| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| Construction Stormwater Review | Approved | 10/04/2023 | 03/15/2024 |
| Construction Stormwater Review | Failed | 10/04/2023 | 12/15/2023 |
| Construction Stormwater Review | Failed | 10/13/2023 | 10/12/2023 |
| Construction Stormwater Review | Failed | 10/04/2023 | 09/21/2023 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Interim Construction Stormwater | Pending | |||
| Scott Slamal | ||||
| 45 Day Inspection | Failed | 4/19/2024 | 04/19/2024 | |
| Scott Slamal | ||||
|
Corrections:
Tracking
Carried Forward
04/23/2024
Vehicle tracking controls were not adequate and mud was tracked on to pavement.
|
||||
|
Perimeter Control Measures
Carried Forward
04/23/2024
Silt fence needs to be reinstalled and/or maintained.
|
||||
| 45 Day Inspection | Passed | 6/3/2024 | 06/05/2024 | |
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 7/12/2024 | 07/12/2024 | |
| Scott Slamal | ||||
|
Corrections:
Tracking
Outstanding
04/23/2024
Vehicle tracking controls were not adequate and mud was tracked on to pavement.
|
||||
|
Perimeter Control Measures
Outstanding
04/23/2024
Silt fence needs to be reinstalled and/or maintained.
|
||||
| 45 Day Inspection | Passed | 8/23/2024 | 08/27/2024 | |
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 10/9/2024 | 10/14/2024 | |
| Scott Slamal | ||||
| 45 Day Inspection | Failed | 5/23/2025 | 04/08/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
04/08/2025
Reinstall silt fence or straw wattles along perimeter of disturbance along Big Bend Dr.
|
||||
|
Miscellaneous
Carried Forward
04/08/2025
Sweep sediment off Big Bend Dr. and prevent further mud tracking.
|
||||
| 45 Day Inspection | Passed | 5/21/2025 | 05/21/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Outstanding
04/08/2025
Reinstall silt fence or straw wattles along perimeter of disturbance along Big Bend Dr.
|
||||
|
Miscellaneous
Outstanding
04/08/2025
Sweep sediment off Big Bend Dr. and prevent further mud tracking.
|
||||
| Final Construction Stormwater | Failed | 8/13/2025 | 08/13/2025 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
08/13/2025
Pick up trash and materials noted in photos around the vacant lot.
|
||||
|
Miscellaneous
Carried Forward
08/13/2025
Remove deteriorating silt fence around vacant lot and straw wattles in ditch along Curve Court.
|
||||
| Final Construction Stormwater | Passed | 09/24/2025 | ||
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Outstanding
08/13/2025
Pick up trash and materials noted in photos around the vacant lot.
|
||||
|
Miscellaneous
Outstanding
08/13/2025
Remove deteriorating silt fence around vacant lot and straw wattles in ditch along Curve Court.
|
||||
There are no conditions for this engineering permit application, or you are not authorized to view them.
There are no related items for this engineering permit application.
Powered by CityView