Date Returned | Name |
---|---|
SSRC GONDOLA PLAZA WALK-IN PERMIT DWGS 12-6-2021 STAMPED (RECEIVED).PDF |
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
COO Review - Building Code | Approved | 02/27/2024 | 02/28/2024 |
Heidi Spengler
|
|||
All building complete. | |||
COO Review - Finance Department | Approved | 03/05/2024 | 02/27/2024 |
Sondra Spratta
|
|||
Review for CC. | |||
Building Code Review | Approved | 12/20/2021 | 12/14/2021 |
Todd Carr
|
|||
stair/landing RFI approved with flame off product | |||
Finance Department Review | Approved | 12/09/2021 | 12/07/2021 |
Todd Carr
|
|||
Temporary approval so Ski Corp can move forward with work, Todd Carr 12/07/2021. City Finance reserves the right to add conditions or change fees if needed. | |||
Fire Code Review | Approved | 12/09/2021 | 12/07/2021 |
Mike Middleton
|
|||
Sprinkler plans by sub-contractor must be submitted to Fire Prevention. | |||
Planning Review | Approved | 12/09/2021 | 12/07/2021 |
Michael Fitz
|
|||
Per Kate at ESA, this area was not part of the original parking garage (it is not required parking) but rather leftover space from the demolition of building B. | |||
Building Code Review | Approved | 12/09/2021 | 12/07/2021 |
Todd Carr
|
|||
See Document Markups
Resolved
12/07/2021
RCRBD approval is conditional under temporary structures for the walk-in-cooler and landing/staircase for the winter ski season of 21/22, the cooler and landing/stairs to be removed by May 1st, 2022, future construction work under permits next summer will reconfigure the landing and stairs, and the cooler will be completely removed.
|
|||
See Document Markups
Resolved
12/07/2021
RCRBD requires separate electrical and mechanical permits to be applied for under this building permit once it's issued.
|
|||
Permit approved under temporary buildings, the walk-in cooler and stairs landing to be removed by May 1st, 2022. |
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Building Final Inspection | Failed | 12/20/2021 | 12/20/2021 | 12/20/2021 |
Todd Carr | ||||
Corrections:
Miscellaneous
Carried Forward
12/20/2021
Need to complete the fire intumescent application on the wooden ramp built to access the cooler, all other areas have been completed. Also need to fire caulk and seal up all penetrations through the exterior concrete wall related to the walk-n-cooler. Handrail installed on wood stairs is not approved, we need to have 1 1/2" clearance to wrap your hand around the handrail, currently only have 1" on both sides, extend this out or cut back the 2x6 top piece to allow handrail clearances.
|
||||
Building Final Inspection | Passed | 2/22/2024 | 2/26/2024 | 02/26/2024 |
Jeff Yeiser | ||||
Corrections:
Miscellaneous
Resolved
02/26/2024
Need to complete the fire intumescent application on the wooden ramp built to access the cooler, all other areas have been completed. Also need to fire caulk and seal up all penetrations through the exterior concrete wall related to the walk-n-cooler. Handrail installed on wood stairs is not approved, we need to have 1 1/2" clearance to wrap your hand around the handrail, currently only have 1" on both sides, extend this out or cut back the 2x6 top piece to allow handrail clearances.
|
Condition | Status | Category |
---|---|---|
Miscellaneous Conditions | Resolved | Prior to Issuance of CO/CC |
Building Department
05/01/2022
This permit and walk-in-cooler including the landing and stairs that lead to the exterior area outside of the parking garage are approved as temporary building/structures and must be removed by May 1st, 2023.
|
||
Miscellaneous Conditions | Resolved | Prior to Rough Building Wall Inspections |
Fire Prevention
Conditionally Approved – pending deferred submittal of sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net.
Full Permit - Received sprinkler permit 12/17/21.
|
||
Miscellaneous Conditions | Resolved | Prior to Issuance of TCO/CO/CC |
Fire Prevention
Must pass final sprinkler inspection before CC sign-off.
|
||
Building Department Conditions to be Completed | Resolved | Prior to Issuance of CO/CC |
Building Department
Building Department Conditions to be Completed
Need to complete the fire intumescent application on the wooden ramp built to access the cooler, all other areas have been completed. Also need to fire caulk and seal up all penetrations through the exterior concrete wall related to the walk-n-cooler. Handrail installed on wood stairs is not approved, we need to have 1 1/2" clearance to wrap your hand around the handrail, currently only have 1" on both sides, extend this out or cut back the 2x6 top piece to allow handrail clearances.
|
||
Use Tax Reconciliation | Resolved | Prior to Issuance of CO/CC |
Finance
Use Tax Reconciliation
|
Reference Number | Status | Type |
---|---|---|
SPREL210745 | Closed | Electrical |
SPRAB210782 | Permit(s) Issued | Accessory Building |
Date Uploaded | File Type | Name |
---|---|---|
Letter | CERTIFICATE OF COMPLETION.PDF | |
Letter | CERTIFICATE OF TEMPORARY OCCUPANCY.PDF | |
Letter | CERTIFICATE OF TEMPORARY OCCUPANCY.PDF | |
Letter | CERTIFICATE OF TEMPORARY OCCUPANCY.PDF | |
Letter | CERTIFICATE OF TEMPORARY OCCUPANCY.PDF | |
Letter | CERTIFICATE OF TEMPORARY OCCUPANCY.PDF | |
Letter | CERTIFICATE OF TEMPORARY OCCUPANCY.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Letter | PERMIT - DETAILED.PDF | |
Receipt | RECEIPT.PDF | |
Receipt | RECEIPT.PDF | |
Plans | SSRC GONDOLA PLAZA WALK-IN PERMIT DWGS 12-6-2021 STAMPED (RECEIVED).PDF |