| Date Returned | Name | 
|---|---|
| 10/06/2025 | Riverfront BLDG 4 Unit 11 - Elec Permit Drawing 20241010 (Received) (Stamped) | 
| 10/06/2025 | July 6 2025 letter to CO code official - stamped - with calculations (Received) (Stamped) | 
| Review Type | Outcome | Est. Completion Date | Completed | 
|---|---|---|---|
| Building Code Review | Approved | 10/13/2025 | 10/06/2025 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Resolved 
10/06/2025 
                                            Your architectual plans lack code study information, lack fire rating information, lack egress distances, lack ADA information, occupancy use information, all other plans we recieved from SEAD had a lot more architectural sheets with all this information.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Resolved 
10/06/2025 
                                            The Structural Plans received were done by a Licensed Professional Engineer, Colarado State Law under DORA who licenses Engineers requires the plans to be Stamped by a Colorado Licensed Engineer. Please have the Engineer apply their Colorado Stamp to these plans., then resubmit. The Structural Plans look good, and can be approved once the Stampe is applied.
                                         
                                        
                                        
                                     | 
                                |||
| Building code review is now completed and approved, subject to field inspections being done in the field to verify existing work done in the past, and new work that has to be completed in accordance with the plans. | |||
| Building Code Review | Failed | 07/14/2025 | 07/14/2025 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Resolved 
07/14/2025 
                                            There were no Structural Plans provided with your submittals to review how the 2nd flloor is framing has been constructed, please resubmit a structural floor plan that shows how the floor is constructed for level 2 above the main level apartment unit.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Resolved 
07/14/2025 
                                            Your architectural plans indicate you want to use the rear door on level one as your main Egress/Ingress door to the new apartment unit, as the building code does not allow you to first enter a garage, to then enter a dwelling unit, every dwelling unit must have it's own main egress/ingress door leading directly to the dwelling. This can be done by creating a corridor that leads to the dwelling by building interior walls, or you may wait to see if your HOA will approve a new Site Plan to be submitted. The new site plan would need to show and label a Public Access route from the front of the building to the rear of this building that connects to each units rear patio area, and it will need to be ADA compliant at 3' wide. Proper signs must be installed in the front of the building directing the Public to the main entrances, this information would have to be included on the site plan as well.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
10/06/2025 
                                            Your architectual plans lack code study information, lack fire rating information, lack egress distances, lack ADA information, occupancy use information, all other plans we recieved from SEAD had a lot more architectural sheets with all this information.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
10/06/2025 
                                            The Structural Plans received were done by a Licensed Professional Engineer, Colarado State Law under DORA who licenses Engineers requires the plans to be Stamped by a Colorado Licensed Engineer. Please have the Engineer apply their Colorado Stamp to these plans., then resubmit. The Structural Plans look good, and can be approved once the Stampe is applied.
                                         
                                        
                                        
                                     | 
                                |||
| You still have not updated your Architectural Plans to include Code Study information requested previously, and we have new corrections for the Structural Plans. | |||
| Planning Review | Approved | 11/25/2024 | 12/02/2024 | 
| 
                                                             
                                    Jeremy Brown
                                    
                                 
                             | 
                        |||
| Utilities Review - City | Approved | 11/25/2024 | 11/25/2024 | 
| 
                                                             
                                    Amber Gregory
                                    
                                 
                             | 
                        |||
| GIS Land Development Review | Approved | 11/25/2024 | 11/25/2024 | 
| 
                                                             
                                    Colten Yoast
                                    
                                 
                             | 
                        |||
| Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane. | |||
| Building Code Review | Failed | 11/25/2024 | 11/25/2024 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
07/07/2025 
                                            There were no Structural Plans provided with your submittals to review how the 2nd flloor is framing has been constructed, please resubmit a structural floor plan that shows how the floor is constructed for level 2 above the main level apartment unit.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
07/07/2025 
                                            Your architectural plans indicate you want to use the rear door on level one as your main Egress/Ingress door to the new apartment unit, as the building code does not allow you to first enter a garage, to then enter a dwelling unit, every dwelling unit must have it's own main egress/ingress door leading directly to the dwelling. This can be done by creating a corridor that leads to the dwelling by building interior walls, or you may wait to see if your HOA will approve a new Site Plan to be submitted. The new site plan would need to show and label a Public Access route from the front of the building to the rear of this building that connects to each units rear patio area, and it will need to be ADA compliant at 3' wide. Proper signs must be installed in the front of the building directing the Public to the main entrances, this information would have to be included on the site plan as well. 
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
07/07/2025 
                                            Your architectual plans lack code study information, lack fire rating information, lack egress distances, lack ADA information, occupancy use information, all other plans we recieved from SEAD had a lot more architectural sheets with all this information. 
                                         
