| Date Returned | Name | 
|---|---|
| 01/13/2025 | ArchitecturalDrawings_RiverfrontParkUnit9_Revision 1_24061 (Stamped) | 
| 01/13/2025 | StructuralDrawings_RiverfrontParkUnit9_Revision1_24061 (Stamped) | 
| 01/13/2025 | Mechanical-PlumbingDrawings_Riverfront Park_Permit (Stamped) | 
| 01/13/2025 | ElectricalDrawings_RiverfrontParkUnit9_Permit (Stamped) | 
| Review Type | Outcome | Est. Completion Date | Completed | 
|---|---|---|---|
| Utilities Review - City | Approved | 01/09/2025 | 01/10/2025 | 
| 
                                                             
                                    Amber Gregory
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Miscellaneous
                                         
                                        Outstanding 
01/02/2025 
                                            was the first floor powder room removed?  Is there a dishwasher?
                                         
                                        
                                        
                                     | 
                                |||
| Building Code Review | Approved | 01/09/2025 | 01/09/2025 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Resolved 
01/09/2025 
                                            The plans appear to show you desire to make one apartment R-2 unit that is combined between level 1 and level 2, however there is not direct access within this Unit 9A between levels, without either going back out to a shared common corridor on the main stairs that lead to level 3, or your only other option shown is again leaving the unit to use the stairs that are built to access the private garage, then through the garage to level 1 portion of this new apartment dwelling. We cannnot approve this type of access between diffferent portions of the same dwelling unit, as using a corridor is not allowed, nor is entering and exiting a garage to access different levels of a dwelling unit. All spaces within a dwelling unit have to be accessed without leaving the dwelling unit, except to acess a garage space, but all other amenities have to be contained within the dwelling unit without leaving the dwelling unit.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Resolved 
01/09/2025 
                                            We need to know how ventilation requirements are being met in the new apartment per the sections below from the IEBC Alteration Level 2. This question pertains to rooms shown on the floor plans that have no window or door openings that would offer natural ventilation to be met. 
807.1 Reconfigured or converted spaces.
Reconfigured spaces intended for occupancy and spaces converted to habitable or occupiable space in any work area shall be provided with natural or mechanical ventilation in accordance with the International Mechanical Code.
Exception: Existing mechanical ventilation systems shall comply with the requirements of Section 807.2.
807.2 Altered existing systems.
In mechanically ventilated spaces, existing mechanical ventilation systems that are altered, reconfigured or extended shall provide not less than 5 cubic feet per minute (cfm) (0.0024 m3/s) per person of outdoor air and not less than 15 cfm (0.0071 m3/s) of ventilation air per person, or not less than the amount of ventilation air determined by the Indoor Air Quality Procedure of ASHRAE 62.1.
                                         
                                        
                                        
                                     | 
                                |||
| Permit is now approved with new resubmittals | |||
| Fire Code Review | Approved | 10/25/2024 | 10/30/2024 | 
| 
                                                             
                                    Mike Middleton
                                    
                                 
                             | 
                        |||
| Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Mike Middleton @ 10/30/2024 12:27 PM] | |||
| Planning Review | Approved | 10/25/2024 | 10/28/2024 | 
| 
                                                             
                                    Jeremy Brown
                                    
                                 
                             | 
                        |||
| Utilities Review - City | Failed | 10/25/2024 | 10/28/2024 | 
| 
                                                             
                                    Amber Gregory
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Miscellaneous
                                         
                                        Carried Forward 
01/02/2025 
                                            was the first floor powder room removed?  Is there a dishwasher?
                                         
                                        
                                        
                                     | 
                                |||
| Building Code Review | Failed | 10/25/2024 | 10/23/2024 | 
| 
                                                             
                                    Todd Carr
                                    
                                 
                             | 
                        |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
01/02/2025 
                                            The plans appear to show you desire to make one apartment R-2 unit that is combined between level 1 and level 2, however there is not direct access within this Unit 9A between levels, without either going back out to a shared common corridor on the main stairs that lead to level 3, or your only other option shown is again leaving the unit to use the stairs that are built to access the private garage, then through the garage to level 1 portion of this new apartment dwelling. We cannnot approve this type of access between diffferent portions of the same dwelling unit, as using a corridor is not allowed, nor is entering and exiting a garage to access different levels of a dwelling unit. All spaces within a dwelling unit have to be accessed without leaving the dwelling unit, except to acess a garage space, but all other amenities have to be contained within the dwelling unit without leaving the dwelling unit.
                                         
                                        
                                        
                                     | 
                                |||
| 
                                         
                                            Building Department Corrections to be Completed
                                         
                                        Carried Forward 
01/02/2025 
                                            We need to know how ventilation requirements are being met in the new apartment per the sections below from the IEBC Alteration Level 2. This question pertains to rooms shown on the floor plans that have no window or door openings that would offer natural ventilation to be met. 
807.1 Reconfigured or converted spaces.
Reconfigured spaces intended for occupancy and spaces converted to habitable or occupiable space in any work area shall be provided with natural or mechanical ventilation in accordance with the International Mechanical Code.
Exception: Existing mechanical ventilation systems shall comply with the requirements of Section 807.2.
807.2 Altered existing systems.
In mechanically ventilated spaces, existing mechanical ventilation systems that are altered, reconfigured or extended shall provide not less than 5 cubic feet per minute (cfm) (0.0024 m3/s) per person of outdoor air and not less than 15 cfm (0.0071 m3/s) of ventilation air per person, or not less than the amount of ventilation air determined by the Indoor Air Quality Procedure of ASHRAE 62.1.
                                         
