Planning Application Status
DPA-21-09
There are no hearings for this planning application.
There are no inspections for this planning application, or you are not authorized to view them.
| Condition | Status | Category |
|---|---|---|
| Site Posting Affidavit | Resolved | Prior to Final Review |
|
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
| AO Avigation Easement - BP | Open | Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat |
|
Planning Department
Prior to Building Permit issuance, the property owner shall record an avigation easement.
|
||
| AO Proximity Disclosure - BP | Open | Prior to Approval and any Construction of Improvements Agreement, Construction Permit, or Final Plat |
|
Planning Department
Prior to Building Permit issuance, the property owner shall record an airport proximity disclosure.
|
||
| Miscellaneous Condition | Open | |
|
Engineering
A Grading and Drainage Plan signed and sealed by a Colorado Professional Engineer is required at time of building permit.
|
||
| Completion Letter (Private Improv.) | Open | Prior to Engineering Final Approval Inspection |
|
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
|
||
| Completion Letter (PSWQTF) | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
|
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be submitted.
|
||
| Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
|
Engineering
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first: • Water and Sewer infrastructure • Public and Private Street infrastructure • Access drive, driveway, and parking areas • Drainage improvements • Permanent storm water quality treatment facilities • Sidewalk improvements • Trail improvements • Revegetation
|
||
| Civils - Final Approved Plans (Hard Copy) | Open | |
|
Engineering
Prior to requesting approval of improvements, two 24" x 36" hard copies of the final approved plan set shall be provided.
|
||
| PWQ O&M prior to final approval | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
|
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a recorded Ownership & Maintenance Agreement shall be submitted.
|
||
| PWQ O&M prior to CO/CAC | Open | Prior to Issuance of CO/CC |
|
Engineering
Prior to Certificate of Occupancy/Completion, an Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
|
||
| Record Drawings/CAD Files | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
|
Engineering
Record Drawings/CAD Files shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection.
|
||
There are no related items for this planning application.