Summary

SPRMU260244
New Multi-Unit Residential
In Plan Check
FV BASECAMP TOWNHOMES LLC
New
R-2 - Residential, multiple family
New Construction, 5-Story, 72-Unit Apartment building on Lot 3, Steamboat Basecamp.
03/16/2026
09/12/2026

Locations

Property
331900003

Address
1845 BIG BEND DR

Permits

Permit Number: SPRMU260244-BD1

Building
In Plan Check

Reviews

Review Type Outcome Est. Completion Date Completed
Finance Department Review Approved 04/14/2026 03/31/2026
Building Code Review Pending 04/14/2026
Electrical Review Pending 04/14/2026
Fire Code Review Pending 04/14/2026
Engineering Review Pending 04/14/2026
Planning Review Pending 04/14/2026
GIS Land Development Review Pending 04/14/2026
Construction Site Management Review Pending 04/14/2026
Utilities Review - City Pending 04/14/2026
External Agencies Review Pending 04/14/2026

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Department Conditions to be Completed Open Prior to Footing/Foundation Inspection
Building Department
NWCC must be retained to observe bearing soils once all clay has been removed to projected depth of 2 to 4 feet, a report must be provided back to RCRBC of the observation work completed by NWCC stating they have approved the bearing soils found and have approved structural fill materials to be placed upon these bearing soils found, report due back before any footing or pad inspections being scheduled. [Todd Carr @ 03/30/2026 2:02 PM]
Building Department Conditions to be Completed Open Prior to Footing/Foundation Inspection
Building Department
NWCC must provide a Structural Fill Special Inspection letter to the Contractor and Engineer of Record, who will review the letter then upload it to the permit for RCRBD to review, this report shall verify all compaction has been met and approved to begin to form up footings and pads upon the new structural fill materials, report due back prior to scheduling and footing inspections. [Todd Carr @ 03/30/2026 2:04 PM]
Use Tax Reconciliation Open Prior to Issuance of CO/CC
Finance
Use Tax Recon work must be completed with City Finance: Contact the city directly for more information @ constructionusetax@steamboatsprings.net
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Structural Plans Sheet S0002 Deferred Submittal Processes and Shop Drawings: Per the Structural EOR all deferred submittals shall be routed through the Architect of Record first for review and approval comments, then routed to the GC for review and approval comments, then submitted back to the Structural EOR for final review, then routed back to the AOR who willl be responsible to upload all RFI's, Deferred Submittals and Shop Drawings to the permit for RCRBD to review and approve, prior to the GC requesting any inspections to be completed on any of these items in the field. All Shop Drawings shall be submitted with calculations noted and signed and sealed by the EOR. Deferred Submittals per the Structural EOR are: Premanufactured wood trusses and their connections, Automatic Take-Up Tension Rod Ssytems at Wood Shear Wall Boundaries, Pre-fabricated stair units and their connections, Premanufactured hand/stair railing and their connections, Fall arrest systemms and ther connections to the structure. These 5 items have seperate conditions opene upon them, and this condition will be left open only for RFI's and a reminder to the process required to be taken on deferred submittals. [Todd Carr @ 03/31/2026 10:19 AM]
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Premanufactured wood trusses and their connections Stamp and Sealed to be loaded prior to installation in the field: [Todd Carr @ 03/31/2026 10:18 AM]
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Automatic Take-Up Tension Rod Ssytems at Wood Shear Wall Boundaries, Stamp and Sealed to be loaded prior to installation in the field: [Todd Carr @ 03/31/2026 10:18 AM]
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Pre-fabricated stair units and their connections Stamp and Sealed to be loaded prior to installation in the field: [Todd Carr @ 03/31/2026 10:18 AM]
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Premanufactured hand/stair railing and their connections, Stamp and Sealed to be loaded prior to installation in the field: [Todd Carr @ 03/31/2026 10:18 AM]
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Fall arrest systemms and ther connections to the structure. Stamp and Sealed to be loaded prior to installation in the field: [Todd Carr @ 03/31/2026 10:18 AM]
Building Department Conditions to be Completed Open Prior to Issuance of TCO/CO/CC
Building Department
Special Inspections Noted on Sheet S0005 related to Structural Steel, Concrete, Masonry, Wood and Foundations: Contractor shall maintaina all required passed or failed special inspection reports throughout the project, share these reports with the Structural EOR, and provide RCRBD a copy of the Final Conformance Report of all special inspections being completed on the project prior to TCO unless RCRBD needs to request reports sooner, all failed inspections that are critical or may required changes to the plans shall be reported to RCRBD as soon as possible throughout the project and share the corrected results with us as well. [Todd Carr @ 03/31/2026 1:33 PM]

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
Letter INCOMPLETE APPLICATION NOTICE.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
Receipt RECEIPT.PDF
03/16/2026 Plans Utility Plans
03/16/2026 Plans Structural Drawings
03/16/2026 Plans Basecamp-II_Permit_KLAA_Structural-Calculations 1of2
03/16/2026 Plans Basecamp-II_Permit_KLAA_Structural-Calculations 2of2
03/16/2026 Study Original Geotechnical Report 7-27-2022
03/16/2026 Study Steamboat Basecamp Apts Lot 3 Geotechnical Recommendations Review Report
03/16/2026 Photograph Lot 3 Photo from Assessor Site
03/16/2026 Photograph Photo - Lot 3 Steamboat Basecamp
03/16/2026 Plans MEP Drawings
03/16/2026 Plans Landscape Plan
03/16/2026 Form Fire Flow Availability - Lot 3 Steamboat Basecamp
03/16/2026 Study Fire Code Analysis
03/16/2026 Study Life Safety Plans
03/16/2026 Plans Civil Plans
03/23/2026 Plans Civil Site Plan - Basecamp PH2
03/23/2026 Plans Steamboat_Basecamp II - DRAFT SPECIFICATIONS
03/23/2026 Plans CSMP Basecamp II
03/23/2026 Plans Basecamp 2 - Architectural Drawings_updated 3_23_26