SPRFO240628
|
Foundation Repair/Retaining Wall/Tower/Light Pole/Abutment
|
New
|
Permit(s) Issued
|
06/24/2024
|
|
:
:
Two new retaining walls along the driveway for 'The Amble' project located at 2300 Mt Werner Circle. The first approximately 225ft long and 6' high. The Second approximately 150ft long and 6' high.
|
SPREL240223
|
Electrical
|
Replacement
|
Closed
|
03/18/2024
|
|
:
:
STEAMBOAT GRAND LIGHTING P24004
Replacement of lighting in common areas.
|
SPRPL240210
|
Plumbing
|
Replacement
|
Closed
|
03/14/2024
|
|
:
:
This a brief narrative requesting a building permit, for construction work to occur at the mentioned building during 2024. The projected work will occur from 4/25/2024 to 11/17/2024. The work to be performed is an extensive piping replacement. The following contractors will be working on the project Haselden Construction, Steamboat Springs, CO. Falcon Plumbing and Heating, Grand Junction, CO.
The following work will be performed during this period:
Plumbing
• Make safe existing plumbing piping for removal by others.
• Replace existing galvanized domestic cold, hot and recirc mains with schedule 10 stainless steel pipe and stainless steel fittings.
• New piping to be installed on existing points of connect in the mechanical room, parking garage and on levels two and five.
• Reconnect new pipe to the existing points of connections in the ceiling of the parking garage, commercial spaces, kitchen and laundry.
• Piping take offs less than 2” from the new stainless steel pipe to be type L copper with prepress fittings and new ball valves. Copper piping to be tied to the existing copper piping in the corridors of level two and five
• Remove existing balance valves on he domestic recirc system and replace with new circuit solvers.
Mechanical Rooms
• Remove existing water softener system and install new Thermostatic mixing valves.
• Install new backflow preventer on the domestic cold main where it enters the building. Provide and install 6 pumps.
• Remove existing galvanized pipe and replace with schedule 10 stainless steel and mechanical couplings.
Piping insulation
• Re-insulate all new piping with fiberglass insulation and pie shields.
|
SPRGR231782
|
Grade and Fill
|
New
|
Permit(s) Issued
|
04/01/2024
|
|
:
:
Work associated with Planning Application PL20220623.
|
SPRRF231020
|
Roof
|
Replacement
|
Permit(s) Issued
|
08/29/2023
|
|
:
:
Replacing a total of 40 SQ of Asphalt shingle (4 different sections) with new Asphalt shingle and 100% ice and water shield underneath.
|
SPRRN230688
|
Alteration
|
Alteration
|
Closed
|
07/07/2023
|
|
:
:
Plumbing system renovation to the Steamboat Grand Hotel/Condominiums. We have to removed drywall only to access cavities to install new water lines.
|
SPRPL220346
|
Plumbing
|
Replacement
|
Closed
|
04/07/2022
|
|
:
:
This is a brief narrative requesting a building permit, for construction work to occur at the mentioned building during the
month of April 2022. The projected work will occur from 4/13/2022 thru 4/29/2022. The work to be performed is
preliminary to the extensive piping replacement project to occur in the near future, under a separate permit. This scope
of work is limited to repairing existing piping and piping investigative efforts only.
The following contractors will be working on the project:
Haselden Construction, Steamboat Springs CO.
Falcon Plumbing and Heating, Grand Junction CO.
The following work will be performed during this period.
1. Repair pipe leak in boiler room.
a. Copper piping
b. Ball valve.
c. Pressure reducing valve.
d. Pipe supports @ 10’-0” o/c.
e. 1-1/2” pipe insulation.
2. Limited pipe insulation removal in the mechanical/boiler room.
3. Existing piping investigation to determine pipe conditions both internally and externally on Levels 2 and 5. This
will consist of removing one pipe elbow on each level to get a visual on internal pipe condition.
