| Date Returned | Name |
|---|---|
| 09/03/2025 | Architectural Plans 08-26-2025 (Received) (Stamped) |
| 09/29/2025 | Structural Drawings_9-26-25_Revision 4 (Stamped) |
| SIDEWALK EASEMENT RECORDED 122324 (STAMPED).PDF | |
| 09/03/2025 | ELECTRICALDRAWINGS_RIVERFRONTPARKUNIT8_PERMIT.PDF (Stamped) |
| Review Type | Outcome | Est. Completion Date | Completed |
|---|---|---|---|
| Building Code Review | Approved | 10/03/2025 | 09/29/2025 |
| Planning Review | Approved | 09/02/2025 | 09/02/2025 |
| Building Code Review | Approved | 09/02/2025 | 08/26/2025 |
| Planning Review | Failed | 05/27/2025 | 05/29/2025 |
| Utilities Review - City | Approved | 05/27/2025 | 05/28/2025 |
| Building Code Review | Failed | 05/27/2025 | 05/19/2025 |
| Building Code Review | Failed | 01/23/2025 | 01/15/2025 |
| Utilities Review - City | Failed | 01/23/2025 | 01/15/2025 |
| Utilities Review - City | Failed | 10/31/2024 | 11/01/2024 |
| Planning Review | Approved | 10/31/2024 | 11/01/2024 |
| Building Code Review | Failed | 10/31/2024 | 10/28/2024 |
| Fire Code Review | Approved | 10/31/2024 | 10/18/2024 |
| Finance Department Review | Approved | 10/31/2024 | 10/18/2024 |
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Drywall Inspection | Pending | |||
| Insulation Inspection | Pending | |||
| Building Final Inspection | Pending | |||
| Footing Inspection | Passed | 2/17/2026 | 2/17/2026 | 02/17/2026 |
| Silas Ebbert | ||||
| Framing Inspection | Passed | 4/2/2026 | 04/02/2026 | |
| Silas Ebbert | ||||
| Condition | Status | Category |
|---|---|---|
| Use Tax Reconciliation | Open | Prior to Issuance of CO/CC |
|
Finance
Use Tax Reconciliation
|
||
| Miscellaneous Conditions | Open | Prior to Rough Building Wall Inspections |
|
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms. [Mike Middleton @ 10/18/2024 3:26 PM] Presently under the Fire Resistance Requirements text box in the architectural plan it states that smoke alarms shall be provided in accordance with IBC sect 907.2.11.2 This is NOT correct. Steamboat fire has local requirements that can be found in the Steamboat Springs Fire Department Alarm Policy. Please see section section 2.3 under the General Requirements. It states in part that "Smoke detectors shall sound local/unit alarm only, and receive power from and be supervised by the fire alarm panel". In other words AC smoke detectors are not allowed. https://www.steamboatsprings.net/DocumentCenter/View/374
|
||
| Final Fire Inspection Required | Open | Prior to Issuance of CO/CC |
|
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 10/18/2024 3:26 PM]
|
||
| Building Department Conditions to be Completed | Open | Prior to Issuance of CO/CC |
|
Building Department
Initial Total Construction Valuation was provided at $140,700 and accepted.
Value of Work to be permitted was calculated by takeing 996 SQ FT x $75 = $74,700
Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance.
All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued.
[Todd Carr @ 10/28/2024 8:51 AM]
|
||
| Building Department Conditions to be Completed | Open | Prior to Issuance of CO/CC |
|
Building Department
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 10/28/2024 8:52 AM]
|
||
| Building Department Conditions to be Completed | Open | Prior to Issuance of CO/CC |
|
Building Department
Applicants/Owners must apply for all required Trade Permits as parent permits to the Building Permit for all work that requires Electrical, Plumbing, Mechanical, or Gas Permits. [Todd Carr @ 10/28/2024 8:52 AM]
|
||
| Building Department Conditions to be Completed | Resolved | Prior to Rough Building Wall Inspections |
|
Building Department
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of existing construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 10/28/2024 8:53 AM]
|
||
| MF/Com/I Planning CO Review | Open | Prior to Issuance of TCO/CO/CC |
|
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 8:28 AM]
|
||
| Vested Approval Conditions | Resolved | Prior to Issuance of TCO/CO/CC |
|
Planning Department
Compliance with PL20240033 conditions of approval required.
|
||
| Miscellaneous Conditions | Open | Prior to Issuance of CO/CC |
|
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 8:29 AM]
|
||
| Miscellaneous Conditions | Open | Prior to Issuance of CO/CC |
|
Planning Department
Prior to Issuance of CO, Owner to update Deed restriction to reflect adjusted square footage calculation of 1,644 sf for unit 8A
|
||
| Miscellaneous Conditions | Open | Prior to Issuance of TCO/CO/CC |
|
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping.
|
||
| Reference Number | Status | Type |
|---|---|---|
| SPREL260072 | Permit(s) Issued | Electrical |
| SPRPL260308 | On Hold | Plumbing |
| Date Uploaded | File Type | Name |
|---|---|---|
| Plans | 1920 BRIDGE LANE UNITS 8-14 ORIGIANAL CONSTRUCTIN PLANS.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Report | INSPECTION REPORT.PDF | |
| Letter | PERMIT - DETAILED.PDF | |
| PERMIT APPLICATION EXPIRATION NOTICE SPRRN241636.MSG | ||
| Letter | PERMIT REVIEW CORRECTIONS NOTICE.PDF | |
| Letter | PERMIT REVIEW CORRECTIONS NOTICE0.PDF | |
| Letter | PERMIT REVIEW CORRECTIONS NOTICE1.PDF | |
| Receipt | RECEIPT.PDF | |
| Receipt | RECEIPT.PDF | |
| Plans | SIDEWALK EASEMENT RECORDED 122324 (STAMPED).PDF | |
| 09/03/2025 | Plans | Architectural Plans 08-26-2025 (Received) (Stamped) |
| 09/03/2025 | ELECTRICALDRAWINGS_RIVERFRONTPARKUNIT8_PERMIT.PDF (Stamped) | |
| 09/29/2025 | Plans | Structural Drawings_9-26-25_Revision 4 (Stamped) |