Planning Application Status
PL20230275
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Title | Location | Date | Time |
---|---|---|---|
Planning Commission, 2023-12-28, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 12/28/2023 | 5:00 PM |
Resolution
Tabled with Date
|
|||
Planning Commission, 2024-01-11, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 01/11/2024 | 5:00 PM |
Resolution
Approved with Conditions
|
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Mineral Rights Notification Affidavit | Resolved | |
Planning Department
Mineral Rights Notification: Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
___
Initial notice sent 9/21/23. Second notice sent 12/15/23.
|
||
Miscellaneous Condition | Open | Prior to Certificate of Occupancy/Completion |
GIS
Please e-mail techhelp@steamboatsprings.net to request addresses.
|
||
Informational Comment | Resolved | |
Public Works
Public Works Water Resource Management Informational Comment: The soils on this site are known to be contaminated. There will likely be contaminated groundwater as well that will need to be managed during construction to avoid illicit discharge into the stormwater system.
|
||
Civils Required at BP | Resolved | Prior to Issuance of Construction Permit |
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/Grading Permit application for review and approval prior to the start of any construction.
|
||
Record Drawings/CAD Files | Resolved | Prior to Issuance of CO/CC |
Engineering
Record Drawings/CAD Files including drainage, PWQTF(s), and sidewalks shall be submitted prior to Final Engineering Site Inspection.
|
||
Completion Letter (Private Improv.) | Resolved | Prior to Engineering Final Approval Inspection |
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be uploaded to the applicable building permit condition.
|
||
Informational Comment | Resolved | |
Planning Department
Informational Comment: Jason Sharpe, Lumen: Please contact me when they break ground to discuss fiber optic service to these developments. tel: 970.328.8290 Jason.Sharpe@Lumen.com
|
||
Miscellaneous Condition | Resolved | |
Planning Department
Updated documents required prior to Planning Commission packet deadline: Based on the size of the units, the parking standard is 1.5 spaces per unit. Please recalculate and update the narrative, coversheet, and calcuations in the architectural plans. It does not appear there is deficiency.
|