4. Repair leaking pipe on level 5.
a. Copper piping
b. Couplings
c. Pipe supports @ 10’-0” o/c.
d. 1-1/2” pipe insulation
5. There will be no drywall removal, repair work during the work at this time.
|
P-19-192
|
Plumbing
|
|
Closed
|
05/20/2019
|
|
:
:
Work Description: Install meter and backflow
|
P-18-414
|
Plumbing
|
|
Closed
|
11/15/2018
|
|
:
:
Work Description: Water meter and backflow preventer
|
E-18-506
|
Electrical
|
|
Closed
|
10/16/2018
|
|
:
:
Work Description: Provide temp power, install service to new barn location, and install site lighting.
|
B-18-740
|
Alteration
|
Alteration
|
Closed
|
10/09/2018
|
|
:
:
Work Description: Replace manual swing entrance doors with automatic sliding entrance doors
BedroomsNoEx: 0
BedroomsNoProp: 0
HeightofConstructionEx: 0.00
HeightofConstructionProp: 0.00
LivingAreaEx: 0.00
LivingAreaProp: 0.00
SignLength: 0.00
SignWidth: 0.00
StoriesNoEx: 0
StoriesNoProp: 0
TotalAreaEx: 0.00
TotalAreaProp: 0.00
|
M-18-368
|
Addition
|
Addition
|
Closed
|
07/31/2018
|
|
:
:
Work Description: Adding 1600 Sq Ft of Snowmelt To Existing System at Mt Werner Circle & Ski Time Square Roundabout
|
B-18-346
|
Building
|
|
Closed
|
08/23/2018
|
|
:
:
Work Description: New foundation and excavation for the Arnold Barn to sit on at the base of Mount Werner Circle.
BedroomsNoEx: 0
BedroomsNoProp: 0
HeightofConstructionEx: 0.00
HeightofConstructionProp: 0.00
LivingAreaEx: 0.00
LivingAreaProp: 0.00
SignLength: 0.00
SignWidth: 0.00
StoriesNoEx: 2
StoriesNoProp: 0
TotalAreaEx: 0.00
TotalAreaProp: 0.00
|
P-15-002-S
|
Plumbing
|
|
Closed - Incomplete Submittal
|
04/14/2015
|
|
:
:
ApplicationID: SP-15-002
Work Description: adding bathroom
|
B-15-042-S
|
Building
|
|
Closed
|
03/25/2015
|
|
:
:
ApplicationID: SB-15-042
Work Description: CONSTRUCT NEW SIDEWALK
|
B-14-414-S
|
Building
|
|
Closed - Incomplete Submittal
|
10/23/2014
|
|
:
:
ApplicationID: SB-14-414
Work Description: INSTALL A NEW FALL PROTECTION SYSTEM ON MAIN RIDGE OF BUILDING
BedroomsNoEx: 0
BedroomsNoProp: 0
HeightofConstructionEx: 0.00
HeightofConstructionProp: 0.00
LivingAreaEx: 0.00
LivingAreaProp: 0.00
SignLength: 0.00
SignWidth: 0.00
StoriesNoEx: 0
StoriesNoProp: 0
TotalAreaEx: 0.00
TotalAreaProp: 0.00
|
B-14-134-S
|
Building
|
|
Closed - Incomplete Submittal
|
04/30/2014
|
|
:
:
ApplicationID: SB-14-134
Work Description: REPAIR ROOF
BedroomsNoEx: 0
BedroomsNoProp: 0
HeightofConstructionEx: 0.00
HeightofConstructionProp: 0.00
LivingAreaEx: 0.00
LivingAreaProp: 0.00
SignLength: 0.00
SignWidth: 0.00
StoriesNoEx: 0
StoriesNoProp: 0
TotalAreaEx: 0.00
TotalAreaProp: 0.00
|
M-14-032-S
|
Mechanical
|
|
Closed - Incomplete Submittal
|
04/22/2014
|
|
:
:
ApplicationID: SM-14-032
