Summary

SPRRN241653
Alteration
Permit(s) Issued
ROSS, TIMOTHY JAMES
Alteration
U - Utility, miscellaneous
R-2 - Residential, multiple family
"Interior tenant finish unit 10 Riverfront Park, project will create a new residential dwelling unit on level 2 that was originally constructed without a permit in the past, and re-configuration of space on level 1 as well."
10/21/2024
02/27/2025

Locations

Permits

Permit Number: SPRRN241653-BD1

Building
Issued

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
COO Review - Planning TCO Approved 10/27/2025 10/27/2025
COO Review - GIS Land Development Approved 10/27/2025 10/27/2025
COO Review - Fire Code Failed 10/27/2025 10/24/2025
COO Review - Finance Department TCO Approved 10/27/2025 10/21/2025
COO Review - Building Code Failed 10/27/2025 10/20/2025
GIS Land Development Review Approved 02/07/2025 02/10/2025
Utilities Review - City Approved 02/07/2025 02/07/2025
Building Code Review Approved 02/07/2025 02/04/2025
Fire Code Review Approved 10/29/2024 10/30/2024
Utilities Review - City Failed 10/29/2024 10/30/2024
GIS Land Development Review Failed 10/29/2024 10/30/2024
Planning Review Approved 10/29/2024 10/28/2024
Building Code Review Failed 10/29/2024 10/25/2024
Finance Department Review Approved 10/29/2024 10/22/2024

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Roofing Inspection Pending
Drywall Inspection Pending
Structural Inspection Pending
Lath/Veneer Inspection Pending
Shower Pan Pending
Wall/Roof Sheeting Pending
Footing Inspection Pending
Building Final Inspection Pending
Corrections:


Building Department Corrections to be Completed
Outstanding
10/20/2025
Building Department Corrections to be Completed 1. Install handrail to loft 2. Submit intumescent paint thickness testing 3. Obtain sub permits for electric and plumbing work done for kitchen sink and upstairs sink

Footing Inspection Partial Pass 3/12/2025 3/12/2025 03/12/2025
Silas Ebbert
Framing Inspection Partial Pass 3/25/2025 3/26/2025 03/26/2025
Silas Ebbert
Framing Inspection Passed 6/26/2025 6/26/2025 06/26/2025
Silas Ebbert
Insulation Inspection Passed 6/27/2025 6/27/2025 06/27/2025
Silas Ebbert
Building Final Inspection Failed 10/20/2025 10/20/2025 10/20/2025
Silas Ebbert
Corrections:


Building Department Corrections to be Completed
Carried Forward
10/20/2025
Building Department Corrections to be Completed 1. Install handrail to loft 2. Submit intumescent paint thickness testing 3. Obtain sub permits for electric and plumbing work done for kitchen sink and upstairs sink

Conditions

Condition Status Category
Use Tax Reconciliation Open Prior to Issuance of CO/CC
Finance
Use Tax Reconciliation
Building Department Conditions to be Completed Open Prior to Issuance of CO/CC
Building Department
All fees entered by the applicant initially have been accepted. [Todd Carr @ 10/25/2024 3:15 PM] Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance. All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
Building Department Conditions to be Completed Resolved Prior to Issuance of CO/CC
Building Department
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 10/25/2024 3:15 PM]
Building Department Conditions to be Completed Open Prior to Issuance of CO/CC
Building Department
Applicants/Owners must apply for all required Trade Permits as parent permits to the Building Permit for all work that requires Electrical, Plumbing, Mechanical, or Gas Permits. [Todd Carr @ 10/25/2024 3:15 PM]
Building Department Conditions to be Completed Resolved Prior to Rough Building Wall Inspections
Building Department
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of exisitng construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 10/25/2024 3:16 PM]
MF/Com/I Planning CO Review Resolved Prior to Issuance of TCO/CO/CC
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 10:09 AM]
Vested Approval Conditions Resolved
Planning Department
Compliance with PL20240033 conditions of approval required.
Miscellaneous Conditions Resolved Prior to Drywall Inspections Scheduled
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Mike Middleton @ 10/30/2024 3:40 PM]
Final Fire Inspection Required Open Prior to Issuance of CO/CC
Fire Prevention
Alarm passed. Must pass sprinkler final before TCO/CO. [Shannon Yaconiello @ 10/24/2025 10:53 AM] Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 10/31/2024 9:12 AM]
Miscellaneous Conditions Open Prior to Issuance of TCO/CO/CC
GIS
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane.
Miscellaneous Conditions Open Prior to Issuance of CO/CC
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 10:10 AM] Site Inspection on 10/17 showed missing striping of two spaces along the Eastern property line, along with 2 missing ADA spaces. Prior to full CO, these issues must be resolved. [Jeremy Brown @ 10/27/2025 4:25 PM]

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
Permit
Report
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
10/25/2024 Plans 1920 Bridge Lane units 8-14 origianal constructin plans
10/31/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
02/04/2025 Letter Permit Review Response Letter Utilities (11)
02/04/2025 Plans SIDEWALK EASEMENT Recorded 122324
02/10/2025 Mechanical Plumbing Drawings (Stamped)
02/10/2025 Plans Architectural Drawings (Stamped)
02/10/2025 Plans Structural Drawings (Stamped)
02/10/2025 Electrical Drawings (Stamped)
05/23/2025 Report 20 min36 door LS d
05/23/2025 Report fire guard specs