| Date Returned | Name |
|---|---|
| 01/29/2025 | Architectural Plans 01-17-25 1900 Bridge Lane Unit 4 (Received) (Stamped) |
| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| COO Review - Planning | TCO Approved | 11/03/2025 | 10/27/2025 |
| COO Review - Planning | Failed | 02/05/2025 | 02/05/2025 |
| COO Review - Fire Code | Approved | 02/05/2025 | 02/04/2025 |
| Planning Review | Approved | 01/24/2025 | 01/29/2025 |
| GIS Land Development Review | Approved | 01/24/2025 | 01/27/2025 |
| Utilities Review - City | Approved | 01/24/2025 | 01/21/2025 |
| Fire Code Review | Approved | 01/24/2025 | 01/17/2025 |
| Building Code Review | Approved | 01/24/2025 | 01/17/2025 |
| Utilities Review - City | Approved | 11/14/2024 | 11/14/2024 |
| Planning Review | Failed | 11/14/2024 | 11/13/2024 |
| GIS Land Development Review | Approved | 10/24/2024 | 10/25/2024 |
| Utilities Review - City | Failed | 10/24/2024 | 10/25/2024 |
| Planning Review | Failed | 10/24/2024 | 10/24/2024 |
| Fire Code Review | Approved | 10/24/2024 | 10/21/2024 |
| Finance Department Review | Approved | 10/24/2024 | 10/17/2024 |
| Building Code Review | Approved | 10/24/2024 | 10/17/2024 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Drywall Inspection | Passed | 1/29/2025 | 1/29/2025 | 01/29/2025 |
| Todd Carr | ||||
| Building Final Inspection | Passed | 1/29/2025 | 1/29/2025 | 01/29/2025 |
| Todd Carr | ||||
| Condition | Status | Category |
|---|---|---|
| Miscellaneous Conditions | Resolved | Prior to Issuance of CO/CC |
|
Fire Prevention
Remodel with No alarm or sprinkler work.
Fire will need to do a walk thru inspection after construction is completed to make sure the fire alarm & sprinkler systems are operating correctly. Please call 970-871-8216 to schedule a walk thru. [Mike Middleton @ 10/21/2024 11:14 PM]
|
||
| MF/Com/I Planning CO Review | Resolved | Prior to Issuance of TCO/CO/CC |
|
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 7:50 AM]
|
||
| Vested Approval Conditions | Resolved | Prior to Issuance of CO/CC |
|
Planning Department
Compliance with PL20240033 conditions of approval required.
|
||
| Miscellaneous Conditions | Resolved | Prior to Issuance of TCO/CO/CC |
|
Public Works - Water and Sewer
Removal of shower and all piping must be inspected and confirmed by the building department
Final inspection done by Todd Carr to verify all plumbing has been completly removed and disconnected with respect to the shower that was installed in the past without permits, walls are closed back up with drywall and floor is closed up as well. [Todd Carr @ 01/29/2025 1:40 PM]
|
||
| Miscellaneous Conditions | Open | Prior to Issuance of CO/CC |
|
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 7:51 AM]
Site Inspection on 10/17 showed missing striping of two spaces along the Eastern property line, along with 2 missing ADA spaces. Prior to full CO, these issues must be resolved. [Jeremy Brown @ 10/27/2025 4:25 PM]
|
||
There are no related items for this permit application.
| Date Uploaded | File Type | Name |
|---|---|---|
| Letter | 30-DAY ADVANCE NOTICE OF PERMIT EXPIRATION.PDF | |
| Letter | CERTIFICATE OF TEMPORARY OCCUPANCY.PDF | |
| CERTIFICATE OF TEMPORARY OCCUPANCY0.PDF | ||
| CERTIFICATE OF TEMPORARY OCCUPANCY1.PDF | ||
| Letter | CERTIFICATE OF TEMPORARY OCCUPANCY2.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Permit | PERMIT - DETAILED.PDF | |
| Permit | PERMIT - DETAILED.PDF | |
| Receipt | RECEIPT.PDF | |
| Receipt | RECEIPT.PDF | |
| Receipt | RECEIPT.PDF | |
| 10/25/2024 | Letter | Permit Review Corrections Notice (Generate/Send Correction Notice) |
| 11/13/2024 | Plans | Architectural Plans 1900 Bridge Lane Unit 4 (Received) (1) |
| 11/14/2024 | Form | 1900BridgeLnUnit4PIF |
| 11/15/2024 | Letter | Permit Review Corrections Notice (Generate/Send Correction Notice) |
| 01/29/2025 | Plans | 1900 bridge lane Unit 4 Existing Floor Plan (Received) |
| 01/29/2025 | Plans | Architectural Plans 01-17-25 1900 Bridge Lane Unit 4 (Received) (Stamped) |