Permit Application Status

SPRGR231782


In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

SPRGR231782
Grade and Fill
Permit(s) Issued
STEAMBOAT GRAND RESORT HOTEL
New
Work associated with Planning Application PL20220623.
12/18/2023
04/01/2024
04/01/2027

Locations

Property
218177001

Address
2300 MT WERNER CIR

Permits

Permit Number: SPRGR231782-GR1

Grade and Fill
Issued

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 04/08/2024 04/01/2024
Construction Stormwater Review Approved 03/21/2024 03/25/2024
Utilities Review - Mt. Werner Approved 03/21/2024 03/21/2024
Planning Review Failed 03/21/2024 03/21/2024
Engineering Review Approved 03/21/2024 03/19/2024
Engineering Review Failed 02/22/2024 02/27/2024
Construction Stormwater Review Failed 02/22/2024 02/22/2024
Construction Site Management Review Approved 02/22/2024 02/22/2024
Utilities Review - Mt. Werner Failed 02/22/2024 02/22/2024
Planning Review Failed 02/22/2024 02/14/2024
Engineering Review Failed 01/05/2024 01/08/2024
Utilities Review - Mt. Werner Failed 01/05/2024 01/04/2024
Construction Site Management Review Failed 01/05/2024 01/03/2024
Construction Stormwater Review Failed 01/05/2024 01/03/2024
Planning Review Failed 01/05/2024 12/29/2023
Finance Department Review Approved 01/05/2024 12/26/2023
Building Code Review Approved 01/05/2024 12/21/2023

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Water Service Inspection Pending
Amber Gregory
Sewer Service Inspection Pending
Amber Gregory
Interim Construction Site Management Pending
Scott Slamal
Final Construction Site Management Pending
Scott Slamal
Final Engineering Site Inspection Pending
Emrick Soltis, P.E., CFM

Conditions

Condition Status Category
Miscellaneous Conditions Open Prior to Final Grading Inspection
Building Department
Informational: I have set conditions for the Grade and Fill that does not include items present in the plans. It is the responsibility of the installer of Redirock walls shown on Sheets C.300, C.320, C321 or any retaining walls other than those 4-ft maximum (exempt from permit). Designer of the retaining wall systems to submit under separate building permit, no items shall be installed until the submittal documents have been submitted to RCRBD for review and approved.
Vested Approval Conditions Resolved Prior to Full Building Permit Issuance
Planning Department
Compliance with PL20220623 conditions of approval # 6, 7, 8, 10, 11 required.
Vested Approval Conditions Resolved Prior to Full Building Permit Issuance
Planning Department
Compliance with PL20220479 conditions of approval # 3, 4, 6, 8 required.
Water/Sanitary Acceptance Resolved Prior to Full Building Permit Issuance
Mount Werner Water & Sanitation
A signed copy of the Request for Water and Sewer service agreement needs to be provided to Mt. Werner Water prior to approval; link to form listed below. https://www.mwwater.com/wp-content/uploads/requestforservice.pdf
Engineering Com/Ind/MF CO Review Open Prior to Issuance of TCO/CO/CC
Engineering
At the time of project completion, an Improvement Summary Letter or Completion Letter signed and sealed by the Engineer of Record shall be uploaded to the associated building permit in CityView Portal against the applicable condition. Upon receipt of the letter, Engineering will review and perform a Final Site Inspection for the TCO/CO request.
PWQ O&M prior to CO/CC Open Prior to Issuance of CO/CC
Engineering
An executed Ownership and Maintenance Agreement for the Permanent Water Quality Treatment Facility shall be recorded prior to Certificate of Occupancy/Completion. The agreement will be processed via a new Permanent Water Quality Treatment Facility Registration License application. For more information on that process, refer to the link provided. https://www.steamboatsprings.net/1336/CityView-FAQ
Pre-Construction Mtg Reqd Resolved Within 30 days of Building Permit Issuance
Engineering
Pre-construction meeting shall be to be scheduled prior to start of construction.
MF/Com/I Planning CO Review Open Prior to Issuance of TCO/CO/CC
Planning Department
At the time of project completion, request certificate of occupancy inspections from the Department of Planning and Community Development to ensure the project has been built in accordance with the approved plans and the Community Development Code. The inspection may include but is not limited to general site planning and grading, landscaping and revegetation, outdoor lighting, parking and parking lot striping, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
Letter PERMIT - DETAILED.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
12/18/2023 Form 231130 The Amble - CSMP Checklist
12/18/2023 Letter 231214 The Amble - Grade and Fill Permit Checklist_X
12/18/2023 221220 The Amble Geotech Report R1
12/18/2023 230407 The Amble - Stacked Block Retaining Wall Recommendations and Plan
01/09/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
02/13/2024 231215 The Amble Final Drainage Report
02/13/2024 240209 The Amble Permit Comment Response Narrative
02/28/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
03/15/2024 240315 SteamboatConstructionStormwaterPermit_Signed
03/25/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
04/01/2024 Plans 231215 The Amble - Existing Conditions Plan (Received) (Stamped)
04/01/2024 Plans 240209 The Amble Updated Civil (Received) (Stamped)
04/01/2024 Plans 231215 The Amble - Grading & Drainage Plan (Stamped)
04/01/2024 Plans 240205 The Amble CSMP (Stamped)