Summary

SPRRN251231
Alteration
Closed
CITY OF STEAMBOAT SPRINGS
Alteration
B - Business
Minor reconfiguration and renovation of north wing for HR and legal department. Includes paint, carpeting, lighting, minor door/wall modifications, and overall refresh of the space.
08/14/2025
08/26/2025
08/26/2028

Locations

Property
145014004

Address
124 10TH ST

Permits

Permit Number: SPRRN251231-BD1

Building
Finaled

Reviews

Review Type Outcome Est. Completion Date Completed
COO Review - Building Code Failed 10/24/2025 10/24/2025
COO Review - Fire Code Approved 10/28/2025 10/22/2025
COO Review - Finance Department Approved 10/28/2025 10/21/2025
Finance Department Review Approved 08/26/2025 08/25/2025
Historic Preservation Review Approved 08/26/2025 08/25/2025
Fire Code Review Approved 08/26/2025 08/22/2025
Engineering Review Approved 08/26/2025 08/21/2025
Building Code Review Approved 08/26/2025 08/21/2025
Planning Review Approved 08/26/2025 08/20/2025

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Framing Inspection Passed 9/2/2025 9/2/2025 09/02/2025
Ron Norton
Framing Inspection Partial Pass 9/18/2025 9/18/2025 09/18/2025
Todd Carr
Building Final Inspection Not Ready 10/21/2025 10/21/2025 10/21/2025
Heidi Spengler
Building Final Inspection Partial Pass 10/21/2025 10/22/2025 10/22/2025
Todd Carr
Corrections:


Building Department Corrections to be Completed
Carried Forward
10/22/2025
Building Department Corrections to be Completed: 1. Please correct door that is in the far southeast office that is rubbing on the carpet currently when the door is closed, then add all door hardware in terms of strike/latch plates on door jambs that are missing. 2. Install all ceiling tiles. 3. Schedule a mechanical final inspection when you schedule the next building final, we can then review the total CFMs being delivered to the new office once the units are adjusted and balanced. This small office space at about 140 SQ FT would only need around 45 CFM.

Building Final Inspection Passed 10/24/2025 10/24/2025 10/24/2025
Todd Carr
Corrections:


Building Department Corrections to be Completed
Resolved
10/24/2025
Building Department Corrections to be Completed: 1. Please correct door that is in the far southeast office that is rubbing on the carpet currently when the door is closed, then add all door hardware in terms of strike/latch plates on door jambs that are missing. 2. Install all ceiling tiles. 3. Schedule a mechanical final inspection when you schedule the next building final, we can then review the total CFMs being delivered to the new office once the units are adjusted and balanced. This small office space at about 140 SQ FT would only need around 45 CFM.

Conditions

Condition Status Category
Use Tax Reconciliation Resolved Prior to Issuance of CO/CC
Finance
Use Tax Recon work must be completed with City Finance: Contact the city directly for more information @ constructionusetax@steamboatsprings.net
Fire Assemblies Deferred Submittal Resolved Prior to Rough Building Wall Inspections
Fire Prevention
Conditionally Approved – NO INSPECTIONS pending submittal of Fire Alarm permits by sub-contractor to Fire Prevention. Visit www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms. [Shannon Yaconiello @ 08/25/2025 3:05 PM]
Final Fire Inspection Required Resolved Prior to Issuance of CO/CC
Fire Prevention
Final Fire Alarm Inspection Required. [Shannon Yaconiello @ 08/25/2025 3:05 PM]
Building Department Conditions to be Completed Resolved Prior to Issuance of CO/CC
Building Department
Mechanical Contractor who added the supply line to the new office that was created, did not apply for a Mechanical Permit, please apply for this permit. The Final Inspection has been completed today when I did the building final, however we must have a mechanical permit applied for and issued so we can enter our results. Please email me once this permit has been issued, and I will enter the results. [Todd Carr @ 10/24/2025 11:02 AM]

Related Permit & Planning Applications

Reference Number Status Type
SPREL251323 Closed Electrical
SPRMH251720 Closed Mechanical

Documents & Images

Date Uploaded File Type Name
Plans ARCHITECTURAL PLAN SET 124 10TH STREET 8-14-25 (RECEIVED) (STAMPED).PDF
Letter CERTIFICATE OF COMPLETION.PDF
Plans CONSTRUCTION SITE MANAGEMENT PLAN - CENTENNIAL HALL - GRATACON (STAMPED).PDF
ELECTRICAL PLANS (STAMPED).PDF
Letter INCOMPLETE APPLICATION NOTICE.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT0.PDF
Letter PERMIT - DETAILED.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF

Contact Us

  1. 115 10th Street

  2. Steamboat Springs, CO 80487

  3. Phone:  970-879-2060

  4. Hours

  5. Mon-Thurs: 7:30am-5:30pm

  6. Friday: 7:30am-11:30am

Government Websites by CivicPlus®