                                        
                                        
                                     | 
                                |||
| Please see the conditions we have set on the permit, and also a list of corrections we will need you to review and then resubmit. | |||
| Fire Code Review | Approved | 11/25/2024 | 11/20/2024 | 
| 
                                                             
                                    Matt Workman
                                    
                                 
                             | 
                        |||
| Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms | |||
| Finance Department Review | Approved | 11/25/2024 | 11/20/2024 | 
| 
                                                             
                                    Sondra Spratta
                                    
                                 
                             | 
                        |||
| Inspection | Outcome | Requested | Scheduled | Date Inspected | 
|---|---|---|---|---|
| Framing Inspection | Failed | 10/11/2025 | 10/11/2025 | |
| Todd Carr | ||||
| Condition | Status | Category | 
|---|---|---|
| Use Tax Reconciliation | Open | Prior to Issuance of CO/CC | 
|                 
                 Finance 
Use Tax Reconciliation 
 |            
        ||
| Final Fire Inspection Required | Open | Prior to Issuance of CO/CC | 
|                 
                 Fire Prevention 
Final Fire Alarm and Sprinkler Inspections Required.  [Shannon Yaconiello @ 11/21/2024 4:02 PM]  
 |            
        ||
| Fire Assemblies Deferred Submittal | Open | Prior to Drywall Inspections Scheduled | 
|                 
                 Fire Prevention 
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms  [Matt Workman @ 11/21/2024 4:02 PM]  
 |            
        ||
| Building Department Conditions to be Completed | Open | Prior to Issuance of TCO/CO/CC | 
|                 
                 Building Department 
1Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
 [Todd Carr @ 11/25/2024 1:43 PM]  
 |            
        ||
| Building Department Conditions to be Completed | Open | Prior to Issuance of CO/CC | 
|                 
                 Building Department 
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 11/25/2024 1:46 PM]  
 |            
        ||
| Building Department Conditions to be Completed | Resolved | Prior to Issuance of TCO/CO/CC | 
|                 
                 Building Department 
 [Todd Carr @ 11/25/2024 1:47 PM] Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of existing construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 01/22/2025 2:34 PM]  
 |            
        ||
| Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC | 
|                 
                 GIS 
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane. 
 
 |            
        ||
| Vested Approval Conditions | Resolved | |
|                 
                 Planning Department 
Compliance with PL20240033 conditions of approval required. 
 |            
        ||
| MF/Com/I Planning CO Review | Open | Prior to Issuance of TCO/CO/CC | 
|                 
                 Planning Department 
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code.  Specifically this will include inspection of parking lot striping.  [Jeremy Brown @ 04/23/2025 10:13 AM]  
 |            
        ||
| Miscellaneous Conditions | Open | Prior to Issuance of CO/CC | 
|                 
                 Planning Department 
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code.  Specifically this will include inspection of landscape plantings and interior parking lot landscape forms.  [Jeremy Brown @ 04/23/2025 10:13 AM]  
 |            
        ||
| Reference Number | Status | Type | 
|---|---|---|
| SPRMH251732 | Permit(s) Issued | Mechanical | 
| Date Uploaded | File Type | Name | 
|---|---|---|
| Letter | INCOMPLETE APPLICATION NOTICE.PDF | |
| Letter | PERMIT REVIEW CORRECTIONS NOTICE0.PDF | |
| Receipt | RECEIPT.PDF | |
| Receipt | RECEIPT.PDF | |
| 11/16/2024 | Plans | 2024-10-17 - Riverfront Park - MP - All Units - Revised Permit - Stamped | 
| 11/25/2024 | Plans | 1920 Bridge Lane units 8-14 origianal constructin plans | 
| 12/03/2024 | Letter | Permit Review Corrections Notice (Generate/Send Correction Notice) | 
| 12/30/2024 | Sidewalk Easement Recording Fee | |
| 12/30/2024 | SIDEWALK EASEMENT Recorded 122324 | |
| 10/05/2025 | Plans | ArchitecturalPlans_RFP-Unit11_PermitSet_20251001 | 
| 10/06/2025 | Plans | July 6 2025 letter to CO code official - stamped - with calculations (Received) (Stamped) | 
| 10/06/2025 | Plans | Riverfront BLDG 4 Unit 11 - Elec Permit Drawing 20241010 (Received) (Stamped) | 