City of Steamboat Springs Web Portal

Permit Application Status

SPRRN241803


In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

SPRRN241803
Alteration
In Plan Check
STEAMBOAT RESIDENTIAL, LLC
Alteration
R-2 - Residential, multiple family
U - Utility, miscellaneous
Conversion of storage space to two bedrooms, a kitchen and living room. Addition of shower in existing bathroom.
11/16/2024
11/16/2025

Locations

Permits

Permit Number: SPRRN241803-BD1

Building
In Plan Check

Reviews

Review Type Outcome Est. Completion Date Completed
Building Code Review Approved 10/13/2025 10/06/2025
Building Code Review Failed 07/14/2025 07/14/2025
Planning Review Approved 11/25/2024 12/02/2024
Utilities Review - City Approved 11/25/2024 11/25/2024
GIS Land Development Review Approved 11/25/2024 11/25/2024
Building Code Review Failed 11/25/2024 11/25/2024
Fire Code Review Approved 11/25/2024 11/20/2024
Finance Department Review Approved 11/25/2024 11/20/2024

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Framing Inspection Failed 10/11/2025 10/11/2025
Todd Carr

Conditions

Condition Status Category
Use Tax Reconciliation Open Prior to Issuance of CO/CC
Finance
Use Tax Reconciliation
Final Fire Inspection Required Open Prior to Issuance of CO/CC
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 11/21/2024 4:02 PM]
Fire Assemblies Deferred Submittal Open Prior to Drywall Inspections Scheduled
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Matt Workman @ 11/21/2024 4:02 PM]
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
1Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance. All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued. [Todd Carr @ 11/25/2024 1:43 PM]
Building Department Conditions to be Completed Open Prior to Issuance of CO/CC
Building Department
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 11/25/2024 1:46 PM]
Building Department Conditions to be Completed Resolved Prior to Issuance of TCO/CO/CC
Building Department
[Todd Carr @ 11/25/2024 1:47 PM] Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of existing construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 01/22/2025 2:34 PM]
Miscellaneous Conditions Open Prior to Issuance of TCO/CO/CC
GIS
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane.
Vested Approval Conditions Resolved
Planning Department
Compliance with PL20240033 conditions of approval required.
MF/Com/I Planning CO Review Open Prior to Issuance of TCO/CO/CC
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 10:13 AM]
Miscellaneous Conditions Open Prior to Issuance of CO/CC
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 10:13 AM]

Related Permit & Planning Applications

Reference Number Status Type
SPRMH251732 Permit(s) Issued Mechanical

Documents & Images

Date Uploaded File Type Name
Letter INCOMPLETE APPLICATION NOTICE.PDF
Letter PERMIT REVIEW CORRECTIONS NOTICE0.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
11/16/2024 Plans 2024-10-17 - Riverfront Park - MP - All Units - Revised Permit - Stamped
11/25/2024 Plans 1920 Bridge Lane units 8-14 origianal constructin plans
12/03/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
12/30/2024 Sidewalk Easement Recording Fee
12/30/2024 SIDEWALK EASEMENT Recorded 122324
10/05/2025 Plans ArchitecturalPlans_RFP-Unit11_PermitSet_20251001
10/06/2025 Plans July 6 2025 letter to CO code official - stamped - with calculations (Received) (Stamped)
10/06/2025 Plans Riverfront BLDG 4 Unit 11 - Elec Permit Drawing 20241010 (Received) (Stamped)