Work Description: NEW GAS LINE
|
M-14-025-S
|
Mechanical
|
|
Closed - Incomplete Submittal
|
04/03/2014
|
|
:
:
ApplicationID: SM-14-025
Work Description: REPLACING HOOD
|
B-12-108-S
|
Building
|
|
Closed
|
06/08/2012
|
|
:
:
ApplicationID: SB-12-108
Work Description: TENANT FINISH
WINTER DRIVING SCHOOL
|
B-11-292-S
|
Building
|
|
Closed
|
10/20/2011
|
|
:
:
ApplicationID: SB-11-292
Work Description: ROOF REPAIRS/SNOW FENCING/HEAT CABLES
|
B-11-073-S
|
Building
|
|
Closed - Incomplete Submittal
|
05/20/2011
|
|
:
:
ApplicationID: SB-11-073
Work Description: ALTERATION TO THE CABIN RESTAURANT
|
B-11-054-S
|
Building
|
|
Closed
|
06/28/2011
|
|
:
:
ApplicationID: SB-11-054
Work Description: RELOCATE ADA ACCESS DOOR
|
B-11-053-S
|
Building
|
|
Closed
|
04/22/2011
|
|
:
:
ApplicationID: SB-11-053
Work Description: DEMO IN CABIN RESTAURANT
|
B-10-392-S
|
Building
|
|
Closed
|
12/10/2010
|
|
:
:
ApplicationID: SB-10-392
Work Description: INTERIOR ALTERATION
SWITCH ENTRY DOOR AND WINDOW
|
B-10-388-S
|
Building
|
|
Closed
|
12/02/2010
|
|
:
:
ApplicationID: SB-10-388
Work Description: TENANT FINISH - UNIT C-8A
POWDER PURSUITS
|
B-10-367-S
|
Building
|
|
Closed
|
12/14/2010
|
|
:
:
ApplicationID: SB-10-367
Work Description: POOL ROOM AND KITCHEN EXPANSION (C-6)
|
B-10-359-S
|
Building
|
|
Closed
|
12/09/2010
|
|
:
:
ApplicationID: SB-10-359
Work Description: TENANT FINISH FOR STORAGE/BIKE RENTAL
UNIT C-7A
|
B-10-317-S
|
Building
|
|
Closed
|
09/23/2010
|
|
:
:
ApplicationID: SB-10-317
Work Description: TENANT FINISH (RESTAURANT/BAR)
UNIT C5
|
B-10-271-S
|
Building
|
|
Closed
|
09/13/2010
|
|
:
:
ApplicationID: SB-10-271
Work Description: REMODEL
ADD 3 INTERIOR, NON STRUCTURAL WALLS, MOVE SINK AND ADD ELEC OUTLETS
|
B-10-258-S
|
Building
|
|
Closed
|
10/05/2010
|
|
:
:
ApplicationID: SB-10-258
Work Description: TENANT FINISH
LIQUOR STORE & SHELL FOR POWDER PERSUITS
|
B-10-095-S
|
Building
|
|
Closed
|
04/14/2010
|
|
:
:
ApplicationID: SB-10-095
Work Description: TENANT FINISH, CONVENIENCE STORE
UNIT C7
|
B-10-036-S
|
Building
|
|
Closed
|
03/24/2010
|
|
:
:
ApplicationID: SB-10-036
Work Description: TENANT FINISH (RESTAURANT/BAR)
UNIT C5
|
B-09-431-S
|
Building
|
|
Closed
|
11/16/2009
|
|
:
:
ApplicationID: SB-09-431
Work Description: TENANT FINISH - RESTAURANT
UNIT C8-B
|
B-09-039-S
|
Building
|
|
Closed
|
04/09/2009
|
|
:
:
ApplicationID: SB-09-039
Work Description: TENANT FINISH, RESTAURANT/BAR
|
B-08-644-S
|
Building
|
|
Closed
|
12/03/2008
|
|
:
:
ApplicationID: SB-08-644
Work Description: TENANT FINISH, UNIT C5
|
B-08-432-S
|
Building
|
|
Closed
|
09/12/2008
|
|
:
:
ApplicationID: SB-08-432
Work Description: ADD LOFT STORAGE AREA - C-5
|
