Summary

SPRRN241636
Alteration
Permit(s) Issued
WINN, VANESSA L & COLLETT, GABRIEL R
Alteration
Interior tenant finish unit 8 Riverfront Park, project will create a new residential dwelling unit on level 2 that was originally constructed without a permit in the past, and re-configuration of space on level 1 as well
10/17/2024
09/19/2025
09/19/2028

Locations

Permits

Permit Number: SPRRN241636-BD1

Building
Returned for Correction

Reviews

Review Type Outcome Est. Completion Date Completed
Building Code Review Approved 10/03/2025 09/29/2025
Planning Review Approved 09/02/2025 09/02/2025
Building Code Review Approved 09/02/2025 08/26/2025
Planning Review Failed 05/27/2025 05/29/2025
Utilities Review - City Approved 05/27/2025 05/28/2025
Building Code Review Failed 05/27/2025 05/19/2025
Building Code Review Failed 01/23/2025 01/15/2025
Utilities Review - City Failed 01/23/2025 01/15/2025
Utilities Review - City Failed 10/31/2024 11/01/2024
Planning Review Approved 10/31/2024 11/01/2024
Building Code Review Failed 10/31/2024 10/28/2024
Fire Code Review Approved 10/31/2024 10/18/2024
Finance Department Review Approved 10/31/2024 10/18/2024

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Drywall Inspection Pending
Insulation Inspection Pending
Framing Inspection Pending
Footing Inspection Pending
Building Final Inspection Pending

Conditions

Condition Status Category
Use Tax Reconciliation Open Prior to Issuance of CO/CC
Finance
Use Tax Reconciliation
Miscellaneous Conditions Open Prior to Rough Building Wall Inspections
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms. [Mike Middleton @ 10/18/2024 3:26 PM] Presently under the Fire Resistance Requirements text box in the architectural plan it states that smoke alarms shall be provided in accordance with IBC sect 907.2.11.2 This is NOT correct. Steamboat fire has local requirements that can be found in the Steamboat Springs Fire Department Alarm Policy. Please see section section 2.3 under the General Requirements. It states in part that "Smoke detectors shall sound local/unit alarm only, and receive power from and be supervised by the fire alarm panel". In other words AC smoke detectors are not allowed. https://www.steamboatsprings.net/DocumentCenter/View/374
Final Fire Inspection Required Open Prior to Issuance of CO/CC
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 10/18/2024 3:26 PM]
Building Department Conditions to be Completed Open Prior to Issuance of CO/CC
Building Department
Initial Total Construction Valuation was provided at $140,700 and accepted. Value of Work to be permitted was calculated by takeing 996 SQ FT x $75 = $74,700 Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance. All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued. [Todd Carr @ 10/28/2024 8:51 AM]
Building Department Conditions to be Completed Open Prior to Issuance of CO/CC
Building Department
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 10/28/2024 8:52 AM]
Building Department Conditions to be Completed Open Prior to Issuance of CO/CC
Building Department
Applicants/Owners must apply for all required Trade Permits as parent permits to the Building Permit for all work that requires Electrical, Plumbing, Mechanical, or Gas Permits. [Todd Carr @ 10/28/2024 8:52 AM]
Building Department Conditions to be Completed Open Prior to Rough Building Wall Inspections
Building Department
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of existing construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 10/28/2024 8:53 AM]
MF/Com/I Planning CO Review Open Prior to Issuance of TCO/CO/CC
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 8:28 AM]
Vested Approval Conditions Resolved Prior to Issuance of TCO/CO/CC
Planning Department
Compliance with PL20240033 conditions of approval required.
Miscellaneous Conditions Open Prior to Issuance of CO/CC
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 8:29 AM]
Miscellaneous Conditions Open Prior to Issuance of CO/CC
Planning Department
Prior to Issuance of CO, Owner to update Deed restriction to reflect adjusted square footage calculation of 1,644 sf for unit 8A
Miscellaneous Conditions Open Prior to Issuance of TCO/CO/CC
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
Plans 1920 BRIDGE LANE UNITS 8-14 ORIGIANAL CONSTRUCTIN PLANS.PDF
Letter PERMIT - DETAILED.PDF
Email PERMIT APPLICATION EXPIRATION NOTICE SPRRN241636.MSG
Letter PERMIT REVIEW CORRECTIONS NOTICE.PDF
Letter PERMIT REVIEW CORRECTIONS NOTICE0.PDF
Letter PERMIT REVIEW CORRECTIONS NOTICE1.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
Plans SIDEWALK EASEMENT RECORDED 122324 (STAMPED).PDF
09/03/2025 Plans Architectural Plans 08-26-2025 (Received) (Stamped)
09/03/2025 ELECTRICALDRAWINGS_RIVERFRONTPARKUNIT8_PERMIT.PDF (Stamped)
09/29/2025 Plans Structural Drawings_9-26-25_Revision 4 (Stamped)