Summary

SPRSW250987
Construction Stormwater
Permit(s) Issued
STEAMBOAT SKI & RESORT CORP.
Alteration
Sewer line replacement along Right-O-Way trail at Steamboat Resort
07/02/2025
07/03/2025

Locations

Property
323800001

Address
34120 FOREST ROAD 321

Permits

Permit Number: SPRSW250987-SW1

Construction Stormwater
Issued

Permit Number: SPRSW250987-LD1

Land Disturbance
Issued

Reviews

Review Type Outcome Est. Completion Date Completed
Construction Stormwater Review Approved 07/24/2025 07/03/2025

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Interim Construction Stormwater Pending
Scott Slamal
Final Construction Stormwater Pending
Scott Slamal
45 Day Inspection Pending 12/14/2025
Scott Slamal
45 Day Inspection Passed 7/10/2025 07/09/2025
Scott Slamal
45 Day Inspection Failed 10/9/2025 08/25/2025
Scott Slamal
Corrections:


Miscellaneous
Carried Forward
08/25/2025
The FODs tracking pad needs to be re-staked down per FODs specifications.

Miscellaneous
Carried Forward
08/25/2025
Additional rock socks or wattle check dams are needed in the swale at the project entrance.

45 Day Inspection Failed 11/23/2025 10/07/2025
Scott Slamal
Corrections:


Miscellaneous
Carried Forward
10/09/2025
Reinstall rock socks where damaged at the bottom inlet noted during the inspection.

Miscellaneous
Carried Forward
10/09/2025
Maintain rock sock check dams in the swale at bottom edge of disturbance.

Miscellaneous
Carried Forward
10/09/2025
Consider installing wattles perpendicular to the slopes in various locations to slow runoff down and minimize erosion.

45 Day Inspection Passed 11/4/2025 11/04/2025
Scott Slamal
Corrections:


Miscellaneous
Outstanding
10/09/2025
Reinstall rock socks where damaged at the bottom inlet noted during the inspection.

Miscellaneous
Outstanding
10/09/2025
Maintain rock sock check dams in the swale at bottom edge of disturbance.

Miscellaneous
Outstanding
10/09/2025
Consider installing wattles perpendicular to the slopes in various locations to slow runoff down and minimize erosion.

Conditions

There are no conditions for this engineering permit application, or you are not authorized to view them.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT0.PDF
Permit PERMIT - DETAILED CONSTRUCTION STORMWATER.PDF
07/09/2025 IMG_1605
07/09/2025 IMG_1606
07/09/2025 IMG_1604
08/25/2025 IMG_1764
08/25/2025 IMG_1757
08/25/2025 IMG_1762
08/25/2025 IMG_1761
08/25/2025 IMG_1760
08/25/2025 IMG_1758
08/25/2025 IMG_1759
10/09/2025 IMG_2026
10/09/2025 IMG_2018
10/09/2025 IMG_2016
10/09/2025 IMG_2027
10/09/2025 IMG_2019
10/09/2025 IMG_2017
11/13/2025 IMG_2250
11/13/2025 IMG_2249
11/13/2025 IMG_2248
11/13/2025 IMG_2246
11/13/2025 IMG_2244
11/13/2025 IMG_2247
11/13/2025 IMG_2245
11/13/2025 IMG_2252
11/13/2025 IMG_2251