City of Steamboat Springs Web Portal

Planning Application Status

PL20240113


You will only be able to view fees if you are a contact on the planning application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PL20240113
Village Drive Apartments - Consolidation Plat
Preliminary Plat
Preliminary Plat & Major Variance
Waiting for Conditions
04/13/2024
SUNSCOPE LLC
This is a preliminary plat application to consolidate two lots into one on the Mountain Office Park Subdivision.

Locations

Property
142500001

Property
142500002

Address
2955 VILLAGE DR

Application Types

Preliminary Plat & Major Variance

Planning Commission & Council
Waiting for Conditions

Hearings

Title Location Date Time
Planning Commission, 2024-06-27, 05:00 PM Citizens Meeting Room, Centennial Hall, 124 10th Street 06/27/2024 5:00 PM
Recommendation
Recommend Approval
City Council, 2024-07-16, 05:00 PM Citizens Meeting Room, Centennial Hall, 124 10th Street 07/16/2024 5:00 PM
Resolution
Approved with Conditions

Inspections

There are no inspections for this planning application, or you are not authorized to view them.

Conditions

Condition Status Category
Site Posting Affidavit Resolved Prior to Final Review
Planning Department
Site Posting Affidavit: Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
Critical Improvements - Sidewalk Open Prior to Issuance of Certificate of Occupancy/Completion
Planning Department
Sidewalk improvements along Village Drive and Walton Creek Road are considered a critical improvement and must be constructed and accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first.
Critical Improvements - Water and Sewer Open Prior to Issuance of TCO/CO/CC
Mount Werner Water and Sanitation District
Sewer main infrastructure is considered a critical improvement and must be constructed and accepted prior to issuance of a Certificate of Occupancy/Completion or approval of a Condo/Townhome Final Plat, whichever occurs first.
Civils Required at BP Open Prior to Issuance of Construction Permit
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/Grading Permit application for review and approval prior to the start of any construction.
Miscellaneous Condition Open Prior to Recording of Final Plat
Planning Department
Prior to recording the final plat a utility easement shall be included for existing utilities along the east property line.
Miscellaneous Condition Open Prior to Recording of Final Plat
Planning Department
This project is approved with removal of up to six trees as shown in the Tree Exhibit. No additional trees shall be removed for development of the subdivision and associated sidewalks.

Related Permit & Planning Applications

There are no related items for this planning application.

Documents & Images

Date Uploaded File Type Name
Letter NOTICE OF COMPLETE APPLICATION.PDF
Letter NOTICE OF FINAL DECISION.PDF
Letter NOTICE OF INCOMPLETE APPLICATION.PDF
PL2024-114 APO AFFIDAVIT.PDF
Receipt RECEIPT.PDF
SURROUNDING PROPERTY OWNER NOTIFICATION.PDF
04/13/2024 Mountain Office Park Sub FP008628
04/13/2024 Narrative Village Drive Apartments Preliminary Plat Narrative
04/13/2024 Other Signed Prel Plat App
04/16/2024 Study 20240408_12542412697_45_Soil_Map
04/16/2024 Other Prel Plat App Signature JP
05/11/2024 Letter DRT Review Comments (Generate/Send DRT Review Comments Notice)
05/11/2024 Letter Lot A Mtn Park Property Record (Received)
05/11/2024 Letter Lot B Mtn Park Property Record (Received)
05/11/2024 Plans C1 - 2033-004 Mountain Village Apartments - Preliminary Plat App - Cover (Received)
05/11/2024 Plans 2033-004 Mountain Village Apartments FPSE-C6a UT 4-12 (1) (Received)
05/11/2024 Study 20240408_12562712278_61_Soil_Report (Received)
05/28/2024 Preliminary Plat DRT Reply - Mountain Office Park 5-28-2024
06/03/2024 Mountain Village Drive Apartments CDC Variances
06/09/2024 Plans 2033-004 Mountain Village Apartments - C2 Existing Conditions Plan (Received)
06/09/2024 Plans Mtn Park Sub F2 - Site Plan (Received)
06/09/2024 Plat Mtn Park Sub F2 - Open Space Exhibit 4A (Received)
06/09/2024 Plat Mtn Park Sub F2 - Preliminary Plat (Received)
06/12/2024 2033-004 Surrounding Property Owner Mailing
07/06/2024 TreeExhibit
08/26/2024 Resolution 2024_37_PL20240113_mountain_park_pp_variance