                                        
                                        
                                     | 
                                |||
| Plan Review has been completed, the valuations entered for this unit have been accepted, and align with our square footage calculations. Please take time to review the open conditions we have applied to this permit as well as part of our review process. See corrections listed below that need responses before we approve our review. | |||
| Finance Department Review | Approved | 10/25/2024 | 10/21/2024 | 
| 
                                                             
                                    Sondra Spratta
                                    
                                 
                             | 
                        |||
| Inspection | Outcome | Requested | Scheduled | Date Inspected | 
|---|---|---|---|---|
| Roofing Inspection | Pending | |||
| Building Final Inspection | Pending | |||
| Structural Inspection | Pending | |||
| Lath/Veneer Inspection | Pending | |||
| Shower Pan | Pending | |||
| Wall/Roof Sheeting | Pending | |||
| Framing Inspection | Pending | |||
| Drywall Inspection | Pending | |||
| Framing Inspection | Partial Pass | 3/17/2025 | 3/17/2025 | 03/17/2025 | 
| Silas Ebbert | ||||
| Insulation Inspection | Passed | 3/24/2025 | 3/24/2025 | 03/24/2025 | 
| Silas Ebbert | ||||
| Drywall Inspection | Partial Pass | 4/7/2025 | 4/7/2025 | 04/07/2025 | 
| Ron Norton | ||||
| Condition | Status | Category | 
|---|---|---|
| Use Tax Reconciliation | Open | Prior to Issuance of CO/CC | 
|                 
                 Finance 
Use Tax Reconciliation 
 |            
        ||
| Building Department Conditions to be Completed | Open | Prior to Issuance of CO/CC | 
|                 
                 Building Department 
Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued
 [Todd Carr @ 10/23/2024 2:39 PM]  
 |            
        ||
| Building Department Conditions to be Completed | Open | Prior to Issuance of TCO/CO/CC | 
|                 
                 Building Department 
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 10/23/2024 2:39 PM]   
 |            
        ||
| Building Department Conditions to be Completed | Open | Prior to Issuance of TCO/CO/CC | 
|                 
                 Building Department 
Applicants/Owners must apply for all required Trade Permits as parent permits to the Building Permit for all work that requires Electrical, Plumbing, Mechanical, or Gas Permits. [Todd Carr @ 10/23/2024 2:40 PM]  
 |            
        ||
| Building Department Conditions to be Completed | Resolved | Prior to Rough Building Wall Inspections | 
|                 
                 Building Department 
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of exisitng construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 10/23/2024 2:40 PM]  
 |            
        ||
| MF/Com/I Planning CO Review | Open | Prior to Issuance of TCO/CO/CC | 
|                 
                 Planning Department 
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code.  Specifically this will include inspection of parking lot striping.  [Jeremy Brown @ 04/23/2025 9:09 AM]  
 |            
        ||
| Vested Approval Conditions | Resolved | |
|                 
                 Planning Department 
Compliance with PL20240033 conditions of approval required.  
 |            
        ||
| Miscellaneous Conditions | Resolved | Prior to Rough Building Wall Inspections | 
|                 
                 Fire Prevention 
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Mike Middleton @ 10/30/2024 12:28 PM]  
 |            
        ||
| Final Fire Inspection Required | Open | Prior to Issuance of CO/CC | 
|                 
                 Fire Prevention 
Final Fire Alarm and Sprinkler Inspections Required.  [Shannon Yaconiello @ 10/31/2024 9:20 AM]  
 |            
        ||
| Miscellaneous Conditions | Open | Prior to Issuance of CO/CC | 
|                 
                 Planning Department 
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code.  Specifically this will include inspection of landscape plantings and interior parking lot landscape forms.  [Jeremy Brown @ 04/23/2025 9:10 AM]  
 |            
        ||
| Reference Number | Status | Type | 
|---|---|---|
| SPRPL250145 | Permit(s) Issued | Plumbing | 
| SPREL250270 | Closed | Electrical | 
| Date Uploaded | File Type | Name | 
|---|---|---|
| Report | ||
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Permit | PERMIT - DETAILED.PDF | |
| Receipt | RECEIPT.PDF | |
| Receipt | RECEIPT.PDF | |
| 10/23/2024 | Plans | 1920 Bridge Lane units 8-14 origianal constructin plans | 
| 10/31/2024 | Letter | Permit Review Corrections Notice (Generate/Send Correction Notice) | 
| 12/31/2024 | Plans | SIDEWALK EASEMENT Recorded 122324 | 
| 01/13/2025 | Plans | Mechanical-PlumbingDrawings_Riverfront Park_Permit (Stamped) | 
| 01/13/2025 | Plans | ElectricalDrawings_RiverfrontParkUnit9_Permit (Stamped) | 
| 01/13/2025 | Plans | StructuralDrawings_RiverfrontParkUnit9_Revision1_24061 (Stamped) | 
| 01/13/2025 | Plans | ArchitecturalDrawings_RiverfrontParkUnit9_Revision 1_24061 (Stamped) | 