Sprinkler and alarm inspections passed. Ok for CC. [Shannon Yaconiello @ 03/18/2026 3:18 PM]
Building Code Review
Approved
10/10/2025
10/09/2025
Todd Carr
Electrical plans received and approved
Building Code Review
Approved
04/24/2025
04/17/2025
Todd Carr
Building Department Corrections to be Completed
Resolved
04/17/2025
Electrical Load Calculations and a One line diagram are needed for this project due to the change of occupancy use being proposed.
Building Department Corrections to be Completed
Resolved
04/17/2025
The existing Recorded Sidewalk Easement plan on file for buildings 1900-1920 Bridge lane including the survey site plan, does not show the public sidewalk being constructed behind Unit #6 your unti your permitting under this application. Therefore we are not able to approve your architectural floor plan where you desire to use the rear door of unit 6 as the main ingress and egress door for studio apartment unit being proposed on level 1. Two options you have, first either provide us a new architecutral floor plan showing a direct access to the front main door, and if this is done by entering any shared corridors the corridors must be fire rated, or second option is work with the HOA to establish a new site plan and recorded agreement if neccessary to show us a Public ADA accessbile sidwalk being constructed to lead to the back of unit #6.
Review approved and conditions have been set for deferred submittals and other items.
Planning Review
Approved
04/07/2025
04/09/2025
Jeremy Brown
Miscellaneous
Resolved
04/09/2025
Please include site plan.
Miscellaneous
Resolved
04/09/2025
Sidewalk will require a minor modification application with planning department. Please reach out to Jeremy Brown at jbrown@steamboatsprings.net
GIS Land Development Review
Approved
04/07/2025
04/07/2025
Colten Yoast
Miscellaneous
Outstanding
04/01/2025
New dwelling needs addressed. Please contact me at cyoast@steamboatsprings.net
New addresses have been added.
Utilities Review - City
Approved
04/07/2025
04/07/2025
Amber Gregory
Miscellaneous
Resolved
04/07/2025
A detailed proposed floor plan showing all the fixtures must be provided
Fire Code Review
Approved
04/07/2025
04/03/2025
Nick Kuchulis
Miscellaneous
Outstanding
04/01/2025
Resubmittal required- Fire Separation Requirments: Separation between dwelling to dwelling for walls or floor ceiling is 1-hour, dwelling to corridors is 1-hour, corridor protection is 1-hour, and all supporting construction is 1-hour, Fire separation between R-2 and U-Occupancy garage space is1-hour [Nick Kuchulis @ 10/24/2024 11:48 AM]
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Nick Kuchulis @ 04/03/2025 7:21 PM]
Building Code Review
Failed
04/07/2025
04/02/2025
Todd Carr
Building Department Corrections to be Completed
Resolved
04/02/2025
The plans lack code study information on the architectural plan, code study information tells us important details about how the project is designed under which code editions, what existing occupancy use was versus proposed occuancy use, fire separation requirements in term of rated walls, rated floor ceiling assemblies, and exiting requirements from each unit in terms of travel distance allowed versus actual distance provided. See below information that has to be added to the plans.
Project Permitted under the 2021 IBC, IEBC, IECC, IMC, IPC and 2024 NEC
Existing Occupancy Uses: Level 1 was S-1 and B Occupancy, Level 2 B-occupancy, level 3 R-2 Occupancy.
Proposed Occupancy: 1st level: U-Occupancy used as private residential storage and vehicle parking and R-2 Occupancy new Studio Apartment: Level 2 and 3 combined R-2 3-bedroom apartment unit.
Fire Separation Requirments: Separation between dwelling to dwelling for walls or floor ceiling is 1-hour, dwelling to corridors is 1-hour, corridor protection is 1-hour, and all supporting construction is 1-hour, Fire separation between R-2 and U-Occupancy garage space is1-hour
Exit Travel Distance: R-2 occupancy use requires 125 feet maximum travel distance to exterior of building.
Building Department Corrections to be Completed
Resolved
04/02/2025
The Plans should carry a North Arrow on them to represent the direction on the plans.
Building Department Corrections to be Completed
Resolved
04/02/2025
Site plans is required for this applicaiton, a site plan or building key view would show the entire building but would have your unit specifically circled or clouded on the plans. You may contact Todd Carr for a site plan if needed, as original construction drawings are available for you to use.
