Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Engineering Review | Approved | 06/02/2022 | 06/02/2022 |
Emrick Soltis, P.E., CFM
|
|||
See Document Markups
Resolved
06/02/2022
Sign/Seal Civil Plans
|
|||
See Document Markups
Resolved
06/02/2022
C.100: Section of sidewalk shall be shown as remaining. Until future construction of development.
|
|||
See Document Markups
Resolved
06/02/2022
C.100: Gravel driveway needs to be shown as paved to ROW line unless building permit for development is issued and utilized as construction access prior to G&F closeout.
|
|||
Construction Site Management Review | Approved | 06/02/2022 | 06/02/2022 |
Scott Slamal
|
|||
Control Measure Specifications
Outstanding
05/25/2022
Provide the installation and implementation specifications for all sediment and erosion control measures. Include note stating, "Vehicle tracking pad must be 5-8" coarse aggregate underlain by geotextile material or FODs tracking mat or similar device installed per manufactures specifications. Roadway adjacent to project area shall be maintained free of mud and dirt and swept daily as needed."
|
|||
Concrete Washout
Outstanding
05/25/2022
Show location for concrete washout.
|
|||
Control Measures for Temporary and Final Stabilization
Outstanding
05/25/2022
Describe the control measures used to achieve temporary and final stabilization of all disturbed areas at the site (e.g., hydro mulching, erosion control blankets, turf reinforcement mats, tracking). Erosion control blankets will need to be installed in the newly constructed roadside ditch and on slopes steeper than 3:1.
|
|||
Perimeter Control Measures
Outstanding
05/25/2022
Show perimeter sediment control measures.
|
|||
Miscellaneous
Outstanding
05/25/2022
Include CSMP standard notes on CSMP site map
|
|||
Construction Site Management Review | Failed | 05/18/2022 | 05/19/2022 |
Scott Slamal
|
|||
Control Measure Specifications
Carried Forward
05/25/2022
Provide the installation and implementation specifications for all sediment and erosion control measures. Include note stating, "Vehicle tracking pad must be 5-8" coarse aggregate underlain by geotextile material or FODs tracking mat or similar device installed per manufactures specifications. Roadway adjacent to project area shall be maintained free of mud and dirt and swept daily as needed."
|
|||
Concrete Washout
Carried Forward
05/25/2022
Show location for concrete washout.
|
|||
Control Measures for Temporary and Final Stabilization
Carried Forward
05/25/2022
Describe the control measures used to achieve temporary and final stabilization of all disturbed areas at the site (e.g., hydro mulching, erosion control blankets, turf reinforcement mats, tracking). Erosion control blankets will need to be installed in the newly constructed roadside ditch and on slopes steeper than 3:1.
|
|||
Perimeter Control Measures
Carried Forward
05/25/2022
Show perimeter sediment control measures.
|
|||
Miscellaneous
Carried Forward
05/25/2022
Include CSMP standard notes on CSMP site map
|
|||
Engineering Review | Failed | 05/18/2022 | 05/18/2022 |
Emrick Soltis, P.E., CFM
|
|||
See Document Markups
Carried Forward
05/25/2022
Sign/Seal Civil Plans
|
|||
See Document Markups
Carried Forward
05/25/2022
C.100: Section of sidewalk shall be shown as remaining. Until future construction of development.
|
|||
See Document Markups
Carried Forward
05/25/2022
C.100: Gravel driveway needs to be shown as paved to ROW line unless building permit for development is issued and utilized as construction access prior to G&F closeout.
|
|||
Planning Review | Approved | 05/18/2022 | 05/18/2022 |
Toby Stauffer, AICP
|
|||
Building Code Review | Approved | 05/18/2022 | 05/11/2022 |
Malea Michael-Ferrier
|
|||
G&F permit approved, no buildings or structures are being proposed and none have been reviewed or approved. |
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Miscellaneous Conditions | Open | |
Planning Department
At the time of project completion, request certificate of occupancy inspections from the Department of Planning and Community Development to ensure the project has been built in accordance with the approved plans and the Community Development Code. The inspection may include but is not limited to general site planning and grading, landscaping and revegetation, outdoor lighting, parking and parking lot striping, retaining walls, building height and location, number of dwelling units, and consistency with approved building design.
|