Summary

SPRRN241841
Alteration
Permit(s) Issued
CLEVERLY, LANI K.
Alteration
Interior tenant finish unit 12 Riverfront Park. The project will create a new residential dwelling unit on level 2 that was originally constructed without a permit from the previous owner.
11/29/2024
05/15/2025
04/30/2026

Locations

Permits

Permit Number: SPRRN241841-BD1

Building
Issued

Reviews

Review Type Outcome Est. Completion Date Completed
Utilities Review - City Approved 02/10/2025 02/10/2025
Building Code Review Approved 02/10/2025 02/07/2025
GIS Land Development Review Approved 12/11/2024 12/12/2024
Utilities Review - City Failed 12/11/2024 12/11/2024
Planning Review Approved 12/11/2024 12/11/2024
Fire Code Review Approved 12/11/2024 12/10/2024
Building Code Review Failed 12/11/2024 12/09/2024
Finance Department Review Approved 12/11/2024 12/05/2024

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Building Final Inspection Pending
Framing Inspection Passed 7/21/2025 7/21/2025 07/21/2025
Todd Carr
Insulation Inspection Passed 7/21/2025 7/21/2025 07/21/2025
Todd Carr
Drywall Inspection Passed 8/13/2025 8/14/2025 08/14/2025
Todd Carr

Conditions

Condition Status Category
Use Tax Reconciliation Open Prior to Issuance of CO/CC
Finance
Use Tax Reconciliation
Building Department Conditions to be Completed Open Prior to Issuance of CO/CC
Building Department
Prior to Certificate of Occupancy being Issued, Owner/Applicant must pay all additional Fees due as a result of all new work completed that did not previously exist prior to permit issuance. All new work that has to be performed as a result of our permitting process in terms of new products, materials, appliances, equipment, and labor to install, will be added to the above square footage cost of work done previously without permits in the past, we have added a Condition to this permit that we will not provide a Certificate of Occupancy until the owner has turned in all contracts associated with hiring professional to do the work, and invoices or receipts showing all costs of materials and products purchased. If an owner is doing their own work, then labor is calculated by taking all invoices and receipts for materials and products purchased and multiplied by two to calculate labor. The owner will then be responsible to pay these fees that are accessed to the permit at the end of the project after the contractors for services, receipts, and invoices are reviewed by the Building Department prior to Certificate of Occupancy being issued. [Todd Carr @ 12/09/2024 3:00 PM]
Building Department Conditions to be Completed Resolved Prior to Issuance of CO/CC
Building Department
All Building, Electrical, Mechanical, Plumbing, or Gas Permits will have an expiration date of 1-year set on these permits once they are issued, all work must be completed within one year due to the Life Safety issues created as a result of performing work without a permit. [Todd Carr @ 12/09/2024 3:01 PM]
Building Department Conditions to be Completed Resolved Prior to Issuance of CO/CC
Building Department
Applicants/Owners must apply for all required Trade Permits as parent permits to the Building Permit for all work that requires Electrical, Plumbing, Mechanical, or Gas Permits. [Todd Carr @ 12/09/2024 3:01 PM]
Building Department Conditions to be Completed Resolved Prior to Rough Building Wall Inspections
Building Department
Prior to permit issuance, applicant/owner must schedule a pre-inspection walk-through with the Building Official, to review and determine the amount of work that must be done on the project to meet the approved plans, to review what is there in terms of existing construction that is approved in it's existing condition, and what work must be done that is not approved or does not meet the approved plans at the start of the project. [Todd Carr @ 12/09/2024 3:02 PM]
Miscellaneous Conditions Resolved Prior to Rough Building Wall Inspections
Fire Prevention
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms [Mike Middleton @ 12/10/2024 3:54 PM]
MF/Com/I Planning CO Review Open Prior to Issuance of TCO/CO/CC
Planning Department
Prior to issuance of a Temporary Certificate of Occupancy (or Certificate of Occupancy), the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of parking lot striping. [Jeremy Brown @ 04/23/2025 10:23 AM]
Vested Approval Conditions Resolved Prior to Issuance of TCO/CO/CC
Planning Department
Compliance with PL20240033 conditions of approval required.
Miscellaneous Conditions Resolved Prior to Full Building Permit Issuance
Planning Department
Per the Condition of approval for the Development Plan PL20240033 "Owners who do not record deed restrictions shall be deemed not in compliance with this development approval and may not have their building permits approved and may be subject to enforcement efforts in Municipal and/or District Court by the City". Based on our records, we do not have evidence of a recorded deed restriction. Please provide evidence or reach out to the planning department for assistance in this process. Jeremy Brown 970-871-8244
Final Fire Inspection Required Open Prior to Issuance of CO/CC
Fire Prevention
Final Fire Alarm and Sprinkler Inspections Required. [Shannon Yaconiello @ 12/11/2024 3:34 PM]
Miscellaneous Conditions Open Prior to Issuance of TCO/CO/CC
GIS
Prior to TCO being approved, the City of Steamboat Springs GIS Department will need to assign final Building Addressing and Unit Numbers and Letters to all of 1900 and 1920 Bridge Lane.
Miscellaneous Conditions Open Prior to Issuance of CO/CC
Planning Department
Prior to issuance of a full Certificate of Occupancy, the Department of Planning and Community Development will inspect the site to ensure the project has been built in accordance with the approved plans and the Community Development Code. Specifically this will include inspection of landscape plantings and interior parking lot landscape forms. [Jeremy Brown @ 04/23/2025 10:24 AM]

Related Permit & Planning Applications

Reference Number Status Type
SPREL251107 Canceled Electrical
SPREL251113 Permit(s) Issued Electrical

Documents & Images

Date Uploaded File Type Name
Receipt
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT0.PDF
Permit PERMIT - DETAILED.PDF
Receipt RECEIPT.PDF
12/13/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
02/03/2025 Plans SIDEWALK EASEMENT Recorded 122324
02/11/2025 Plans STRUCTURALDRAWINGS_24049 (1).PDF (Stamped)
02/11/2025 Plans MECHANICAL-PLUMBINGDRAWINGS.PDF (Stamped)
02/11/2025 Plans ELECTRICALDRAWINGS.PDF (Stamped)
02/11/2025 Plans ARCHITECTURALDRAWINGS 24049 (1).PDF (Stamped)