Building Department Corrections to be Completed
Resolved
04/02/2025
Fire rated assemblies must be submitted with the Architectural Plans, so if you need 1-hour assemblies please simpy email Todd Carr at tcarr@co.routt.co.us and I can provide you floor ceiling, and wall assemblies, the wall assemblies could be used to wrap any posts or columns that may need to be wrapped if they are not located inside a wall cavity. The floor plans must list and point to all rated walls or floor ceiling assemblies, and also any required rated fire doors need to be marked and called out on the plans.
Building Department Corrections to be Completed
Resolved
04/02/2025
The new residential unit or units shown on the plans, do not show us where the mechancial room is for these units, we need to know where the water heater, furnace, or boiler are located in the units or the building. Also provide back a narrative that tells us how each unti is heated meaning what type of heat is used to condition the new unit or units.. Please also show that any rooms used as bedrooms have an Emergency Escape and Recue opening either a door or window that meets the 20" minimum width, 24' max height, and combined total openable area of 5.7 SQ FT, if you don't have this dimension then provide us what you do have for a window opening size and total square footage of the opening.
Building Department Corrections to be Completed
Resolved
04/02/2025
On your plans, you show the term kitchen added to 1st level floor plan right where the overhead garage door is in Plan View #1, but then you call this a garage in Plan View #2, please remove the term kitchen.
Building Department Corrections to be Completed
Carried Forward
04/17/2025
Electrical Load Calculations and a One line diagram are needed for this project due to the change of occupancy use being proposed.
Building Department Corrections to be Completed
Resolved
04/02/2025
The Value of Work to be Permitted and the Total Construction Valuation are too low of values for us to accept for the amount of new construction that has taken place since the last time this unit was previously approved under issued building permits. On all of these units located at 1900-1920 Bridge Lane, the Building Department has set a cost factor for all new residential dwellings created at 1900-1920 Bridge lane, the Square Footage Cost of $100.00 per square foot for Total Construction Valuation, and $75.00 per square foot for Value of Work to be Permitted to calculate all tax fees due and permit fees due on these projects to be consistent, fair and equal to all owners of these units. For all units that have alteration work done in other areas of the Building on commercial space such as storage rooms, offices, garage space, we will use $40 per square foot for Total Project Valuation, and use $30 for Value of Work to be Permitted.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
New Residential Square footage is 1100 x $75 = $82500 for value of work to be permitted and 1100 x $100 + $110000 for Total Construction Valuation, these new values have been entered.
Building Department Corrections to be Completed
Resolved
04/02/2025
We need you to provide one set of floor plans per level that show us the exact existing conditions layout of each level, and also include all plumbing fixtures on these floor plans you create that show all floor drains, fixtures, appliance connections, hose bibs, sinks, water closets, showers, refridgerator with water lines, dishwashers, and laundry on the existing floor plans. Then update your new proposed floor plans to show all water connections that will remain in place and will not be removed.
Building Department Corrections to be Completed
Carried Forward
04/17/2025
The existing Recorded Sidewalk Easement plan on file for buildings 1900-1920 Bridge lane including the survey site plan, does not show the public sidewalk being constructed behind Unit #6 your unti your permitting under this application. Therefore we are not able to approve your architectural floor plan where you desire to use the rear door of unit 6 as the main ingress and egress door for studio apartment unit being proposed on level 1. Two options you have, first either provide us a new architecutral floor plan showing a direct access to the front main door, and if this is done by entering any shared corridors the corridors must be fire rated, or second option is work with the HOA to establish a new site plan and recorded agreement if neccessary to show us a Public ADA accessbile sidwalk being constructed to lead to the back of unit #6.
We have one correction needed, your site plan currently uploaded does not show a sidwalk being constructed behind your unit, please review our correction.
