Planning Application Status
PL20220123
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
There are no hearings for this planning application.
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Infrastructure Before Plat | Open | Prior to Recording of Final Plat |
Mount Werner Water & Sanitation
The infrastructure shown on the Preliminary Plat shall be constructed and approved and/or accepted or surety provided prior to recording of a Final Plat for Hotel A.
|
||
Floodplain Development Permit | Open | Prior to Issuance of Construction Permit |
Planning Department
Prior to Building Permit or Grade and Fill Permit issuance, the owner shall receive approval of a Floodplain Development Permit.
|
||
Miscellaneous Condition | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
The existing sign structures on the property are legal nonconforming and meet the applicability criteria for termination in accordance with CDC Section 500.D and shall be removed prior to CO for the first new use of the property.
|
||
Miscellaneous Condition | Open | |
Planning Department
See informational comments from Planning and Public Works in the documents and images panel.
|
||
Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
Planning Department
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first: • Water and Sewer infrastructure • Access drive, driveway, and parking areas • Drainage improvements • Permanent storm water quality treatment facilities
|
||
Wetland Permit prior to Civils | Resolved | Prior to Approval of Civil Construction Plans or Overlot Grading Plans |
Planning Department
Prior to approval of Civil Construction Plans, an approved Army Corp of Engineers permit for modifications to the wetlands/waters of the state shall be submitted to the City.
|
||
Civils Required | Open | Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat |
Engineering
Civil Construction Plans prepared by a licensed Colorado civil engineer must be approved prior to approval of any Improvements Agreement, Building Permit, Grading Permit, or Final Plat and prior to the start of any construction.
|
||
PWQ O&M prior to CO/CAC | Open | Prior to Issuance of CO/CC |
Engineering
Prior to Certificate of Occupancy/Completion, an Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
|
||
Draft Easements Prior to Civils | Open | Prior to Approval of Civil Construction Plans or Overlot Grading Plans |
Engineering
Prior to approval of Civil Construction Plans or Overlot Grading Plans, the owner shall provide approved final draft documents to the City for the following required easements: • Drainage easements to accommodate offsite drainage through the project site. • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Sidewalk and/or trail easements for public use sidewalks/trails. • Public access easements for public sidewalks which are not completely within the right-of-way. • Cross access easement per West/East Steamboat Springs US Highway 40 Access Study. • Water and sewer easements. • OTHERS
|
||
Record Drawings/CAD Files | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Record Drawings/CAD Files shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection
|
||
Completion Letter (Private Improv.) | Open | Prior to Engineering Final Approval Inspection |
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
|
||
Completion Letter (PSWQTF) | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
|
||
PWQ O&M prior to final approval | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a recorded Ownership & Maintenance Agreement shall be submitted.
|
||
Traffic Contribution prior to BP | Open | Prior to Issuance of Construction Permit |
Engineering
Prior to Building Permit issuance, the developer shall pay their proportionate share of potential future roadway and/or intersection improvements at US 40 @ Stone Lane intersection, calculated at 23.7% of current cost basis $674,221 (indexed to CDOT CCI) or $159,790. In addition, the developer shall pay their proportionate share of potential future roadway and/or intersection improvements for Stone Lane bridge, calculated at 8.7% of current cost basis $4,682,095 (indexed to CDOT CCI) or $407,342.
|
||
Miscellaneous Condition | Open | |
Parks and Recreation
Improved trail connectivity will benefit guests/residents at the site. All on site trails to be maintained by property (not City).
|
||
Miscellaneous Condition | Open | Prior to Certificate of Occupancy/Completion |
Planning Department
Critical improvements and phasing shall be consistent with projects PL20220209, PL20220062, and PL20220061.
|