Permit Application Status
SPRFO240628
In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Date Returned | Name |
---|---|
06/21/2024 | Soils Report - The Amble (Received) (Stamped) |
06/21/2024 | Site Plan (Stamped) |
06/21/2024 | Retaining Wall Plans (Stamped) |
06/21/2024 | Retaining Wall Calculations (Stamped) |
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Fire Code Review | Approved | 06/17/2024 | 06/21/2024 |
Charles Brookshire
|
|||
Full Permit. NB [Charles Brookshire @ 06/21/2024 12:35 PM] | |||
Construction Site Management Review | Approved | 06/17/2024 | 06/17/2024 |
Scott Slamal
|
|||
Utilities Review - Mt. Werner | Approved | 06/17/2024 | 06/14/2024 |
Beau Cahill
|
|||
Southern wall shown outside of easement on retaining wall shop drawings and Amble civil drawings. Site plan has southern wall encroaching into easement, ensure this does not happen. [bcahill @ 06/14/2024 12:23 PM] | |||
Building Code Review | Approved | 06/17/2024 | 06/14/2024 |
Todd Carr
|
|||
Please review the one condition we have added to this permit, with reference to future deferred submittals required. Also contractor shall schedule some routine inspections to be done by the Building Department on this project, so our staff can also view the leveling pad, drainage piping, and fill/compaction being completed through this process. We understand the Geotech Enginieer will be performing regular special inspections daily, however also please schedule us for a minimum of 3 to 5 site inspections throughout different phases of construction of this wall. | |||
Planning Review | Approved | 06/17/2024 | 06/12/2024 |
Toby Stauffer, AICP
|
|||
Finance Department Review | Approved | 06/17/2024 | 06/04/2024 |
Sondra Spratta
|
|||
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Foundation/Under Slab Insulation | Pending | |||
Footing Inspection | Pending | |||
Foundation Inspection | Pending | |||
Water Service Inspection | Pending | |||
Amber Gregory | ||||
Sewer Service Inspection | Pending | |||
Amber Gregory | ||||
Interim Construction Site Management | Pending | |||
Scott Slamal | ||||
Final Construction Site Management | Pending | |||
Scott Slamal | ||||
Foundation Water Proofing | Pending | |||
Radon Piping | Pending | |||
Foundation Drain Inspection | Pending | |||
Structural Inspection | Pending | |||
Foundation Drain Inspection | Partial Pass | 8/20/2024 | 8/20/2024 | 08/20/2024 |
Ron Norton | ||||
Structural Inspection | Not Ready | 8/21/2024 | 8/21/2024 | 08/21/2024 |
Ron Norton |
Condition | Status | Category |
---|---|---|
Use Tax Reconciliation | Open | Prior to Issuance of CO/CC |
Finance
Use Tax Reconciliation
|
||
Building Department Conditions to be Completed | Open | Prior to Final Building Inspection |
Building Department
The reqeusted special inspection report by the Soil Strucutres Engineer of Record Item 2.3 on sheet RW-2.00 shall be uploaded to the CityView Portal once the Soil Engineer has recieved and signed approval all backfill to be placed. In addition please upload a final conformance letter for from the compancy completeing all special inspections on this project beyond Item 2.3, so the Building Department can retain a copy for your records. Both reporst must be recieved prior to our final inspection being scheduled.
|
||
Miscellaneous Conditions | Resolved | |
Mount Werner Water & Sanitation
Miscellaneous Conditions
|
There are no related items for this permit application.
Date Uploaded | File Type | Name |
---|---|---|
Letter | INCOMPLETE APPLICATION NOTICE.PDF | |
Report | INSPECTION REPORT.PDF | |
Report | INSPECTION REPORT.PDF | |
Letter | PERMIT - DETAILED.PDF | |
Receipt | RECEIPT.PDF | |
Receipt | RECEIPT.PDF | |
06/21/2024 | Study | Soils Report - The Amble (Received) (Stamped) |
06/21/2024 | Plans | Site Plan (Stamped) |
06/21/2024 | Retaining Wall Plans (Stamped) | |
06/21/2024 | Retaining Wall Calculations (Stamped) |