| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| Construction Stormwater Review | Approved | 05/23/2022 | 05/03/2022 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Final Construction Stormwater | Pending | |||
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 6/19/2022 | 06/17/2022 | |
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 8/1/2022 | 08/01/2022 | |
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 9/15/2022 | 09/14/2022 | |
| Scott Slamal | ||||
| 45 Day Inspection | Passed | 10/29/2022 | 10/28/2022 | |
| Scott Slamal | ||||
| 45 Day Inspection | Failed | 4/17/2023 | 04/17/2023 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
04/17/2023
Continue to pick up trash at west side of site and north corner where snow storage piles still exist or where melted out.
|
||||
|
Miscellaneous
Carried Forward
04/17/2023
Install rock socks around stockpiles.
|
||||
|
Miscellaneous
Carried Forward
04/17/2023
Make available spill cleaned up materials at fueling station.
|
||||
| 45 Day Inspection | Failed | 5/26/2023 | 05/31/2023 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Carried Forward
05/31/2023
Scrape up and remove oil stain soil on north side of property
|
||||
|
Miscellaneous
Carried Forward
05/31/2023
Install straw waddles out south west corner around culverts.
|
||||
|
Miscellaneous
Resolved
05/31/2023
Make available spill cleaned up materials at fueling station.
|
||||
| 45 Day Inspection | Passed | 7/15/2023 | 07/07/2023 | |
| Scott Slamal | ||||
|
Corrections:
Miscellaneous
Outstanding
05/31/2023
Scrape up and remove oil stain soil on north side of property
|
||||
|
Miscellaneous
Outstanding
05/31/2023
Install straw waddles out south west corner around culverts.
|
||||
| 45 Day Inspection | Failed | 10/5/2023 | 08/21/2023 | |
| Scott Slamal | ||||
|
Corrections:
Perimeter Control Measures
Carried Forward
08/21/2023
Straw wattle check dams in need of maintenance at corner of Shield Dr. and Curve Ct.
Additional check dams needed at locations identified during inspection in roadside swale along Shield Dr.
|
||||
|
Miscellaneous
Carried Forward
08/21/2023
Do not line excavated ditch along Shield Dr. with cobble. Ditch needs to be revegetated and lined with erosion control blankets.
|
||||
| 45 Day Inspection | Passed | 10/14/2023 | 08/30/2023 | |
| Scott Slamal | ||||
|
Corrections:
Perimeter Control Measures
Outstanding
08/21/2023
Straw wattle check dams in need of maintenance at corner of Shield Dr. and Curve Ct.
Additional check dams needed at locations identified during inspection in roadside swale along Shield Dr.
|
||||
|
Miscellaneous
Outstanding
08/21/2023
Do not line excavated ditch along Shield Dr. with cobble. Ditch needs to be revegetated and lined with erosion control blankets.
|
||||
| 45 Day Inspection | Passed | 10/21/2023 | 10/17/2023 | |
| Scott Slamal | ||||
| 90 Day Inspection | Partial Pass | 4/26/2024 | 04/30/2024 | |
| Scott Slamal | ||||
| 90 Day Inspection | Partial Pass | 7/29/2024 | 07/29/2024 | |
| Scott Slamal | ||||
| 90 Day Inspection | Partial Pass | 10/27/2024 | 11/01/2024 | |
| Scott Slamal | ||||
| 90 Day Inspection | Reached Final Stablization | 6/6/2025 | 06/10/2025 | |
| Scott Slamal | ||||