Permit Application Status
SPRSF250158
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Date Returned | Name |
---|---|
04/21/2025 | Architectural 2025_02_12 (Received) (Stamped) |
04/21/2025 | Site Plan 2025_04_14 (Stamped) |
04/21/2025 | Structurals (Stamped) |
04/21/2025 | Utility Plan 2025_04_14 (Stamped) |
04/21/2025 | CSMP 2025_03_25 (Stamped) |
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Utilities Review - Mt. Werner | Approved | 04/24/2025 | 04/21/2025 |
Beau Cahill
|
|||
See Document Markups
Resolved
04/21/2025
Water service must use MWW duplex service detail - reference MWW specifications. 4/10/25 Update: Referencing the the duplex service detail on the site and utility plans is not sufficient. You must include and show three curb stops, one on each service line and one on the primary water stub coming off the main.
|
|||
Miscellaneous
Resolved
04/21/2025
Plant investment fees must be paid in full prior to approval of any building permit. Fees sent to applicant on 3/6/2025.
4/21/2025: Resolving correction and relying on open condition requiring payment of fees prior to permit issuance.
Informational Comments:
All work water and sewer infrastructure must be installed, inspected, and approved per the latest edition of MWW Rules, Regulations, and Standard Specifications
No retaining walls or improvements to be installed in any utility easement
|
|||
4/21/2025: Resolving correction and relying on open condition requiring payment of fees prior to permit issuance. | |||
Utilities Review - Mt. Werner | Failed | 04/10/2025 | 04/10/2025 |
Beau Cahill
|
|||
See Document Markups
Carried Forward
04/17/2025
Water service must use MWW duplex service detail - reference MWW specifications. 4/10/25 Update: Referencing the the duplex service detail on the site and utility plans is not sufficient. You must include and show three curb stops, one on each service line and one on the primary water stub coming off the main.
|
|||
See Document Markups
Resolved
04/10/2025
Indicate water line size, material, and depth of cover per MWW spec
|
|||
See Document Markups
Resolved
04/10/2025
Indicate sanitary line size, material, and depth of cover.
|
|||
See Document Markups
Resolved
04/10/2025
Sanitary service line subject conditions outlined in agreement between the District and current and successive owners of adjacent lot 11B. Reception #: 850337
|
|||
Miscellaneous
Carried Forward
04/17/2025
Plant investment fees must be paid in full prior to approval of any building permit. Fees sent to applicant on 3/6/2025.
Informational Comments:
All work water and sewer infrastructure must be installed, inspected, and approved per the latest edition of MWW Rules, Regulations, and Standard Specifications
No retaining walls or improvements to be installed in any utility easement
|
|||
Construction Site Management Review | Approved | 04/10/2025 | 04/10/2025 |
Scott Slamal
|
|||
Miscellaneous
Resolved
04/10/2025
Show sediment control check dams along west and east drainages.
|
|||
Miscellaneous
Resolved
04/10/2025
Show perimeter controls around proposed stock piles.
|
|||
Miscellaneous
Resolved
04/10/2025
Show contractor parking locations.
|
|||
Miscellaneous
Resolved
04/10/2025
Show vehicle tracking pad. Tracking pads for residential sites shall be constructed with a minimum 1 3/4" angular aggregate. If using FODs mats, a minimum of two mats are required and need to be installed per the manufactures specifications.
|
|||
Miscellaneous
Resolved
04/10/2025
Due to slope grades and duration of construction, wire backed silt fence is required at south perimeter of disturbed slopes.
|
|||
GIS Land Development Review | Approved | 04/10/2025 | 04/09/2025 |
Colten Yoast
|
|||
Miscellaneous
Outstanding
04/03/2025
Property needs addressed which is requiring the surrounding land owners to change their address. I am in the process of getting these changed.
|
|||
In the street name approval process. | |||
Planning Review | Approved | 03/07/2025 | 03/10/2025 |
Darby Kenyon
|
|||
Reference Conditional Use Permit CU-18-11, duplex allowed and development plan is not required. CDC Duplex Design Standards applied. RR-2 zone district standards OK and duplex design standards OK. When final light fixtures are selected, applicant should refer to CDC Section 405 Exterior Lighting Standards (specifically 405.D.2) to ensure code compliance and avoid any code enforcement cases. | |||
GIS Land Development Review | Failed | 03/07/2025 | 03/10/2025 |
Colten Yoast
|
|||
Miscellaneous
Carried Forward
04/03/2025
Property needs addressed which is requiring the surrounding land owners to change their address. I am in the process of getting these changed.
