Permit Application Status
SPRRN241739
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
        Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
| Date Returned | Name | 
|---|---|
| 01/06/2025 | StructuralDrawings_RiverfrontParkUnit14_Revision 1_24028 (Stamped) | 
| 01/06/2025 | ArchitecturalDrawings_RiverfrontParkUnit14_Revision 1_24028 (Stamped) | 
| Review Type | Outcome | Est. Completion Date | Completed | 
|---|---|---|---|
| Planning Review | TCO Approved | 12/03/2024 | 10/27/2025 | 
| 
                                                             
                                    Jeremy Brown
                                    
                                 
                             | 
                        |||
| COO Review - Building Code | TCO Approved | 03/27/2025 | 09/10/2025 | 
| 
                                                             
                                    Heidi Spengler
                                    
                                 
                             | 
                        |||
| TCO/CO Reveiw: Review approved for a TCO | |||
| COO Review - Finance Department | Approved | 09/16/2025 | 09/09/2025 | 
| 
                                                             
                                    Denitsa Yaneva
                                    
                                 
                             | 
                        |||
| COO Review - Planning | Failed | 03/27/2025 | 04/04/2025 | 
| 
                                                             
                                    Jeremy Brown
                                    
                                 
                             | 
                        |||
| COO Review - Fire Code | Approved | 03/27/2025 | 04/03/2025 | 
| 
                                                             
                                    Shannon Yaconiello
                                    
                                 
                             | 
                        |||
| CC Approved. [Shannon Yaconiello @ 04/03/2025 11:26 AM] | |||
| COO Review - GIS Land Development | Approved | 03/27/2025 | 04/01/2025 | 
| 
                                                             
                                    Colten Yoast
                                    
                                 
                             | 
                        |||
| TCO/CO Reveiw: Addresses have been added sorry for the delay. | |||
| COO Review - Finance Department | TCO Approved | 03/27/2025 | 03/20/2025 | 
| 
                                                             
                                    Denitsa Yaneva
                                    
                                 
                             | 
                        |||
| TCO/CO Reveiw: | |||
| Planning Review | Approved | 01/03/2025 | 01/06/2025 | 
| 
                                                             
                                    Jeremy Brown
                                    
                                 
                             | 
                        |||
| See addendum recieved on 12/24/24 in documents to structural and architectural, minor tweaks in square footages and layout using the rear door now as the main ingress. | |||
| Building Code Review | Approved | 01/03/2025 | 12/24/2024 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| Addendums approved. | |||
| Utilities Review - City | Approved | 11/27/2024 | 11/25/2024 | 
| 
                                                             
                                    Amber Gregory
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Miscellaneous
                                         
                                        Outstanding 
11/22/2024 
                                            Was a dishwasher installed on the 3rd floor?
                                         
                                        
                                        
                                     | 
                                |||
| Building Code Review | Approved | 11/22/2024 | 11/22/2024 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Resolved 
11/22/2024 
                                            Future Site plan required along with a final Legal Recorded Plat showing the dedication easement for Public Access Easement to exist on the adjoining property owners parcel to have a 3 foot wide dedicated public access easement for the units to use the rear door as a main entrance.
Deferred Submital Required to fully Approve the Plans, Permit is approved with the owner agreeing all work being done or proceeding forward under this Issued Building Permit is at the owners risk and acknowledgment accepting the fact we may have deny this requested use, and all work may have to be removed if all Reviewing Departments do not approve a future site plan, easement, and proposed access to your unit by utilizing the rear door of this proposed unit as the main entrance. Owner accepted all risks by email on 11/22/2024. [Todd Carr @ 11/22/2024 1:32 PM] 
                                         
                                        
                                        
                                     | 
                                |||
| Permit approved based on owners request for a deferred submittal being accepted by the Building Department, condition below has been added to this permit. Deferred Submital Required to fully Approve the Plans, Permit is approved with the owner agreeing all work being done or proceeding forward under this Issued Building Permit is at the owners risk and acknowledgment accepting the fact we may have deny this requested use, and all work may have to be removed if all Reviewing Departments do not approve a future site plan, easement, and proposed access to your unit by utilizing the rear door of this proposed unit as the main entrance. Owner accepted all risks by email on 11/22/2024. [Todd Carr @ 11/22/2024 1:32 PM] | |||
| Utilities Review - City | Failed | 11/22/2024 | 11/22/2024 | 
| 
                                                             
                                    Amber Gregory
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Miscellaneous
                                         
                                        Carried Forward 
11/22/2024 
                                            Was a dishwasher installed on the 3rd floor?
                                         
                                        
                                        
                                     | 
                                |||
| Utilities Review - City | Failed | 11/12/2024 | 11/13/2024 | 
| 
                                                             