Fire Code Review
Failed
10/22/2024
10/24/2024
Nick Kuchulis
Miscellaneous
Carried Forward
04/01/2025
Resubmittal required- Fire Separation Requirments: Separation between dwelling to dwelling for walls or floor ceiling is 1-hour, dwelling to corridors is 1-hour, corridor protection is 1-hour, and all supporting construction is 1-hour, Fire separation between R-2 and U-Occupancy garage space is1-hour [Nick Kuchulis @ 10/24/2024 11:48 AM]
Resubmittal required- Fire Separation Requirments: Separation between dwelling to dwelling for walls or floor ceiling is 1-hour, dwelling to corridors is 1-hour, corridor protection is 1-hour, and all supporting construction is 1-hour, Fire separation between R-2 and U-Occupancy garage space is1-hour
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms
[Nick Kuchulis @ 10/24/2024 11:45 AM]
GIS Land Development Review
Failed
10/22/2024
10/23/2024
Colten Yoast
Miscellaneous
Carried Forward
04/01/2025
New dwelling needs addressed. Please contact me at cyoast@steamboatsprings.net
New dwelling needs addressed. Please contact me at cyoast@steamboatsprings.net
Utilities Review - City
Failed
10/22/2024
10/23/2024
Amber Gregory
Miscellaneous
Carried Forward
04/01/2025
A detailed proposed floor plan showing all the fixtures must be provided
Planning Review
Failed
10/22/2024
10/22/2024
Jeremy Brown
Miscellaneous
Carried Forward
04/01/2025
Please include site plan.
Building Code Review
Failed
10/22/2024
10/22/2024
Todd Carr
Building Department Corrections to be Completed
Carried Forward
04/01/2025
The plans lack code study information on the architectural plan, code study information tells us important details about how the project is designed under which code editions, what existing occupancy use was versus proposed occuancy use, fire separation requirements in term of rated walls, rated floor ceiling assemblies, and exiting requirements from each unit in terms of travel distance allowed versus actual distance provided. See below information that has to be added to the plans.
Project Permitted under the 2021 IBC, IEBC, IECC, IMC, IPC and 2024 NEC
Existing Occupancy Uses: Level 1 was S-1 and B Occupancy, Level 2 B-occupancy, level 3 R-2 Occupancy.
Proposed Occupancy: 1st level: U-Occupancy used as private residential storage and vehicle parking and R-2 Occupancy new Studio Apartment: Level 2 and 3 combined R-2 3-bedroom apartment unit.
Fire Separation Requirments: Separation between dwelling to dwelling for walls or floor ceiling is 1-hour, dwelling to corridors is 1-hour, corridor protection is 1-hour, and all supporting construction is 1-hour, Fire separation between R-2 and U-Occupancy garage space is1-hour
Exit Travel Distance: R-2 occupancy use requires 125 feet maximum travel distance to exterior of building.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
The Plans should carry a North Arrow on them to represent the direction on the plans.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
Site plans is required for this applicaiton, a site plan or building key view would show the entire building but would have your unit specifically circled or clouded on the plans. You may contact Todd Carr for a site plan if needed, as original construction drawings are available for you to use.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
Fire rated assemblies must be submitted with the Architectural Plans, so if you need 1-hour assemblies please simpy email Todd Carr at tcarr@co.routt.co.us and I can provide you floor ceiling, and wall assemblies, the wall assemblies could be used to wrap any posts or columns that may need to be wrapped if they are not located inside a wall cavity. The floor plans must list and point to all rated walls or floor ceiling assemblies, and also any required rated fire doors need to be marked and called out on the plans.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
The new residential unit or units shown on the plans, do not show us where the mechancial room is for these units, we need to know where the water heater, furnace, or boiler are located in the units or the building. Also provide back a narrative that tells us how each unti is heated meaning what type of heat is used to condition the new unit or units.. Please also show that any rooms used as bedrooms have an Emergency Escape and Recue opening either a door or window that meets the 20" minimum width, 24' max height, and combined total openable area of 5.7 SQ FT, if you don't have this dimension then provide us what you do have for a window opening size and total square footage of the opening.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
On your plans, you show the term kitchen added to 1st level floor plan right where the overhead garage door is in Plan View #1, but then you call this a garage in Plan View #2, please remove the term kitchen.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
Electrical Load Calculations and a One line diagram are needed for this project due to the change of occupancy use being proposed.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
The Value of Work to be Permitted and the Total Construction Valuation are too low of values for us to accept for the amount of new construction that has taken place since the last time this unit was previously approved under issued building permits. On all of these units located at 1900-1920 Bridge Lane, the Building Department has set a cost factor for all new residential dwellings created at 1900-1920 Bridge lane, the Square Footage Cost of $100.00 per square foot for Total Construction Valuation, and $75.00 per square foot for Value of Work to be Permitted to calculate all tax fees due and permit fees due on these projects to be consistent, fair and equal to all owners of these units. For all units that have alteration work done in other areas of the Building on commercial space such as storage rooms, offices, garage space, we will use $40 per square foot for Total Project Valuation, and use $30 for Value of Work to be Permitted.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
New Residential Square footage is 1100 x $75 = $82500 for value of work to be permitted and 1100 x $100 + $110000 for Total Construction Valuation, these new values have been entered.