|
|||
Property needs addressed which is requiring the surrounding land owners to change their address. I am in the process of getting these changed. | |||
External Agencies Review | Approved | 03/07/2025 | 03/10/2025 |
Malea Michael-Ferrier
|
|||
Utilities Review - Mt. Werner | Failed | 03/07/2025 | 03/06/2025 |
Beau Cahill
|
|||
See Document Markups
Carried Forward
04/03/2025
Water service must use MWW duplex service detail - reference MWW specifications
|
|||
See Document Markups
Carried Forward
04/03/2025
Indicate water line size, material, and depth of cover per MWW spec
|
|||
See Document Markups
Carried Forward
04/03/2025
Indicate sanitary line size, material, and depth of cover.
|
|||
See Document Markups
Carried Forward
04/03/2025
Sanitary service line subject conditions outlined in agreement between the District and current and successive owners of adjacent lot 11B. Reception #: 850337
|
|||
Miscellaneous
Carried Forward
04/03/2025
Informational Comments:
Plant investment fees must be paid in full prior to approval of any building permit. Fees sent to applicant on 3/6/2025.
All work water and sewer infrastructure must be installed, inspected, and approved per the latest edition of MWW Rules, Regulations, and Standard Specifications
No retaining walls or improvements to be installed in any utility easement
|
|||
Construction Site Management Review | Failed | 03/07/2025 | 03/06/2025 |
Scott Slamal
|
|||
Miscellaneous
Carried Forward
04/03/2025
Show sediment control check dams along west and east drainages.
|
|||
Miscellaneous
Carried Forward
04/03/2025
Show perimeter controls around proposed stock piles.
|
|||
Miscellaneous
Carried Forward
04/03/2025
Show contractor parking locations.
|
|||
Miscellaneous
Carried Forward
04/03/2025
Show vehicle tracking pad. Tracking pads for residential sites shall be constructed with a minimum 1 3/4" angular aggregate. If using FODs mats, a minimum of two mats are required and need to be installed per the manufactures specifications.
|
|||
Miscellaneous
Carried Forward
04/03/2025
Due to slope grades and duration of construction, wire backed silt fence is required at south perimeter of disturbed slopes.
|
|||
Electrical Review | Approved | 03/07/2025 | 03/04/2025 |
Tom Cook
|
|||
One-line electrical drawing required prior to rough | |||
Building Code Review | Approved | 03/07/2025 | 02/26/2025 |
Ted Allen
|
|||
Fire Code Review | Approved | 03/07/2025 | 02/25/2025 |
Matt Workman
|
|||
Full Permit - Any fire alarm/sprinkler work will require permit/plans to be submitted by sub-contractor to Fire Prevention. | |||
Finance Department Review | Approved | 03/07/2025 | 02/25/2025 |
Sondra Spratta
|
|||
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Foundation/Under Slab Insulation | Pending | |||
Footing Inspection | Pending | |||
Foundation Inspection | Pending | |||
Foundation Drain Inspection | Pending | |||
Water Service Inspection | Pending | |||
Amber Gregory | ||||
Sewer Service Inspection | Pending | |||
Amber Gregory | ||||
Interim Construction Site Management | Pending | |||
Scott Slamal | ||||
Rough Site Inspection | Pending | |||
Scott Slamal | ||||
Framing Inspection | Pending | |||
Roofing Inspection | Pending | |||
Insulation Inspection | Pending | |||
Drywall Inspection | Pending | |||
Final Site Inspection | Pending | |||
Scott Slamal | ||||
Final Construction Site Management | Pending | |||
Scott Slamal | ||||
Building Final Inspection | Pending | |||
Structural Inspection | Pending | |||
Foundation Water Proofing | Pending | |||
Lath/Veneer Inspection | Pending | |||
Radon Piping | Pending | |||
Shower Pan | Pending | |||
Wall/Roof Sheeting | Pending | |||
Condition | Status | Category |
---|---|---|
Use Tax Reconciliation | Open | Prior to Issuance of CO/CC |
Finance
Use Tax Reconciliation
|
||
Miscellaneous Conditions | Resolved | |
Fire Prevention
Any fire alarm/sprinkler work will require permit/plans to be submitted by sub-contractor to Fire Prevention. [Shannon Yaconiello @ 02/25/2025 1:56 PM]
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Fire Prevention
Fire needs to be involved with TCO/CO/CC sign-off in case there is an alarm or sprinkler permit. [Shannon Yaconiello @ 02/25/2025 1:58 PM]
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Building Department
A separate permit for elevators must be obtained from Northwest Colorado Council of Governments prior to installation. Plan review and inspection services are contracted through Northwest Colorado Council of Governments, 249 Warren Avenue, P.O. Box 2308, Silverthorne, CO 80498. Phone (970) 468-0295 ext. 108
|
||
Truss Drawings Deferred Submittal | Open | Prior to Insulaton Inspections Scheduled |
Building Department
Truss drawings shall be submitted, reviewed and approved prior to installation and inspections.
