Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Mechanical Rough-in Inspection | Partial Pass | 3/12/2025 | 3/12/2025 | 03/12/2025 |
Silas Ebbert | ||||
Mechanical Rough-in Inspection | Partial Pass | 3/13/2025 | 3/13/2025 | 03/13/2025 |
Ron Norton | ||||
Mechanical Rough-in Inspection | Partial Pass | 3/20/2025 | 3/20/2025 | 03/20/2025 |
Silas Ebbert | ||||
Mechanical Rough-in Inspection | Partial Pass | 3/27/2025 | 3/27/2025 | 03/26/2025 |
Silas Ebbert | ||||
Corrections:
Building Department Corrections to be Completed
Carried Forward
03/26/2025
Strap dryer ducts every 4'
|
||||
Mechanical Rough-in Inspection | Partial Pass | 3/27/2025 | 3/27/2025 | 03/27/2025 |
Silas Ebbert | ||||
Corrections:
Building Department Corrections to be Completed
Resolved
03/27/2025
Strap dryer ducts every 4'
|
||||
Mechanical Rough-in Inspection | Partial Pass | 5/13/2025 | 5/13/2025 | 05/13/2025 |
Silas Ebbert | ||||
Mechanical Final Inspection | Partial Pass | 8/26/2025 | 8/26/2025 | 08/26/2025 |
Silas Ebbert | ||||
Mechanical Final Inspection | Partial Pass | 9/12/2025 | 9/12/2025 | 09/12/2025 |
Todd Carr | ||||
Corrections:
Building Department Corrections to be Completed
Carried Forward
09/12/2025
Building Department Corrections to be Completed
FCU2-1 in main level mechanical room the main duct coming off the unit needs to be strapped right above the unit to the ceiling. Garage heater vents will need to be moved to a distance of 4 feet from the property line on the east side lower roof.
|
||||
Mechanical Final Inspection | Passed | 9/16/2025 | 9/16/2025 | 09/16/2025 |
Todd Carr | ||||
Corrections:
Building Department Corrections to be Completed
Resolved
09/16/2025
Building Department Corrections to be Completed
FCU2-1 in main level mechanical room the main duct coming off the unit needs to be strapped right above the unit to the ceiling. Garage heater vents will need to be moved to a distance of 4 feet from the property line on the east side lower roof.
|
There are no conditions for this permit application, or you are not authorized to view them.
Reference Number | Status | Type |
---|---|---|
SPRMU231827 | Permit(s) Issued | New Multi-Unit Residential |
SPREL240532 | Closed | Electrical |
SPRPL240546 | Closed | Plumbing |
Date Uploaded | File Type | Name |
---|---|---|
Report | ||
Report | ||
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Letter | PERMIT - DETAILED.PDF |
Powered by CityView