Building Department Corrections to be Completed
Carried Forward
04/01/2025
We need you to provide one set of floor plans per level that show us the exact existing conditions layout of each level, and also include all plumbing fixtures on these floor plans you create that show all floor drains, fixtures, appliance connections, hose bibs, sinks, water closets, showers, refridgerator with water lines, dishwashers, and laundry on the existing floor plans. Then update your new proposed floor plans to show all water connections that will remain in place and will not be removed.
Plan Review completed, corrections have been added to the Plan Review letter.
Finance Department Review
Approved
10/22/2024
10/17/2024
Denitsa Yaneva
Inspection
Outcome
Requested
Scheduled
Date Inspected
Roofing Inspection
Pending
Insulation Inspection
Pending
Drywall Inspection
Pending
Building Final Inspection
Pending
Structural Inspection
Pending
Shower Pan
Pending
Wall/Roof Sheeting
Pending
Framing Inspection
Pending
Framing Inspection
Stop Work
9/22/2025
09/22/2025
Todd Carr
Condition
Status
Category
Building Department Conditions to be Completed
Resolved
Prior to Issuance of TCO/CO/CC
Building Department
applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of exisitng construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 10/22/2024 8:46 AM]
Building Department Conditions to be Completed
Open
Prior to Issuance of TCO/CO/CC
Building Department
Applicants/Owners must apply for all required Trade Permits as parent permits to the Building Permit for all work that requires Electrical, Plumbing, Mechanical, or Gas Permits. [Todd Carr @ 10/22/2024 8:46 AM]
Building Department Conditions to be Completed
Open
Prior to Issuance of TCO/CO/CC
Building Department
1. Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
New Residential Square footage is 1100 x $75 = $82500 for value of work to be permitted and 1100 x $100 + $110000 for Total Construction Valuation, these new values have been entered.
[Todd Carr @ 10/23/2024 1:37 PM]
Miscellaneous Conditions
Resolved
Prior to Full Building Permit Issuance
Planning Department
Per the Condition of approval for the Development Plan PL20240033 "Owners who do not record deed restrictions shall be deemed not in compliance with this development approval and may not have their building permits approved and may be subject to enforcement efforts in Municipal and/or District Court by the City". Based on our records, we do not have evidence of a recorded deed restriction. Please provide evidence or reach out to the planning department for assistance in this process. Jeremy Brown 970-871-8244
Miscellaneous Conditions
Open
Prior to Rough Building Wall Inspections
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Nick Kuchulis @ 10/24/2024 11:46 AM]
Final Fire Inspection Required
Open
Prior to Issuance of CO/CC
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 10/24/2024 3:50 PM]
Miscellaneous Conditions
Resolved
Prior to Issuance of TCO/CO/CC
GIS
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane.
Miscellaneous Conditions
Open
Prior to Rough Building Wall Inspections
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Nick Kuchulis @ 04/03/2025 7:21 PM]
Miscellaneous Conditions
Resolved
Prior to Full Building Permit Issuance
Planning Department
Sidewalk will require a minor modification application with planning department. Please reach out to Jeremy Brown at jbrown@steamboatsprings.net
Building Department Conditions to be Completed
Open
Prior to Issuance of TCO/CO/CC
Building Department
Deferred Submittal Required for the proposed sidewalk behind this unit, the sidewalk and easement must be secured and recorded, then a new site plan provided to us for review and approval prior to TCO Being Issued allowing this unit to be occupied. The owner is accepting all risk and liability if the sidewalk easement cannot be approved or constructed, unit owner is then responsible to submit new plans that show a hallway being constructed from the new proposed apartment unit to the front main entry door of this building. [Todd Carr @ 04/17/2025 1:53 PM]
Building Department Conditions to be Completed
Resolved
Prior to Rough Building Wall Inspections
Building Department
Required Deferred Submittal of Electrical Engineered One Line Diagram and Electrical Load Calculations for Unit 6 must be provided prior to any framing inspections. [Todd Carr @ 04/17/2025 1:54 PM]
Miscellaneous Conditions
Open
Prior to Issuance of TCO/CO/CC
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 8:15 AM]
Miscellaneous Conditions
Open
Prior to Issuance of CO/CC
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 8:15 AM]