|
||
Blower Door Test Results | Open | Prior to Certificate of Occupancy/Completion |
Building Department
Blower Door Test Results
|
||
Helical Pier Special Inspection Report to be Submitted | Open | Prior to Footing/Foundation Inspection |
Building Department
Helical Pier Special Inspection Report to be Submitted
|
||
Heat Loss Calculations Deferred Submittal | Open | Prior to Mechanical Permit Issuance for Heat |
Building Department
Heat Load Calculations must be submitted, Reviewed and approved prior to any heating equipment being installed.
|
||
Miscellaneous Conditions | Open | Prior to Rough Building Wall Inspections |
Building Department
One-line electrical drawing required prior to rough
|
||
Miscellaneous Conditions | Resolved | Prior to Full Building Permit Issuance |
Mount Werner Water & Sanitation
Plant investment fees must be paid in full to MWW prior to permit approval. Fees were sent to applicant on 3/6/25
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Mount Werner Water & Sanitation
Water and sewer infrastructure must inspected and approved by MWW staff prior to any issuance of occupancy
|
||
FLC Submittal | Open | Prior to Rough Site Inspection |
Planning Department
Foundation location certificate shall be provided
|
||
SFR/Dup Planning CO Review | Open | Prior to Issuance of TCO/CO/CC |
Planning Department
Prior to issuance of a Certificate of Occupancy, the Department of Planning and Community Development may conduct an onsite inspection to ensure the project has been built in accordance with the approved plans and the Community Development Code. In the event the planning department deems an inspection necessary, a planning representative will contact the applicant. The applicant need not call for inspections. The inspection may include but is not limited to general site planning and grading, outdoor lighting, parking, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Planning Department
Provide confirmation that improvements required by FMA-19-01, secured by check and SU-19-01 have been constructed and approved.
|
||
Miscellaneous Conditions | Resolved | Prior to Full Building Permit Issuance |
Planning Department
Per Condition 1 from FMA-10-91 has been met: Prior to issuance of building permit or grade and fill permit, and prior to the start of construction, the owner shall provide a contribution to the City for community amenities in an amount equal to one percent of the construction valuation of the permit.
|
||
Engineering Sf/Du CO Review | Open | Prior to Issuance of TCO/CO/CC |
Engineering
At the time of project completion, request the Final Site Inspection from the Department of Public Works Engineering Div. to ensure the project has been built in accordance with the approved plans. [Scott Slamal @ 04/09/2025 4:45 PM]
|
||
Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
Engineering
Prior to TCO approval please provide a Letter of Completion from the design engineering verifying the construction of the drainage and detention system. [Scott Slamal @ 04/09/2025 5:10 PM]
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
Receipt | ||
Letter | ||
Permit | PERMIT - DETAILED.PDF | |
Letter | PERMIT REVIEW CORRECTIONS NOTICE0.PDF | |
Receipt | RECEIPT.PDF | |
03/12/2025 | Study | 24-13444 Bear Claw Duplex - 2400 Ski Trail Lane - S&FI Report (Received) |
04/02/2025 | Response to Comments 2025_03_25 | |
04/17/2025 | Letter | BearClaw Lot11A 2025_04_14 response to comments |
04/21/2025 | Plans | Utility Plan 2025_04_14 (Stamped) |
04/21/2025 | Plans | Architectural 2025_02_12 (Received) (Stamped) |
04/21/2025 | Plans | Structurals (Stamped) |
04/21/2025 | Plans | CSMP 2025_03_25 (Stamped) |
04/21/2025 | Plans | Site Plan 2025_04_14 (Stamped) |