/29/2025 Plans 2025_05_05 - Bridge Lane - Development Permit Part 2
05/29/2025 Plans 2025_05_05 - Bridge Lane - Development Permit Part 1
05/29/2025 Plans C5 ACCESS PROFILE
05/29/2025 Plans C4 G&D PLAN
05/29/2025 Plans C6 UTILITY PLAN
05/29/2025 Plans C3 SITE PLAN
05/29/2025 Plans C1 COVER
05/29/2025 Plans C2 EXISTING CONDITIONS PLAN
05/29/2025 Narrative 2349-002 Bridge Lane Condominiums Development Plan Narrative