B-08-433-S
|
Building
|
|
Closed
|
09/12/2008
|
|
:
:
ApplicationID: SB-08-433
Work Description: ADD LOFT STORAGE AREA - UNIT C-6
|
B-08-434-S
|
Building
|
|
Closed
|
09/12/2008
|
|
:
:
ApplicationID: SB-08-434
Work Description: ADD LOFT STORAGE AREA - UNIT C-7
|
E-08-020-S
|
Electrical
|
|
Closed - Incomplete Submittal
|
04/18/2008
|
|
:
:
ApplicationID: SE-08-020
Work Description: RUNNING POWER TO CONSTRUCTION OFFICE TRAILERS
|
B-07-760-S
|
Building
|
|
Closed
|
11/16/2007
|
|
:
:
ApplicationID: SB-07-760
Work Description: TENANT FINISH- SALES OFFICE
|
B-07-489-S
|
Building
|
|
Closed
|
08/29/2007
|
|
:
:
ApplicationID: SB-07-489
Work Description: INTERIOR ALTERATION
|
B-06-550-S
|
Building
|
|
Closed
|
08/15/2006
|
|
:
:
ApplicationID: SB-06-550
Work Description: INSTALLING PLUMBING AND ELECTRICAL FOR A BEAUTY SALON;
TENANT FINISH FOR SCRUPLES SALON, UNIT 6-C
|
B-06-468-S
|
Building
|
|
Closed
|
07/20/2006
|
|
:
:
ApplicationID: SB-06-468
Work Description: CONVERT ONE OFFICE AT THE GRAND INTO THREE, MAIN FLOOR, SOUTH END. C-12
|
B-06-343-S
|
Building
|
|
Closed
|
07/12/2006
|
|
:
:
ApplicationID: SB-06-343
Work Description: TENANT FINISH FOR UNIT C-4, GRAND SUMMIT RESORT FOR "VERTICAL" CLOTHING STORE. - NO PLUMBING OR MECH
|
E-05-129-S
|
Electrical
|
|
Closed
|
|
|
:
:
ApplicationID: SE-05-129
Work Description: INSTALLING CONDUIT FROM THE GRAND'S MDP TO STUB0OUT LOCATIONS FOR 10 OTHER UNITS FOR FUTURE SERVICE.
|
B-05-720-S
|
Building
|
|
Closed
|
11/21/2005
|
|
:
:
ApplicationID: SB-05-720
Work Description: TENANT FINISH; CHOCOLATE SOUP
|
B-03-801-S
|
Building
|
|
Closed
|
12/05/2003
|
|
:
:
ApplicationID: SB-03-801
Work Description: ADDING ONE WALL IN ROOM (PREVIOUSLY THE ARCADE) TO MAKE OFFICE/STORAGE SPACE. NO CHANGE TO LIGHTING
|
B-03-731-S
|
Building
|
|
Closed
|
10/30/2003
|
|
:
:
ApplicationID: SB-03-731
Work Description: DEMO INTERIOR WALLS AND REBUILD WALLS TO REMOVE THE EXISTING DAYCARE AND ADD A NEW MASSAGE ROOM.
|
B-03-636-S
|
Building
|
|
Closed
|
09/30/2003
|
|
:
:
ApplicationID: SB-03-636
Work Description: ADDING 3 WALLS TO EXISTING STRUCTURE FOR STORAGE
|
M-02-306-S
|
Mechanical
|
|
Closed - Incomplete Submittal
|
12/20/2002
|
|
:
:
ApplicationID: SM-02-306
Work Description: INSTALL THE HEAT EXCHANGER (HEX) THAT WAS ON THE ORIGINAL SET OF PLANS BUT NEVER INSTALLED UNDER THE
|
E-00-255-S
|
Electrical
|
|
Closed
|
09/15/1900
|
|
:
:
ApplicationID: SE-00-255
Work Description: 5041
|
M-99-114-S
|
Mechanical
|
|
Closed
|
04/30/1999
|
|
:
:
ApplicationID: SM-99-114
Work Description: HOTEL 7&CONFERENCE CENTER
|
B-98-205-S
|
Building
|
|
Closed
|
04/29/1999
|
|
:
:
ApplicationID: S-98-205
Work Description: HOTEL W/7 FLOORS
StoriesNoEx: 7
|