Engineering Permit Application Status
SPRSW231375
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Construction Stormwater Review | Approved | 10/16/2023 | 11/15/2023 |
Scott Slamal
|
|||
Miscellaneous
Outstanding
11/15/2023
1. Update City Construction Stormwater Permit form to accurately reflect responsible individuals including the qualified stormwater manager. Sign permit and upload to cityview.
2. Describe control measures for dust control.
3. Further describe tracking control measures.
4. On-site waste management practices must include more than one dumpster. Define "good housekeeping practices."
5. Due to the likely hood of encountering groundwater, a de-watering plan is required as part of this SWMP.
6. Include control measure specification sheets from MHFD for all proposed control measures.
|
|||
Construction Stormwater Review | Failed | 10/16/2023 | 11/07/2023 |
Scott Slamal
|
|||
Miscellaneous
Carried Forward
11/15/2023
1. Update City Construction Stormwater Permit form to accurately reflect responsible individuals including the qualified stormwater manager. Sign permit and upload to cityview.
2. Describe control measures for dust control.
3. Further describe tracking control measures.
4. On-site waste management practices must include more than one dumpster. Define "good housekeeping practices."
5. Due to the likely hood of encountering groundwater, a de-watering plan is required as part of this SWMP.
6. Include control measure specification sheets from MHFD for all proposed control measures.
|
|||
Construction Stormwater Review | Failed | 10/16/2023 | 10/24/2023 |
Scott Slamal
|
|||
Miscellaneous
Carried Forward
11/07/2023
1. Update City Construction Stormwater Permit form to accurately reflect responsible individuals including the qualified stormwater manager. Sign permit and upload to cityview.
2. Sheet C17 (Site Plan) as referenced in the SWMP, is not included with the submitted documents.
3. Describe proposed control measures used for Land disturbance and storage of soils.
3. Describe proposed type of VTC.
4. Describe control measures for loading and unloading.
5. Describe control measures for material storage and stockpiles.
6. On-site waste management practices must include more than one dumpster.
7. Due to the likely hood of encountering groundwater, a de-watering plan is required as part of this SWMP.
8. Include control measure specification sheets for all proposed control measures.
|
|||
Construction Stormwater Review | Failed | 10/16/2023 | 10/11/2023 |
Scott Slamal
|
|||
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Final Construction Stormwater | Pending | |||
Scott Slamal | ||||
Interim Construction Stormwater | Pending | |||
Scott Slamal | ||||
45 Day Inspection | Pending | 5/30/2025 | ||
Scott Slamal | ||||
Corrections:
Miscellaneous
Outstanding
04/16/2025
Trash and building particles were observed at various locations around the site identified during the inspection. Trash is required to be picked up throughout the site daily and disposed of properly.
|
||||
Miscellaneous
Outstanding
04/16/2025
Installation of additional temporary stabilization was needed along the barren section of slope along the road on the east perimeter between the top of the road and the edge of the currently installed erosion control blanket. Temporary soil stabilization is required on all portions of the site where grading and land disturbing activities are complete and on any portion of the site that is inactive for at least 14 days
|
||||
45 Day Inspection | Failed | 4/4/2024 | 04/04/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Failed | 4/5/2024 | 04/05/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Failed | 4/11/2024 | 04/11/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Passed | 4/12/2024 | 04/12/2024 | |
Scott Slamal | ||||
45 Day Inspection | Failed | 4/25/2024 | 04/25/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Passed | 5/3/2024 | 05/03/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Failed | 5/20/2024 | 05/20/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Failed | 6/3/2024 | 06/03/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Failed | 6/4/2024 | 06/04/2024 | |
Scott Slamal | ||||
Interim Construction Stormwater | Passed | 6/4/2024 | 06/07/2024 | |
Scott Slamal | ||||
45 Day Inspection | Failed | 7/17/2024 | 07/17/2024 | |
Scott Slamal | ||||
Corrections:
Trash
Carried Forward
07/18/2024
Trash must be picked up daily and disposed of correctly into trash receptacles.
|
||||
Tracking
Carried Forward
07/18/2024
Vehicle tracking controls were not adequate. Proper measures must be implemented immediately to minimizing tracking.
|
||||
45 Day Inspection | Failed | 8/26/2024 | 08/30/2024 | |
Scott Slamal | ||||
Corrections:
Trash
Carried Forward
09/03/2024
Trash must be picked up daily and disposed of correctly into trash receptacles. Trash was noted floating in the ponding dewatering water and at other locations on the southeast corner of the project.
|
||||
Tracking
Carried Forward
09/03/2024
Vehicle tracking controls were not adequate. Proper measures must be implemented immediately to minimizing tracking.
Aggregate tracking pads for commercial, industrial, and multifamily sites, shall be constructed of three-inch to eight-inch angular aggregate.
|
||||
45 Day Inspection | Failed | 12/8/2024 | 09/26/2024 | |
Scott Slamal | ||||
Corrections:
Trash
Carried Forward
10/24/2024
Trash must be picked up daily and disposed of correctly into trash receptacles. Trash was noted floating in the ponding dewatering water and at other locations on the southeast corner of the project.
|
||||
Tracking
Carried Forward
10/24/2024
Vehicle tracking controls were not adequate. Proper measures must be implemented immediately to minimizing tracking.
Aggregate tracking pads for commercial, industrial, and multifamily sites, shall be constructed of three-inch to eight-inch angular aggregate.
|
||||
45 Day Inspection | Failed | 1/24/2025 | 12/10/2024 | |
Scott Slamal | ||||
45 Day Inspection | Failed | 5/31/2025 | 04/16/2025 | |
Scott Slamal | ||||
Corrections:
Miscellaneous
Carried Forward
04/16/2025
Trash and building particles were observed at various locations around the site identified during the inspection. Trash is required to be picked up throughout the site daily and disposed of properly.
|
||||
Miscellaneous
Carried Forward
04/16/2025
Installation of additional temporary stabilization was needed along the barren section of slope along the road on the east perimeter between the top of the road and the edge of the currently installed erosion control blanket. Temporary soil stabilization is required on all portions of the site where grading and land disturbing activities are complete and on any portion of the site that is inactive for at least 14 days
|
There are no conditions for this engineering permit application, or you are not authorized to view them.
There are no related items for this engineering permit application.