                                    Amber Gregory
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Miscellaneous
                                         
                                        Carried Forward 
11/18/2024 
                                            Provide the original approved building permit plans for proper tap fee assessment.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Miscellaneous
                                         
                                        Resolved 
11/22/2024 
                                            The documents provided are for Building 3 not 4.  Provide the correct corresponding existing permitted plan set.
                                         
                                        
                                        
                                     | 
                                |||
| GIS Land Development Review | Approved | 11/12/2024 | 11/13/2024 | 
| 
                                                             
                                    Colten Yoast
                                    
                                 
                             | 
                        |||
| Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane. | |||
| Planning Review | Approved | 11/12/2024 | 11/13/2024 | 
| 
                                                             
                                    Jeremy Brown
                                    
                                 
                             | 
                        |||
| Fire Code Review | Approved | 11/12/2024 | 11/12/2024 | 
| 
                                                             
                                    Charles Brookshire
                                    
                                 
                             | 
                        |||
| Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms. NB [Charles Brookshire @ 11/12/2024 8:50 PM] | |||
| Building Code Review | Failed | 11/12/2024 | 11/06/2024 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
11/18/2024 
                                            The Building Department cannot accept photos of a sidewalk outside, but rather we will need you to submit a full site plan of this entire site to show us the walkway from the front of the building and parking areas all the way around the side and rear of the building, and lable this as the main dwelling entrance to this unit or any other units that choose to use the back of the building as the main entrance. We also need the site plan to show us and lable signage to be installed in the front of the building, that directs the public to this walkway to access any units that want to use the rear of the building as the main entrance. We suggest all units work together on this site plan.
This Unit currently is accessed from the front of the building, as the main egress/ingress door and unit addressing is on the front of the building, because of this each dwelling unit should have direct access to the dwelling by means of entering the main front entry door, then from the corridor directly enter the unit, without entering a intervening space such as a garage, U-Occupancy which is considered a storage room. See code section below, item #5 states egress shall not pass through storage rooms, we view the garage u-occupancy as a storage room. However you do have a back door that leads into this unit, so if you wanted to provide proper signage in the front of the building that directs you to the main ingress/egress door by guiding you around the building, and ensure the HOA has a public sidewalk that is minimum of 3' wide and guaranteed to be maintained year round to be free of snow, then this could become your main entry door to this unit, then this plan would be acceptable. We would need a site plan provided shown us the pathway and signage designating this as the main ingress/egress entrance. 
Egress through intervening spaces shall comply with this section.
1. Exit access through an enclosed elevator lobby is permitted. Where access to two or more exits or exit access doorways is required in Section 1006.2.1, access to not less than one of the required exits shall be provided without travel through the enclosed elevator lobbies required by Section 3006. Where the path of exit access travel passes through an enclosed elevator lobby, the level of protection required for the enclosed elevator lobby is not required to be extended to the exit unless direct access to an exit is required by other sections of this code.
2. Egress from a room or space shall not pass through adjoining or intervening rooms or areas, except where such adjoining rooms or areas and the area served are accessory to one or the other, are not a Group H occupancy and provide a discernible path of egress travel to an exit.
Exception: Means of egress are not prohibited through adjoining or intervening rooms or spaces in a Group H, S or F occupancy where the adjoining or intervening rooms or spaces are the same or a lesser hazard occupancy group.
3. An exit access shall not pass through a room that can be locked to prevent egress.
4. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas, toilet rooms or bathrooms.
5. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes.
Exceptions:
1. Means of egress are not prohibited through a kitchen area serving adjoining rooms constituting part of the same dwelling unit or sleeping unit.
2. Means of egress are not prohibited through stockrooms in Group M occupancies where all of the following are met:
2.1. The stock is of the same hazard classification as that found in the main retail area.
2.2 .Not more than 50 percent of the exit access is through the stockroom.
2.3. The stockroom is not subject to locking from the egress side.
2.4. There is a demarcated, minimum 44-inch-wide (1118 mm) aisle defined by full- or partial-height fixed walls or similar construction that will maintain the required width and lead directly from the retail area to the exit without obstructions.
                                         
                                        
                                        
                                     | 
                                |||
| Please review our conditions we have entered under this permit, along with our correction comments as well. | |||
| Finance Department Review | Approved | 11/12/2024 | 11/05/2024 | 
| 
                                                             
