Planning Commission, 2022-06-09, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 06/09/2022 | 5:00 PM |
Recommendation
Approved with Conditions
|
|||
City Council, 2022-06-20, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 06/20/2022 | 5:00 PM |
Resolution
Approved with Conditions
|
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Civils Required | Resolved | Prior to Issuance of Construction Permit |
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/ Grading Permit application for review and approval prior to the start of any construction.
|
||
Executed Easements Prior to BP/GF | Resolved | Prior to Issuance of Construction Permit |
Engineering
The owner shall provide the following recorded easements prior to issuance of a construction permit (Grade and Fill, Building): • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Public access easements for public sidewalks which are not completely within the right-of-way.
|
||
Critical Improvements (List) | Open | Prior to Issuance of Certificate of Occupancy/Completion |
Engineering
The following items are considered critical improvements and must be constructed and approved or accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first: • Water and Sewer infrastructure • Access drive, driveway, and parking areas • Drainage improvements • Permanent storm water quality treatment facilities • Sidewalk improvements • Snowmelt system
|
||
PWQ O&M prior to CO/CAC | Open | Prior to Issuance of CO/CC |
Engineering
Prior to Certificate of Occupancy/Completion, an Ownership and Maintenance Agreement for the Permanent Stormwater Quality Treatment Facility shall be recorded.
|
||
PWQ O&M prior to final approval | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Prior to Permanent Stormwater Quality Treatment Facility Inspection, a recorded Ownership & Maintenance Agreement shall be submitted.
|
||
Record Drawings/CAD Files | Open | Prior to Permanent Stormwater Quality Treatment Facility Inspection |
Engineering
Record Drawings/CAD Files shall be submitted prior to Permanent Stormwater Quality Treatment Facility Inspection
|
||
Miscellaneous Condition | Resolved | Prior to Certificate of Occupancy/Completion |
Fire Prevention
Sprinkler and alarm systems are required in all units prior to issuance of a Certificate of Occupancy. *Sprinkler and alarm are not required. 9-15-2022 MwM
|
||
Miscellaneous Condition | Open | Condition of Future Submittal |
Planning Department
The project is approved with a snowmelt system and no designated areas for snow storage or plan for snow hauling. The snowmelt system shall be kept in operating condition in perpetuity. Any circumstance on the property other than a snowmelt system serving the entire development will require development plan approval.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance of Construction Permit |
Planning Department
An approved recorded final plat is required prior to issuance of any construction permit, grading permit, or other similar building permit.
|
||
Revocable License/Permit prior to BP/GF | Resolved | Prior to Issuance of Construction Permit |
Planning Department
Prior to issuance of a Grade and Fill Permit or Building Permit, a revocable license/permit shall be issued for all privately maintained encroachments into the public right-of-way or public easement: Landscaping, landscaping improvements, stairs, private walkways
|
||
Miscellaneous Condition | Resolved | Prior to Issuance of Construction Permit |
Mount Werner Water and Sanitation District
Prior to issuance of any construction permit, the owner/applicant shall submit a revised sewer main design to Mount Werner Water for approval. The owner/applicant may propose a new alignment along with the associated easements, lower the existing main in place along Walton Creek Road, or a combination of both.
|