Planning Application Status
PL20230055
You will only be able to view fees if you are a contact on the planning application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Title | Location | Date | Time |
---|---|---|---|
Planning Commission, 2023-08-10, 05:00 PM | Citizens Meeting Room, Centennial Hall, 124 10th Street | 08/10/2023 | 5:00 PM |
Recommendation
Approved with Conditions
|
There are no inspections for this planning application, or you are not authorized to view them.
Condition | Status | Category |
---|---|---|
Site Posting Affidavit | Resolved | Prior to Final Review |
Planning Department
Property Posting (the sign) is required within seven days of a complete application being accepted by the Planning Department.
|
||
Miscellaneous Condition | Resolved | Prior to Issuance of Construction Permit |
GIS
Prior to issuance of construction permit addresses shall be approved by City GIS.
|
||
CDOT Access permit prior to Civils | Resolved | Prior to Approval of Civil Construction Plans or Overlot Grading Plans |
Engineering
Prior to approval of Civil Construction Plans, an approved CDOT access permit shall be submitted to the City.
|
||
Mineral Rights Notification Affidavit | Resolved | |
Planning Department
Submit a signed affidavit no later than eight days prior to the required public hearing confirming the required notice has been completed in accordance with Section 703.C.4.
|
||
Completion Letter (Private Improv.) | Open | Prior to Engineering Final Approval Inspection |
Engineering
Prior to Engineering Final Approval Inspection, a Completion Letter signed and sealed by a Colorado Professional Engineer (Project Engineer) shall be uploaded to the applicable building permit condition.
|
||
Civils Required at BP | Resolved | Prior to Issuance of Construction Permit |
Engineering
Civil construction plans prepared/signed/sealed by a licensed Colorado Professional Engineer are required to be submitted to the RCRBD with a Building Permit/Grading Permit application for review and approval prior to the start of any construction.
|
||
Final Drainage Study prior to BP | Resolved | Prior to Issuance of Construction Permit |
Engineering
Prior to any construction permit issuance, the final signed and sealed drainage study shall be submitted.
|
||
Record Drawings/CAD Files | Open | Prior to Issuance of CO/CC |
Engineering
Record Drawings/CAD Files including drainage, PWQTF(s), and sidewalks shall be submitted prior to Final Engineering Site Inspection.
|
||
Floodplain Development Permit | Resolved | Prior to Issuance of Construction Permit |
Planning Department
Prior to Building Permit or Grade and Fill Permit issuance, the owner shall receive approval of a Floodplain Development Permit.
|
||
Compliance with Flood Prevention | Resolved | Prior to Issuance of Construction Permit |
Planning Department
Prior to approval of any Building Permit for a building that is to be located within the FEMA Special Flood Hazard Area, the applicant shall demonstrate compliance with CDC Section 419, Flood Damage Prevention, by way of a complete “construction drawings” FEMA Elevation Certificate.
|
||
Draft Easements Prior to Civils | Open | Prior to Recording of Final Plat |
Engineering
Prior to approval of Civil Construction Plans or Overlot Grading Plans, the owner shall provide approved final draft documents to the City for the following required easements: • Drainage easements to accommodate offsite drainage through the project site. • Drainage and access easement from Public Street related to the storm water quality treatment facility. • Sidewalk and/or trail easements for public use sidewalks/trails. • Public access easements for public sidewalks which are not completely within the right-of-way. • Cross access easement per West/East Steamboat Springs US Highway 40 Access Study. • Water and sewer easements. • OTHERS
|
||
Miscellaneous Condition | Resolved | Date Certain |
Planning Department
07/27/2023
Provide updated variance narrative.
|
||
Infrastructure Before Plat | Open | Prior to Recording of Final Plat |
Planning Department
The following infrastructure shown on the Preliminary Plat shall be constructed and accepted or approved, or an Improvements Agreement shall be executed prior to recording final plat:
a. Dedicated Easements for all water and sewer mains (Public Mains) must be noted on the Final Plat
b. West access turnaround and sidewalk
c. North sidewalk/trail
d. East 30' public access easement and associated improvements
|
There are no related items for this planning application.