                                    Sondra Spratta
                                    
                                 
                             | 
                        |||
| Inspection | Outcome | Requested | Scheduled | Date Inspected | 
|---|---|---|---|---|
| Building Final Inspection | Pending | |||
| Structural Inspection | Not Ready | 12/4/2024 | 12/4/2024 | 12/04/2024 | 
| Silas Ebbert | ||||
| Drywall Inspection | Not Ready | 12/4/2024 | 12/4/2024 | 12/04/2024 | 
| Silas Ebbert | ||||
| Insulation Inspection | Not Ready | 12/4/2024 | 12/4/2024 | 12/04/2024 | 
| Silas Ebbert | ||||
| Framing Inspection | Partial Pass | 12/4/2024 | 12/4/2024 | 12/04/2024 | 
| Silas Ebbert | ||||
| Drywall Inspection | Partial Pass | 12/11/2024 | 12/11/2024 | 12/11/2024 | 
| Silas Ebbert | ||||
| Shower Pan | Passed | 12/26/2024 | 12/26/2024 | 12/26/2024 | 
| Ron Norton | ||||
| Drywall Inspection | Passed | 3/19/2025 | 3/19/2025 | 03/19/2025 | 
| Silas Ebbert | ||||
| Building Final Inspection | Partial Pass | 3/20/2025 | 3/20/2025 | 03/20/2025 | 
| Silas Ebbert | ||||
| Condition | Status | Category | 
|---|---|---|
| Use Tax Reconciliation | Resolved | Prior to Issuance of CO/CC | 
|                 
                 Finance 
Use Tax Reconciliation 
 |            
        ||
| Building Department Conditions to be Completed | Open | Prior to Issuance of CO/CC | 
|                 
                 Building Department 
Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
 
 |            
        ||
| Building Department Conditions to be Completed | Resolved | Prior to Issuance of TCO/CO/CC | 
|                 
                 Building Department 
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. 
 |            
        ||
| Building Department Conditions to be Completed | Resolved | Prior to Issuance of TCO/CO/CC | 
|                 
                 Building Department 
Applicants/Owners must apply for all required Trade Permits as parent permits to the Building Permit for all work that requires Electrical, Plumbing, Mechanical, or Gas Permits. 
 |            
        ||
| Building Department Conditions to be Completed | Resolved | Prior to Full Building Permit Issuance | 
|                 
                 Building Department 
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of existing construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 11/25/2024 12:13 PM]  
 |            
        ||
| Miscellaneous Conditions | Resolved | Prior to Rough Building Wall Inspections | 
|                 
                 Fire Prevention 
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Charles Brookshire @ 11/12/2024 8:51 PM]  
 |            
        ||
| Vested Approval Conditions | Resolved | Prior to Issuance of CO/CC | 
|                 
                 Planning Department 
Compliance with PL20240033 conditions of approval required.  
 |            
        ||
| MF/Com/I Planning CO Review | Resolved | Prior to Issuance of TCO/CO/CC | 
|                 
                 Planning Department 
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code.  Specifically this will include inspection of parking lot striping.  [Jeremy Brown @ 04/23/2025 10:29 AM]  
 |            
        ||
| Miscellaneous Conditions | Resolved | Prior to Issuance of TCO/CO/CC | 
|                 
                 GIS 
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane. 
 
 |            
        ||
| Final Fire Inspection Required | Resolved | Prior to Issuance of CO/CC | 
|                 
                 Fire Prevention 
Final Fire Alarm and Sprinkler Inspections Required.  [Shannon Yaconiello @ 11/13/2024 1:17 PM]  
 |            
        ||
| Building Department Conditions to be Completed | Resolved | Prior to Issuance of TCO/CO/CC | 
|                 
                 Building Department 
Deferred Submital Required to fully Approve the Plans, Permit is approved with the owner agreeing all work being done or proceeding forward under this Issued Building Permit is at the owners risk and acknowledgment accepting the fact we may have deny this requested use, and all work may have to be removed if all Reviewing Departments do not approve a future site plan, easement, and proposed access to your unit by utilizing the rear door of this proposed unit as the main entrance. Owner accepted all risks by email on 11/22/2024. [Todd Carr @ 11/22/2024 1:32 PM]  
 |            
        ||
| Miscellaneous Conditions | Open | Prior to Issuance of CO/CC | 
|                 
                 Planning Department 
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code.  Specifically this will include inspection of landscape plantings and interior parking lot landscape forms.  [Jeremy Brown @ 04/23/2025 10:30 AM] 
Site Inspection on 10/17 showed missing striping of two spaces along the Eastern property line, along with 2 missing ADA spaces.  Prior to full CO, these issues must also be resolved.  [Jeremy Brown @ 10/27/2025 4:25 PM]  
 |            
        ||
| Reference Number | Status | Type | 
|---|---|---|
| SPRPL241910 | Closed | Plumbing | 
| SPRMH241914 | Closed | Mechanical | 
| SPREL250013 | Closed | Electrical | 
| SPREL250036 | Closed | Electrical | 